Key Takeaways
- Margin reset, recovery promised: EBITDA margin sat at 12–13% in Q1, dragged by a ~₹100 crore YoY jump in other expenses, but management expects sequential improvement as price increases and cost pass-throughs land in Q2 and Q3.
- Volumes mixed, castings the bright spot: Pig iron external sales fell 3% and tubes fell 14% YoY, while casting demand stayed strong across tractors, autos, earthmoving and stationary engines, with Rajpura fully sold out at ~2,200 tons per month.
- Power costs are the core squeeze: Fuel costs have doubled, green power usage was cut from 17 hours to 8 hours, and power trading income of ~₹10 crore per annum has stopped. The fix is structural: 70 MW of solar and wind capacity commissioning through September.
- Capacity build-out is aggressive and funded: Management committed to ₹3,000–3,500 crores of capex over the next four years, spanning Koppal steel, a Baramati expander mill, and casting capacity doubling.
- What to watch next quarter: Whether the promised Q2/Q3 realization gains actually show up in EBITDA, the pace of solar and wind commissioning, and any recovery in tube volumes and oil and gas order flow.
Margin Walk & Cost Pressures
- Other expenses spike: Other expenses rose ~₹100 crore YoY and ~₹50 crore sequentially. Of that, ₹58 crore was power and fuel, split roughly equally between rate increases (~₹28–29 crore) and higher quantity (~₹28 crore).
- Quantity driver: Higher casting production and sales at Rajpura, plus last year's Jejuri shutdown versus normal full-month operations this year, drove the quantity increase.
- Regulatory squeeze: The company can no longer do power trading, which previously earned ~₹10 crore per annum from the gap between green power and exchange purchases. Green power usage was also cut from 17 hours to 8 hours, adding a small impact.
- LPG pain: LPG consumption cost in Solapur has doubled compared to efficient purchasing before the war.
- Coal cost timing: The company carries roughly 3 months of coal stock, so June, July and August will reflect high-cost coal. Coal prices have since come down slightly, which should mitigate the peak.
- Pass-through status: Cost increases have been passed on in castings. Alloy steels are still under discussion, and the tube market has to pick up before that cost difference can be recovered.
- Sequential promise: Management confirmed EBITDA percentage should improve sequentially because of pig iron factors, with price increase and cost pass-on benefits expected in Q2 and Q3.
Gumaste: "I'm a firm believer that 15% EBITDA plus/minus 1% is a right level to operate on castings."
Segment Performance
| Segment | Trend | Commentary |
|---|---|---|
| Castings | ▲ Strong | Demand strong from all sectors: tractors, automobile, earthmoving, stationary engines. Rajpura at full capacity and sold out. Realization held or slightly improved even as commodity prices fell last year. |
| Pig iron | ▼ Volumes down, realization up | External sales fell 3% because internal consumption rose. Realization improved during the quarter. Currently exporting 30,000 metric tons at slightly better than domestic prices. |
| Tubes | ▼ Weak | Volumes fell 14% YoY. Realization could not hold because the company had to sell more line pipes in the absence of high-realizing export orders and oil and gas tubes. |
| Steel | ▬ Margin range | Steel and tube EBITDA margins have been in the 14% to 17% range. Jejuri power and fuel cost is critical; 35 MW solar and 12 windmills need to be in place. |
- Pig iron drag: The pig iron business has been substantially high for the last 4 years and the company has suffered on it. Overall company-level EBITDA margin got pulled down because of pig iron prices.
- Commodity turn: Management feels the southward commodity price trend has reversed. Pig iron prices have gone up, steel price increases have been announced by many manufacturers, and there is some break to coke dumping into India.
- Tube market wait-and-watch: Dumping from China continues and demand conditions are subdued. The company cannot push too much line pipe into the market; oil and gas and projects should take their share.
Gumaste: "I don't think it will go bad long period, but it's a short period right now."
Power & Green Energy Strategy
- The structural fix: A 35 MW solar plant and 12 windmills of 2.1 MW each are expected to commission between June and September. Combined with 70 MW solar, the projected benefit is ₹70–80 crores.
- Vision: Management wants to bring power cost to 5–6% at company level and is working on alternative fuels to cut the price increase impact. More clarity is expected in coming months.
- Battery storage: The trading window is closed, so a workaround is only possible with battery storage. Management is examining how quickly to move to battery storage systems at megawatt level.
- No aggressive green spend: Management will not put in 500 MW of battery storage. It will start with 50, 60, 70 MW.
