Key Takeaways
- Record backlog, space-driven: Order backlog crossed ₹2,268 crores, the highest in company history, with roughly half coming from space sector orders including a mega subcooler win from a U.S. space company.
- Q2 margin dip, not structural: EBITDA margin declined on mix, strategic pricing, geopolitical credit issues and higher logistics costs; management called it non-structural and noted H1 EBITDA margin of 22.3% is within the expected range.
- Beverage kegs scaling fast: Sales grew ~446% YoY and order book rose ~155% YoY, supported by a new 3-year global supply agreement with a leading brewer and 4 of 5 targeted global players now approved.
- Semiconductor entry secured: A small initial piping order from the Dholera fab marks entry into a sector management calls a big opportunity, with bids submitted for two larger scopes and results expected in 4 to 6 weeks.
- What to watch next quarter: Results of the two larger semiconductor bids, commercial clarity on the Andaman Nicobar LNG tender, and whether the U.S. space customer places follow-on orders from the 3 to 4 projects in its pipeline.
Order Book & Revenue Visibility
- Backlog composition: Of the ₹2,268 cr order book, almost 50% is concentrated with 2 to 3 major customers under back-to-back agreements, providing protection if input costs rise.
- Space sector dominance: The backlog includes a mega order for subcoolers from a U.S. space company and combined LOX, subcooler and tank orders exceeding ₹1,000 cr from that customer; management did not break out the subcooler-only value.
- Conversion discipline: Management emphasized disciplined execution, efficient working capital management, stringent quality control and consistent delivery as essential to converting the growing backlog into revenue and sustaining customer confidence.
- Lumpy inflow acknowledged: Q2's >₹1,000 cr order inflow was bulky and may not continue at the same pace, though the company is working on complex, larger projects that could cross these numbers.
- H1 record: H1 FY27 total income of ₹849 cr was a record half-year, and H1 EBITDA of ₹189 cr was the highest-ever half-yearly EBITDA.
Acharya: "During the quarter, we have achieved a significant milestone. Our order backlog crossed INR2,200 crores, making it the highest level in the company's history."
Margins: The Q2 Dip & Recovery Path
- What drove the dip: The Q2 EBITDA margin decline was attributed to a mix of rate, strategic pricing, geopolitical uncertainties, credit issues that ramped up in the quarter, and increased logistic costs.
- Standard vs non-standard mix: Standard equipment faces reasonably good competition and requires competitive pricing to maintain market share; non-standard, custom-built equipment yields better margins due to specialized engineering and project management.
- Freight cost context: For the U.S. aerospace order, scope is ex-works (freight in customer's scope); for the Bahamas order, scope was FAS delivery, so freight costs did not impact those specific projects.
- Recovery thesis: Margins are expected to improve because of the U.S. space order; H2 and FY28 margins are expected to trend upwards compared to H1.
- Range comfort: H1 EBITDA margin of 22.3% is within the expected range, providing comfort that the Q2 dip is not a permanent shift.
Acharya: "The margin dip is a mix of rate and strategic pricing and is not structural. H1 EBITDA margin is 22.3%, which is within the expected range."
Beverage Kegs: The Scaling Story
- Growth trajectory: Sales grew ~446% YoY and the order book rose ~155% YoY in Q2, with strong momentum continuing.
- Global supply agreement: Entered a 3-year global supply agreement with a leading global brewing company; the customer's stated 2027 requirement exceeds ~4 lakh kegs across 22 countries, shared among multiple vendors.
- Approvals milestone: 4 of 5 targeted global beverage players have now approved INOX; the fifth approval audit visit is likely planned in coming months.
- Utilization ramp: On track for yearly targets; utilization expected to rise to 50 to 60% by year-end as previously guided.
- Future optionality: The 3-year agreement provides potential to pursue additional business in 2028 and 2029, subject to customer requirements and further allocations.
Semiconductor: Entry & Opportunity
- Entry order secured: Received a small initial order for piping scope at the Dholera semiconductor fab (Tata Electronics); management stated the numbers are very small to mention but the primary goal was sector entry.
- Larger bids submitted: Bids submitted for two bigger projects covering ultra-high purity gases and conventional bulk gases; results expected in 4 to 6 weeks.
- Opportunity scale: The Dholera fab first phase involves almost 500 to 600 km of piping; other projects like OSAT require cryogenic equipment and piping but in lower quantities.
- Proximity advantage: Close proximity to Dholera and Sanand, where 70% of India's semiconductor work is concentrated in Gujarat, provides a service advantage.
- Skill infrastructure: Inaugurated the "SemiOrbit" Orbital Welding Skill Excellence Center at ITM SLS Baroda University to train welders in orbital and IR welding for semiconductor fab infrastructure; will supply at least 30 to 40 welders per month.
- Data center adjacency: Data centers require similar piping to semiconductor fabs; the company sees this as a strong area of expertise where skilled manpower availability is scarce.
Acharya: "The only one thing in our mind was to enter into this sector. So even if it was a small order, the numbers are very small to mention here perhaps, but it was our entry into that market."
Space & Aerospace: The Anchor Vertical
- U.S. space customer: Received orders for 16 subcoolers (12 LOX, 4 methane) for a space project; design approvals received from customer and third-party agencies; 2 tanks dispatched in the last month with dispatches every second or third month.
- Execution timeline: 10 to 15% of the U.S. aerospace order to be completed by March 2027; the balance 80 to 90% to be completed in FY28, with the aim to complete the assignment next year.
