Key Takeaways
- Volume recovery offset by price weakness: Double-digit production growth across all four segments was muted by lower realizations in pig iron, tubes and steel, leaving FY25 EBITDA at ₹758 cr vs ₹868 cr last year.
- Cost-side levers are loading, not yet firing: Own iron ore, solar power, PCI and oxygen enrichment all began contributing in Q4 but none at full run-rate; the full benefit lands in FY26.
- Tubes is the problem child with a plan: Margins fell below 3% as the business loaded mills with low-margin line tubes to stay utilized; management aims to restore 15% EBITDA "quite quickly" and hit 200,000 tons of sales in FY26.
- Casting demand has genuinely turned: Tractor demand improved, CV demand is steady, and post-tariff inquiries from the Americas are accelerating, supporting a target of 1.6 lakh tons (20% growth) in FY26.
- What to watch next quarter: Whether tube margins begin their promised recovery, the pace of Oliver foundry ramp-up toward 1,500 tons/month, and any concrete progress on the long-pending NSE listing.
Volume & Realization: The Top-Line Tension
- Production grew strongly: Pig iron +14% QoQ, casting +11%, tubes +22%, steel +15%. All segments ran harder in Q4.
- Sales volumes followed: Pig iron sales up 13% YoY in Q4 and 22% for the full year; casting up 15% in Q4 and 10% for FY25; tubes up 8% for FY25; steel up 52% in Q4 but only 5% for the full year.
- Realization dragged everywhere except casting: Pig iron realization fell 8% in Q4 and 6% for FY25; tube realization dropped 7% overall and 4% per ton; casting held steady on richer product mix.
- Casting mix drove premium pricing: Q4 casting realization of ₹1,27,995 per ton came from more intricate, high-value items like auto and earthmoving equipment components; tractor castings are less intricate and lower-priced. Management expects realization to sustain in the ₹125,000-126,000 range.
- CV demand is steady, supply is the bottleneck: Commercial vehicle demand, both deemed export and domestic, is reasonably good. The pressure is on Kirloskar to ramp up supply to meet customers' full requirements.
Gumaste: "Some of the customers wanted like yesterday. So it can't be. Unfortunately, developing the castings, machining, validation, running up the engines or whatever equipment, it takes time. It can't be changed overnight."
Cost Structure: The Margin Recovery Engine
- Three levers, none yet at full strength: Pig iron cost has three components: coke/coal, iron ore, and conversion cost (10-12% of selling price). Efficiency gains are coming from reduced coke consumption (60-70 kg improvement achieved), own iron ore from Kirloskar Bharat mines (₹700-800 per ton benefit), and 35 MW of captive power generation (₹10 crores/month benefit). None of these were fully reflected in Q4.
- Coal price benefit has a 3-3.5 month lag: When coking coal prices fall, the benefit takes over a quarter to flow through because of the inventory pipeline (order, ship, port, plant). Q4 did not fully capture lower coking coal prices; the benefit will show in Q1 and Q2 of FY26.
- Power & fuel cost already improving: Reduced from 8.6% to 6.7% of revenue, a 1 percentage point improvement. Management aspires to bring this down further to 4%.
- Renewable capacity building: A 12.6 MW windmill has been ordered and will be operational during FY26; 30 MW of solar (55-60 MW equivalent) has been approved and should commission during FY26, with a further phase in H2 FY26. Land acquisition for a ~200 MW Beed solar site is progressing but "taking more time than expected."
Gumaste: "Land acquisitions are taking more than reasonable time... land issues are ticklish and taking more time than expected."
Tubes: Loading Mills, Waiting on Margin
- Volume strong, mix weak: Tubes posted 22% production growth QoQ and 8% sales growth for FY25, but PBIT margins fell below 3%. The culprit was product mix: more line tubes were sold, which carry lower margins.
- Strategic choice to stay loaded: Management loads mills with line tubes rather than idling capacity, keeping contribution positive even at thin margins. Chinese imports are hurting realizations in trade and re-drawer segments.
- Capacity now at 150,000 tons of salable tubes: Debottlenecking is complete at Baramati and Ahmednagar; premium couplings production has started. Further machinery installation (retreatment, NDT, hydro testing, multiple handling) is underway to go beyond 200,000 tons.
- Recovery target is explicit: Management aims to restore 15% EBITDA margin in the tube business "quite quickly" and expects to go "very close to 200,000 metric ton of tube sales" in FY26. An oil and gas tender expected by July, plus export OCTG volumes, should support the mix shift.
Gumaste: "If we are compelled to produce and sell line tubes, we will always load the mills. It's better to load the mills than idle the mills."
Casting: The Demand Inflection
- Tractor demand has turned: After two years of struggling to ramp up, casting demand from the tractor industry improved, with seasonal effect plus better loading across all foundries in April and May.
