Juniper Green Energy Ltd Q1 FY2027 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/uy3w4p115ygwxvtarzjuhixt.pdf

Key Takeaways


The Quarter: What Drove It


BESS: The Strategy Reset

Malik: "At that number we believe a solar plus battery solution is as good as a solar plus wind plus battery solution. Now given the fact that solar plus battery is then easier to execute while not losing out on the returns, it makes common sense logic."

The Merchant BESS Opportunity

Malik: "What we can do is basically if there is a delay, right, on the transmission system further, right, the batteries will come in, right, and they are right now at a sweet spot, right, in terms of the tariffs that are available, right, and the arbitrage that is available. Run it probably for a while on merchant and then get the renewable capacity in."

Pipeline & Tenders: The Thermal Mimic Bet

Malik: "We believe that discussion has happened. SECI, of course, knowing what has happened previously, now again wants to be doubly sure. So I think those discussions have happened and I think generally if you look at how this tender is structured, it is because there have been a lot of changes to make it actually work like a thermal project."

Capacity & Financial Roadmap


Guidance & Commitments

CommitmentSpecificsTimeline
Capacity commissioning250–300 MW additionalQ2 FY27
Full-year capacity addition2 GWFY27
BESS installed capacity4.5 GWhBy June 2027
BESS installed capacityClose to 10 GWhBy March 2028
Run-rate EBITDA~INR 2,700–2,750 crores on ~4 GW capacityFY27
Run-rate EBITDAClose to INR 4,500 crores on ~6 GW capacityFY28
Total capexIncrease from ~INR 16,000 crores to ~INR 22,000 croresBy March 2027
Curtailment elimination at BikanerFull elimination when battery doubles to 200 MWhWithin one month
Merchant BESS capacity1.5 GWh running fully as merchantNext 1–2 years
BESS capacity addition (merchant initially)~700 MWh in stagesBy December 2026
Transmission-risk substation~300 MW substation completionBy December 2026

Key Metrics

MetricQ1 FY27
Total income₹324 cr, +79% YoY from ₹181 cr
EBITDA₹294 cr, +86% YoY from ₹159 cr
EBITDA margin91%, improved ~300 bps YoY
Operating income₹291 cr, +81% YoY
Operating EBITDA₹261 cr, +89% YoY
Operating EBITDA margin90%, +400 bps YoY
Profit after tax₹33 cr, +54% YoY; includes one-time refinancing cost of ₹18 cr
Cash PAT (PAT + depreciation)₹108 cr, +50% YoY
Fleet-wide CUF30.2%, up from 28.2% in Q1 FY26
Generation94.4 crore units, +72% YoY
Wind portfolio CUF (190 MW)49.9% weighted average
Plant availability98.8%
Grid availability99.6%
Capacity commissioned in Q1601 MWp (458 MWp solar, 143 MW wind), highest ever quarterly commissioning; plus 400 MWh of BESS
FY27 full-year capacity addition target2 GW, on track; April-to-date: >760 MW renewable and ~400 MWh BESS commissioned across 8 sites
Days receivable outstanding19 days as on June 30, 2026
Total portfolio~11,200 MW capacity plus nearly 9 GWh of BESS; FDRE and wind-solar hybrid 84% of portfolio; blended weighted average tariff ₹3.7
Operational plus PPA-signed capacity>6.2 GW
Surplus connectivity>4.5 GW over and above pipeline, plus connectivity for >20 GWh of BESS for future bids
Net debt-to-equity3.24x as on June 30 (pre-IPO); post-IPO net worth increased to ₹5,200 cr
Weighted average cost of debt (operational portfolio)~8.5%
Total capex~₹16,000 cr as on June 30; expected ~₹22,000 cr by March '27
Run-rate EBITDA for 2,575 MW commissioned₹1,620 cr
FY27 run-rate EBITDA guidance~₹2,700–2,750 cr on ~4 GW capacity
FY28 run-rate EBITDA guidance~₹4,500 cr on ~6 GW capacity
Curtailment in Q1~2% to 2.5%, restricted to 50 MW merchant plant in Bikaner
BESS round-trip efficiency~91%; state of health ~99.6%
BESS target~4.5 GWh installed by June '27 and 10 GWh by March '28; of 4.5 GWh, 1.5 GWh unlinked to projects to run as merchant
New SECI FDRE RTC tender win870 MW planned capacity plus 2,200 MWh BESS against 230 MW contracted capacity; tariff ₹5.26
GUVNL wind project win50 MW at ₹3.51 per unit
SJVN FDRE PPA signed50 MW at ₹4.25 per unit
Non-DCR module prices closed~₹12.1 to ₹12.2 per watt peak
DCR module price assumed (thermal mimic tender)~₹17 per watt peak