- Future pipeline: 3 to 4 more projects in the pipeline from the same U.S. space customer; management sees very good chances due to demonstrated capabilities.
- Customer ambition: The customer wants to launch at least 1,000 rockets per year (3 rockets per day); 1 or 2 launch pads are not sufficient, implying substantial future equipment demand.
- Indian private space: Received orders from all 4 to 5 startup companies, though in small quantities; working with top 5 private space startups in India; delivered equipment to almost 4 of them so far.
- ISRO opportunities: Bid submitted for semi-cryogenic engine test facility, awaiting results; third launch pad tender expected in another few months, company preparing in advance; LVM3 bidding in evaluation, with management citing competitors' lack of cryogenics experience as an advantage.
- Subcooler technology position: Such equipment will be definitely required for all other space projects going forward due to high-volume, high-flow-rate liquid handling needs; this is the first time the product is being designed for such an application.
Acharya: "I have heard from X that he wants to deliver, I mean, launch at least a 1,000 such rockets every year. That means 3 rockets a day. So if 3 rockets per day, 1 or 2 launch pads are not sufficient. That much I can tell you."
Diversifying Growth Engines
- Industrial gas solutions: Healthy demand continued for storage and transportation equipment; received ~₹60 cr in domestic orders covering transportation equipment, train tanks and large storage tanks.
- Liquid cylinders: Production ramped up meaningfully after manufacturing unit revamp; more than 1,500 liquid cylinders dispatched in H1 FY27 worth >₹25 cr, compared to 1,600 in the entire prior year; INOX is currently the only player with liquid cylinder manufacturing capabilities in India.
- LNG solutions: Secured 40+ LNG semi-trailer orders, ~₹14 cr in storage tank vaporization system orders, and an LNG fueling station order from a leading CGD company.
- LNG railway applications: Following Indian Railways' LNG train launch, received 4 related orders with 2 already dispatched; viewed as a promising new application area.
- Cryo-Scientific: Secured ~₹35 cr order for the LIGO-India gravitational-wave observatory project and ~₹12 cr order from a European customer for TCWS piping prefabrication.
- Wayout microfactory: Started manufacturing the first microfactory at the Savli plant; requirements emerging from Africa, Mexico and the Middle East.
- MRI prototype: First machine under trials now; Expression of Interest for 5 machines underway.
- AIP system oxygen tank: Delivered to L&T, under final testing; next course of action for the next submarine will begin after testing.
Acharya: "We are particularly encouraged by the progress of this business, as we are currently the only player with liquid cylinder manufacturing capabilities, positioning us uniquely in the Indian market."
Capacity, Capex & Competitive Position
- Kandla facility: Recently acquired land near the port; construction work ongoing, expected completion by March of this year; full-fledged product availability from this plant for next year.
- Savli facility: Another 50% space available for expansion.
- Funding position: No constraint; debt-free company with net cash in very good numbers; major funding from internal accruals.
- Automation push: Going for a higher level of automation, digital threads, AI tools and IoT tools for machines and controls.
- Growth ambition: Growing at 18% to 20% minimum; if bigger opportunities come, growth can be much faster.
- LNG-to-power for data centers: Products ready for LNG-to-power projects for data centers; trying to enter this area, seen as the most effective way of handling power requirements for data centers.
Acharya: "The other players, definitely yes, they have a lot of money from the perspective of capex in addition. But from experience in cryogenics, they are lacking. So we have a better chance in all the bidding."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| U.S. aerospace order execution | 10 to 15% of order completed; balance 80 to 90% in FY28 | By March 2027 / FY28 |
| Beverage keg utilization | Rise to 50 to 60% | By year-end FY27 |
| Semiconductor larger bids | Results for 2 bigger projects (ultra-high purity gases, conventional bulk gases) | 4 to 6 weeks |
| Andaman Nicobar LNG tender | Commercial clarity expected | 2 to 3 weeks |
| Kandla facility | Construction completion, full-fledged product availability | March this year / next year |
| EBITDA margin | Remain within guided range; H2 and FY28 margins expected to trend upwards vs H1/FY26 | H2 FY27 and FY28 |
| Growth floor | 18% to 20% minimum; faster if bigger opportunities materialize | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Total income | ₹467 cr, +26.6% YoY |
| EBITDA | ₹100 cr, +10.8% YoY |
| EBITDA margin | 21.3% |
| EBITDA margin excluding other income | ~19.5%, ~230 bps down YoY (per an analyst's math) |
| PAT | ₹66 cr, +7.8% YoY |
| PAT margin | 14.2% |
| H1 FY27 total income | ₹849 cr, record-high half-year |
| H1 FY27 EBITDA | ₹189 cr, highest-ever half-yearly EBITDA |
| H1 FY27 EBITDA margin | 22.3% |
| H1 FY27 PAT | ₹127 cr |
| H1 FY27 PAT margin | 14.9% |
| Order backlog | ₹2,268 cr, highest in company history; 72% from exports |
| Order inflow | >₹1,000 cr in Q2 |
| Space sector order backlog | ~₹1,100 cr, including 16 subcoolers and 16 large tanks for a U.S. aerospace customer |
| Beverage keg sales growth | ~446% YoY |
| Beverage keg order book growth | ~155% YoY |
| Liquid cylinders dispatched in H1 FY27 | >1,500 units, worth >₹25 cr, vs 1,600 in full last year |
| Total fund availability | ₹384 cr, debt-free balance sheet |