- Koppal advantage: Koppal is completely self-sufficient with waste heat recovery power. Maharashtra business has work to do on power and fuel.
Gumaste: "We are also already examining how quickly we can move on to battery storage systems on megawatt level so that we can continue with our journey of solar and wind power and not really go back on that commitment of green power and also thereby the commercial benefits coming."
Capacity Expansion & Projects
- Machining / forward integration: Machine shops have started in all 3 locations: Koppal, Solapur and Rajpura. The company is already supplying fully machined components ready for assembly from all 3 plants, including a 6-cylinder head to an OEM with child parts.
- No-bake foundry: Commissioning shortly, expected by October, with capacity of 1,250 metric tons per month. Within 1 year, it should reach 500–600 tons per month; full utilization one more year after that.
- Rajpura Phase 1: In the next 8 months, capacity expands to 2x current, at least 40,000 to 45,000 metric tons per annum. Phase 2 subsequently takes capacity to 6,000 tons per month or 70,000 metric tons per annum.
- Koppal steel: Decision taken to go ahead with Koppal expansion. All government clearances in place, project report and technology partners ready. Will take 2 years to implement.
- Rolling mill expansion: Enhancing rolling mill capacity to 25,000 tons per month (3 lakh tons annually), up from 15,000 today. Activity starting now, in place within about 18 months.
- Premium couplings: Project started at Baramati for premium couplings. Expect to order this project in the next few weeks.
- Hiriyur upgradation: Working on upgradation to produce pig iron up to 360,000 metric tons, with reduced coal consumption via pulverized coal injection and bell-less top.
- Oxygen plant and PCI: Progressing well on oxygen plant and enhanced pulverized coal injection in Koppal blast furnaces 1 and 2. Completion expected by February–March.
- Large castings customer: One customer wants the full capacity of the large castings foundry. The company has already started working to build more large castings foundry.
Gumaste: "Foundry is a very vast business. And it's like we are talking about 1.2 crore to 1.5 crore tons of castings from India, like China is 4.5 crore, 5 crore tons. We can't do everything. We are selectively looking at what are our strengths? Where are the opportunities? And I can say that we are not the one to miss any opportunities, but at the same time, we can't do everything."
Volume & Growth Outlook
- Pig iron volume: Visibility to go very close to 7 lakh metric tons for this year, could be slightly less.
- Casting growth: Should achieve more than 15% growth. Gross sales from 1,62,000 to maybe 1,88,000, about 17–20% growth.
- Steel growth: Will run full. Expect external sales of at least 1 lakh to 1,10,000 metric tons, more than 20% growth.
- Tube growth: At least 10% volumetric growth compared to last year.
- Overall growth: Volumetric growth of at least 15% overall with all products. Price support should support decent top-line growth in the coming 3 quarters.
- Casting capacity realization: Total realizable installed capacity of 2,70,000 metric tons to be realized in this financial year plus 2 more years. If more foundry is brought, expect to reach 3 lakh metric tons per annum in castings in 3 to 4 years.
- Tube capacity: 3,50,000 metric tons per annum on completion of the expander mill. The expander mill will take 2 years to build; tube to 3,50,000 will take 3 to 4 years.
- Steel capacity: Steel going to 2,40,000 metric tons external sale achievable with Koppal steel commissioning 2 years down the line.
- Oil and gas tubes: Expect orders to flow in. Should be able to increase high-value oil and gas-related tubings in coming quarters, including premium couplings.
Gumaste: "We are still hopeful that with high fuel prices as well as reconstruction requirements in the Middle East. So it has to trigger there is no second thought about it."
Capex & Litigation
- This year's capex: ₹600–700 crores. Next year and the year after, capex would be higher. Every year the company will raise capex to a higher level.
- Total capex: Around ₹3,000 crores to ₹3,500 crores in the next 4 years.
- No waiting: Management sees no point in waiting for anything, including geopolitical scenarios.
- Forest development fee litigation: The Government of Karnataka levied forest development fees in 2016. The company went to high court and the petition came in favour of the company. The government has gone to the Supreme Court. The fee of 8% is being provided and shown as contingent liability.
- Supreme Court status: The case has gone through hearing and order is reserved. Sub judice as of now. No timeline given on when judgment is expected.
