Key Takeaways
- Pig iron margins finally see a floor: After repeatedly calling a bottom too early, management now says an upcycle is beginning, with January price increases and a 3–4 month coking coal cover offering a short-term margin window.
- Casting demand is strong, but execution is the bottleneck: Solapur foundry ramp-up is slow because complex castings (cylinder heads/blocks) take ~5 years to reach full capacity, not 2–3; quality rejection and new product development are the drag.
- Multiple shutdowns compressed the quarter: Hiriyur pig iron plant stayed idle most of Q3 on weak market conditions, Baramati extended a planned shutdown for a furnace upgrade, and tube volumes dipped 20% QoQ partly on an ONGC dispatch delay.
- The project pipeline is intact and funded: A steel plant order goes in by 31 March, ~130 MW of green power commissions by September, and the Oliver/Punjab Foundry merger closes this year, setting up a 15–20% volume growth target next year.
- What to watch next quarter: Whether the Q4 pig iron margin benefit actually materializes, the pace of Solapur’s monthly volume ramp toward 4,200 tons, and any concrete timeline for the Hiriyur blast furnace upgrade among competing capital projects.
Pig Iron: The Long Bottom
- Price recovery emerging: January brought price increases, and order bookings for the next two weeks suggest the realization benefit should flow into Q4. Management expects 4–5% volume growth in the final quarter alongside the margin improvement.
- Coking coal cover creates a window: Flooding rains in Australia pushed up coking coal prices, but the company holds 3–4 months of coverage and can wait until March to source, when prices may ease. That cover, combined with rising pig iron realizations, sets up a short-term margin opportunity.
- Hiriyur shutdown was demand-driven, not just maintenance: What began as planned maintenance extended through most of the quarter because running the plant at a negative contribution made no commercial sense. The plant simply stayed offline until market conditions improved.
- Scrap dynamics support the thesis: Management argues that European countries discouraging scrap exports, plus emission-driven local consumption mandates, should make imported steel scrap structurally more expensive over time, lifting the floor under pig iron.
Gumaste: "See, I've been talking about it has bottomed out for so many quarters and the bottom was not to be seen. Hopefully, with the upcycle coming in, I can say that bottom is over."
Casting: Strong Demand, Slow Ramp-Up
- End-market demand is broad and healthy: Order books are strong across tractors, automotive, commercial vehicles, and earthmoving equipment. The constraint is entirely on the supply side, not a demand problem.
- Solapur foundry is the bottleneck: Capacity utilization remains unsatisfactory because the plant is developing complex castings (cylinder heads, cylinder blocks, auto blocks/heads) where ramp-up runs at roughly 15% per year. Full capacity on such products takes five years, not two or three, and initial-stage quality rejections are part of the learning curve.
- Volume targets are now specific: Management expects Solapur to reach 4,200 tons/month this year and 5,200 tons/month next year, translating to ~50,000 tons this year and ~60,000 tons next year. Combined with Koppal (~105,000–108,000 tons) and Punjab Foundry (~24,000 tons), total casting output should approach 190,000 tons next year.
- Pricing is sticky by design: Most casting contracts carry raw material price variance clauses, so commodity moves pass through to customers in both directions. Unlike pig iron, casting prices cannot be raised unilaterally; any change must be negotiated and settled, which limits upside but also provides a hedge.
- Margins follow utilization: Contribution and gross margin are directly proportional to volumes, so the path to better casting profitability runs through filling Solapur, not through price.
Gumaste: "if the new foundry is simple casting like housing in Oliver, from 0, we can go to full volume in 2 to 3 years. In case of more complex cylinder heads, cylinder blocks, that too auto block auto heads, etcetera, we should take it that it takes ramp-up would be 15% per year. So full capacity can be reached only in 5 years, not in 2 or 3 years."
Shutdowns & Volume Dips
- Hiriyur pig iron plant: Started as maintenance activity, then extended because bad market conditions meant negative contribution. Management did not address why no shutdown had been flagged earlier for FY26/27.
- Baramati: A planned shutdown was extended to upgrade one of the heating furnaces, but management could not quantify the production loss on the call.
- Seamless tubes: Volumes fell 20% QoQ, driven by the Baramati furnace upgrade and a delay in ONGC order dispatches. The ONGC order will spill into Q4 and cannot be exhausted this quarter. Management clarified the dip was not due to a lack of orders.
- Casting volumes down sequentially: Q3 standalone casting came in at 35,255 tons versus 36,650 tons in Q2. When asked directly about the 4% decline despite strong industry demand, management pointed to Solapur ramp-up challenges and new product development issues rather than providing a specific operational bottleneck.