- Post-tariff inquiries accelerating: Following April tariffs, there is increased inquiry and interest from customers to develop more castings from India, particularly from the Americas. Management flagged this as a medium-term opportunity.
- Oliver foundry ramping: Sold over 500 tons in one month and targeting 700-750 tons in the current month, with a path to 1,500 tons per month in the next few months. Solapur Line 2 has parts under development and volume pickup is expected as those components ramp.
- Volume target: Management is targeting close to 1.6 lakh metric tons for FY26 (20% growth vs FY25), with an aspiration to do beyond 40,000 tons per quarter.
Steel & Pig Iron: Volume Push, Capex Choices
- Steel sales lumpy but growing: Steel sales jumped 52% in Q4 but only 5% for the full year. Management is looking to improve sales beyond 1 lakh tons from Jejuri non-steel and tube sales.
- Pig iron volume target: Management aims to move toward 7 lakh tons of liquid metal production, supported by PCI, oxygen enrichment, and a new pig casting machine.
- Furnace conversion decision: Instead of adding a fourth blast furnace, management will upgrade the Hiriyur blast furnace to steel production, similar to Koppal MBF 1 and 2. The Koppal steel furnace has received MOEF clearance and is awaiting state government consent to establish.
- Koppal project timeline: First year will see land development, civil work, and 10-20% advance payments to equipment manufacturers; bigger capex outlays come in years two and three.
Capital Allocation & Governance
- FY26 capex: Expected at ₹500-600 crores, directed toward cost reduction, productivity increase, debottlenecking, the steel plant, solar and wind power, a machine shop at Oliver Rajpura, and infrastructure development.
- NSE listing remains unresolved: Despite being a ~$1B company for almost a year, Kirloskar Industries is not listed on the NSE. Management acknowledged the issue, said there is "no legal hurdle," but cited "ticklish issues" and offered no timeline.
- Guidance posture: Management declined to give revised FY26 guidance or specific aspirational numbers when asked, instead reiterating qualitative targets for each segment. Specific questions on coking coal cost, seamless tube volume breakdown by segment, and casting utilization percentage were deflected or only partially answered.
Gumaste: "Thank you very much for bringing this particular point. I need to take up with my CFO. I think we will put the effort to get it listed. We haven't able to sort out some ticklish issues to -- there is no legal hurdle, but we'll have to get it listed back."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Tube sales volume | Very close to 200,000 metric tons | FY26 |
| Tube EBITDA margin | Restore to 15% | "Quite quickly" |
| Casting volume | Close to 1.6 lakh metric tons (20% growth vs FY25) | FY26 |
| Casting quarterly run-rate | Beyond 40,000 tons per quarter | FY26 |
| Pig iron liquid metal production | Toward 7 lakh tons | FY26 |
| Overall company EBITDA margin | 15%, with casting and tube each at 14-16% | FY27 |
| Power & fuel cost | Reduce from 6.7% to 4% of revenue | Aspirational, no date |
| Oliver foundry ramp-up | 1,500 tons per month | Next few months |
| Capex | ₹500-600 crores | FY26 |
| Windmill (12.6 MW) | Operational | During FY26 |
| Solar phase 2 (30 MW / 55-60 MW equivalent) | Commissioned | During FY26 |
| Solar phase 2 additional (55-60 MW) | Operational | H2 FY26 |
| Koppal steel furnace | Consent to establish awaited; first-year land development and civil work | Timeline starts post-consent |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Revenue (pig iron) | ₹519 cr, up 4% YoY |
| Revenue (casting) | ₹412 cr, up 17% YoY |
| Revenue (tube) | ₹613 cr, up 27.5% YoY |
| EBITDA | ₹199 cr, up from ₹181 cr in Q4 FY24 |
| EBITDA margin (company level, FY25) | 11.5% |
| Power and fuel cost | 6.7% of sales, improved from 8.6% YoY |
| Pig iron sales realization | down 8% YoY |
| Tube sales realization | down 7% YoY, to ₹1,18,074 per ton |
| Pig iron production | 162,000 tons, up 14% YoY |
| Casting production | 32,000 tons, up 11% YoY |
| Tube production | 52,860 tons, up 22% YoY |
| Casting sales volume target (FY26) | beyond 160,000 tons, up from 132,000 in FY25 |
| Tube sales volume target (FY26) | close to 200,000 tons, up from 168,804 in FY25 |
| Liquid metal production target (FY26) | 700,000 tons, up from 631,000 in FY25 |
| Solar power benefit (FY26 expected) | ₹80 cr total, up from ₹40 cr in FY25 |
| Captive iron ore consumption (FY26 expected) | 250,000 tons, up from 57,000 in FY25 |
| Capex (FY26 expected) | ₹500-600 cr |