Gumaste: "I think there's no point in waiting for anything."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EBITDA margin improvement | Sequential improvement in EBITDA percentage from Q1's 12–13% | Q2 and Q3 |
| Casting EBITDA margin | 15% plus/minus 1% as the right operating level | Ongoing |
| Solar and wind commissioning | 35 MW solar and 12 windmills of 2.1 MW each | June to September |
| No-bake foundry commissioning | 1,250 metric tons per month capacity | By October |
| Rajpura Phase 1 expansion | Capacity to 2x current, at least 40,000–45,000 metric tons per annum | Next 8 months |
| Oxygen plant and PCI completion | Koppal blast furnaces 1 and 2 | February–March |
| Rolling mill expansion | Capacity to 25,000 tons per month (3 lakh tons annually) | Within ~18 months |
| Koppal steel implementation | Steelmaking from MBF, all clearances in place | Commission within 2 years |
| Premium couplings project order | Project order placement at Baramati | Next few weeks |
| Tube order execution | 23,000 tons order from ONGC and probably Oil India | Next 2 quarters |
| Overall volumetric growth | At least 15% overall with all products | FY27 |
| Casting volumetric growth | More than 15%, gross sales to ~1,88,000 tons | FY27 |
| Steel external sales | At least 1 lakh to 1,10,000 metric tons | FY27 |
| Tube volumetric growth | At least 10% compared to last year | FY27 |
| Pig iron volume | Very close to 7 lakh metric tons | FY27 |
| Total capex | ₹3,000–3,500 crores | Next 4 years |
| Power cost benefit | ₹70–80 crores from solar and wind | On commissioning and regular operations |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| EBITDA margin | 12% to 13%, with management expecting improvement in coming quarters |
| Pig iron production | 1,65,120 metric tons, up 5% YoY from 1,57,112 metric tons |
| Castings production | 43,800 tons, up 19% YoY from 36,929 tons |
| Tube production | 51,968 metric tons, down 8% YoY from 56,558 metric tons |
| Pig iron external sales | 1,28,737 metric tons, down 3% YoY from 1,32,392 tons |
| Casting sales | 41,345 metric tons, up 18% YoY from 34,941 metric tons |
| Tube sales | 41,512 tons, down 14% YoY from 48,461 metric tons |
| Other expenses increase | ₹100 crores YoY, of which ₹58 crores is power and fuel |
| Power and fuel cost increase | ₹58 crores, split roughly evenly between rate increase of ₹28 to 29 crores and quantity increase of ₹28 crores |
| Power trading benefit lost | ₹10 crores per annum, due to regulatory change |
| Green power benefit estimate | ₹80 crores per year, down from ₹100 crores per year due to regulation change; payback period extended from 3 years to 3.6 to 3.7 years |
| Contingent liability, forest development fee | ₹350 crores, at 8% fee rate, case sub judice in Supreme Court |
| Pig iron price realization | ₹42,400 per metric ton, up from base of ₹39,000 per metric ton QoQ |
| Pig iron volume guidance FY27 | Close to 7 lakh metric tons, could be slightly less |
| Castings volume growth guidance FY27 | 17% to 20%, gross sales from 1,62,000 to 1,88,000 tons |
| Steel external sales guidance FY27 | 1 lakh to 1,10,000 metric tons, more than 20% growth from about 84,000 tons last year |
| Tube volume growth guidance FY27 | At least 10% compared to last year |
| Overall volume growth guidance FY27 | At least 15% across all products |
| Medium-term revenue aspiration | ₹14,000 crores, with 3 lakh tons casting sales and 4 lakh tons tube sales |
| Total casting capacity target | 2,70,000 metric tons per annum across 6 foundries, realizable in FY27 plus 2 more years |
| Pig iron liquid metal capacity target | 9 lakh metric tons per annum, possibly up to 0.1 crore ton at high efficiency |
| Tube capacity target | 3,50,000 to 4,00,000 metric tons per annum, on completion of expander mill in 3 to 4 years |
| Steel external sales target | 2,40,000 metric tons, achievable with Koppal steel commissioning in 2 years |
| Capex FY27 | ₹600 crores to ₹700 crores |
| Total project pipeline | ₹3,000 crores to ₹3,500 crores over next 4 years |
| Solar power benefit, 70 MW | ₹70 crores to ₹80 crores per year |
| Solar power benefit, 35 MW | ₹30 crores per year |
| Wind power capacity | 55 megawatts equivalent, combined with solar expected to give ₹70 crores to ₹80 crores benefit |
| Tube order book | 23,000 tons from ONGC and Oil India, including couplings, to be completed in next 2 quarters |
| Tube portfolio coverage | 60% of market at up to 10 inches; going to 18 inches would address another 40% |