Projects & Capacity Expansion
- Steel plant at Koppal: Everything is ready; equipment will be ordered before 31 March, with a two-year commissioning timeline from that point. Management targets at least 120,000 tons of steel sales next year.
- Hiriyur blast furnace upgrade: Plans exist to raise total hot metal capacity to 9 lakh tons, with a long-term commitment to produce more hot metal and convert some to steel. However, no firm timeline was given: it could be next year or the year after, as the company must prioritize among steel, green power, and casting capacity projects.
- Green power: 70 MW of solar is already commissioned; another 70 MW of solar and 25 MW of wind are ordered. Commissioning begins from April and everything is expected online by September.
- Tube expander mill: A new mill is being planned to push capacity beyond the current 230,000-ton ceiling.
- Oliver/Punjab Foundry merger: On track to close by the end of this fiscal year. Once merged, the combined casting entity should deliver roughly 45,000 tons per quarter. Oliver's standalone Q3 and nine-month volumes were requested but not provided on the call.
- Two-part foundry: July commissioning remains a possibility.
Gumaste: "we have so many projects which give so many benefits. So we have no choice but to prioritize, whether it is steel project, whether it is solar and wind project, whether it is casting capacity enhancement project."
Segment Volume & Growth Targets
| Segment | FY26 (current year) | FY27 (next year) target | Growth commentary |
|---|---|---|---|
| Casting (incl. Oliver) | ~130,000 tons base | ~190,000 tons | 15–16% growth; Solapur ramp + Punjab merger |
| Pig iron (external sales) | Not specified | 580,000–600,000 tons | Scope for growth next year; Hiriyur upgrade eventually adds hot metal |
| Seamless tubes | ~190,000–195,000 tons | ~220,000 tons | ~10% growth; ONGC spillover + expander mill planned |
| Steel sales | Not specified | At least 120,000 tons | Koppal plant orders placed by March; 2-year commissioning |
| Overall | — | 15–20% growth | Continuing a 14–16% CAGR trajectory |
- Deemed exports continue normally with the top two customers, with a slight increase rather than any softness.
- Tube exports have grown this year despite a 50% duty, though management could not quantify the margin difference versus domestic on the call.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Pig iron volume growth | 4–5% decent growth in Q4 | Q4 FY26 |
| Pig iron margin improvement | Benefit of realization should reflect in Q4; short-term window from coking coal cover | Q4 FY26 |
| Casting volume growth | 15–16% growth including Punjab Foundry vs last year's ~130,000 tons | FY27 |
| Solapur monthly ramp-up | 4,200 tons/month this year; 5,200 tons/month next year | FY26 / FY27 |
| Total casting output | ~190,000 tons | FY27 |
| Tube volumes | ~220,000 tons (from ~190,000–195,000 tons this year) | FY27 |
| Steel sales | At least 120,000 tons | FY27 |
| Green power commissioning | 25 MW wind + 70 MW solar commissioned | By September |
| Steel plant equipment order | Order placed before 31 March; 2 years to commission | Order by 31 Mar 2026; plant by ~Mar 2028 |
| Oliver/Punjab Foundry merger | Merger completed | By end of FY26 |
| Overall growth | 15–20% top-line growth | FY27 |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | ₹3,85,000 tons cumulative sales quantity, +2% YoY; value turnover down 7% YoY due to 9% drop in pig iron prices |
| Pig iron EBITDA margin | ~9% to 10% |
| Casting production | 39,000 tons, +10% YoY |
| Casting sales volume (9M FY26) | 1,05,000 metric tons, +5% YoY |
| Tube sales volume (9M FY26) | 1,37,000 metric tons, +17% YoY |
| Tube sales realization | Down ~11% YoY overall; Baramati down ~16% |
| Steel sales volume (9M FY26) | 60,000 tons, +16% YoY |
| Pig iron price increase (Jan) | ₹4,000 per ton (~10%) in North India; ~₹3,000 per ton in South and West |
| Pig iron annual production capacity | 720,000 tons (7.2 lakh tons) |
| Pig iron external sales target (FY26) | ~580,000 to 600,000 tons |
| Casting volume target (FY26) | ~190,000 tons, including Punjab Foundry |
| Tube volume target (FY26) | ~190,000 to 195,000 tons |
| Capacity utilization – pig iron | Above 100% |
| Capacity utilization – Solapur casting | 68% |
| Capacity utilization – Koppal casting | 93% |
| Green power capacity addition expected | ~130 MW (70 MW solar + 25 MW wind), commissioning by September FY27 |