Key Takeaways
- Record revenue streak, margin slightly softer: Sixth consecutive quarter of record revenue and profitability, while H1 EBITDA margin dipped to 35.79% (vs 37.52% last year) because IPP revenue from large projects is yet to start and the rainy season elongated work.
- The IPP story is a 90%-margin annuity waiting to energize: 1.2 GW of new IPP is under execution; once installed, total IPP hits 1.72 GW and IPP revenue alone crosses ₹1,000 crores at ~90% EBITDA margin. A one-off government substation delay at Khavda pushed that revenue to December.
- The pledge overhang has a hard release date: SBI's sanction letter commits to releasing the entire promoter share pledge by March '27, within six months of the GUVNL projects' COD.
- Order book is deep, but green hydrogen is years away: CPP wins continue (SJVN, Aditya Birla, Avichal) and a ₹1,050-crore UAE data-center order landed, while the green hydrogen prototype is just starting and management says the segment will take "a couple of years" to take shape.
- What to watch next quarter: Whether Khavda revenue actually starts in December, the pace of part-commissioning on the 250 MW solar and 370 MW hybrid projects, and any schematic that clarifies inter-company revenue flows.
IPP Build-Out: The Margin Engine Waiting to Connect
- Scale of the opportunity: 1.2 GW of new IPP is under execution (250 MW solar, 370 MW hybrid, plus wind); once installed, total IPP capacity reaches 1.72 GW and standalone IPP revenue will exceed ₹1,000 crores with an EBITDA margin of around 90%.
- Why margins are temporarily softer: H1 EBITDA margin of 35.79% (vs 37.52% last year) reflects that IPP revenue from the 250 MW and 50 MW portions has not yet been booked, and the rainy season elongated work in both quarters. Once these projects energize, the IPP mix lifts the blended margin.
- Khavda: a one-off government delay, not a structural problem: The 240 MW Khavda IPP project is complete but revenue is delayed because the government substation for evacuation was not ready; the government is expected to finish it by December. The 50 MW portion already started generating revenue from September 2025.
- Capacity ramp timeline: By March '26, IPP capacity crosses 1 GW; by September/December '26, it reaches 1.5 GW; after March '27, it hits 1.7 GW.
- Grid evacuation is secured: KPI holds evacuation approvals of ~3.46 GW, sufficient for upcoming projects; all Gujarat projects have completed load flow studies and transmission permissions.
Salim Yahoo: "after that is installed, then you will see that we will have a 1.72GW of IPP. So according to that our IPP revenue itself will be more than INR1,000 crores with an EBITDA margin of around 90%."
Pledge & Balance Sheet: The Overhang Gets a Clock
- The pledge is collateral, not a fund raise: The promoter share pledge is with SBI as collateral for a term loan, not a pledge against shares or a fund raise.
- Hard release date from the sanction letter: SBI's sanction letter states that by the end of COD of the GUVNL projects (targeted September '26), within six months, the entire pledge will be released, putting the timeline at around March '27.
- Debt-equity discipline: Management commits to keeping debt-to-equity below 2 and says the current level is comfortable compared to industry peers; the company will keep a close watch and not let it go too high.
- Funding secured for the build-out: A ₹3,200-crore term loan from SBI Project Finance Unit has been sanctioned for the 250 MW solar and 370 MW hybrid GUVNL projects, and India's first externally credit-enhanced green bond of ₹670 crores (rated AA+(CE), 65% GuarantCo guarantee) was successfully issued and listed on NSE.
- No equity dilution since the QIP: EPS has improved (H1 ₹8.49 vs ₹4.84 last year); the ₹1,000-crore QIP is done and promoter shareholding remains above 48%. The difference between EPS and PAT growth rates is due to an increased share count from a bonus issue, not dilution.
Salim Yahoo: "By September '26, we will be doing the COD and after that, within 6 months. So by March '27, SBI will release the pledge for all our shares, and that is clear cut terms and conditions in our sanction letter from SBI."
Order Book & New Business
- CPP wins keep stacking: Recent wins include 200 MW solar with SJVN, 96 MW Balance of System for Aditya Birla Renewables, and a 100 MW repeat order from Avichal Power.
- Data-center entry via Fabtech: A partnership with Fabtech Technologies targets renewable energy supply for data centers and life sciences in the Middle East and India; a ₹1,050-crore order for a UAE project has already been received, with a 2-3 year execution horizon.
- Geographic expansion underway: The company entered Maharashtra through the MAHAGENCO project and recently won projects in Rajasthan; it is collaborating with Bondada Engineering for EPC work in Maharashtra.
- CPP order book visibility: Current CPP orders are expected to close by FY26 or March '27, with nothing left beyond that; the company bids with a claimed 75% success rate.
- CPP revenue recognition note: Megawatt count for CPP is recorded only at full COD, not at partial completion, so orders like MAHAGENCO and CIL with majority execution done are not yet reflected in completed megawatts.
- Exit clause exists but has never been used: The 170 MW of C&I open-access PPAs carry a six-month exit clause designed for customer comfort, but no customer has exercised it since 2018; 80% of PPAs are with AA+ rated clients, and some have extended from one PPA to three or four.
Adjacent Bets: Green Hydrogen, Trading & Subsidiaries
- Green hydrogen is a prototype, not a business yet: A 1 MW green hydrogen facility has been constructed at Matar and will begin blending green hydrogen with existing LPG in a few days. Management says the broader green hydrogen and green ammonia segments will take "a couple of years" to gradually take shape.
- These segments sit outside the listed entity: Green ammonia and hydrogen are housed in a separate private company, not part of KPI Green Energy or its subsidiary, so their margins and viability will be assessed separately.
- Power trading license obtained: A Category A Power Trading License positions the company to capture opportunities in open-access and energy trading.
- MOUs signal intent, not revenue: MOUs signed with Delta Electronics India (battery energy storage, green hydrogen, EV charging) and AHES Korea (green ammonia JV) are directional but carry no disclosed financial commitments or timelines.
- Sun Drops Energia listing planned: The subsidiary is expected to list most probably next financial year; its Q1 and Q2 revenue was lower due to rainy-season seasonality, with substantial growth expected in H2 (65-70% more revenue than the previous year).
Salim Yahoo: "we have already constructed 1 MW in Matar for its facility. So, we will be blending green hydrogen with our existing LPG... as far as other things are concerned, it will still take a time I think in a couple of years it will take slowly, it will gradually take a shape."
Market Structure & External Risks
- Stock underperformance blamed on geopolitics: Management attributes the stock's underperformance to geopolitical disturbances, China tariffs, and US tariff issues creating a negative outlook among international investors on India; expects that when stability returns, well-performing companies will recover.
- No impact from international solar tariffs: KPI is a developer, not a panel manufacturer; price wars benefit the company by making panels and materials available at lower prices.
- Government legacy bid closure is not a risk for KPI: The government directed closure of non-viable legacy bids, but KPI only participates at viable rates (e.g., GUVNL wind at ₹3.64) and none of its projects are stuck.
- Grid instability is managed, not feared: Transmission companies now conduct load flow studies before granting evacuation permission; with hybridization, round-the-clock power, battery storage, and smart grid implementations, central and state transmission units are actively working on load flow stabilization. KPI's PPAs are with GUVNL, which management calls the best DISCOM, so revenue is not seen as at risk.
- India's 500 GW renewable target is on track, per management: 252 GW of non-fossil capacity is already completed (127 GW solar, 53 GW wind), 60 GW is under bidding, and 125 GW is under implementation; 25 GW was added to the grid in the last quarter alone. Solar manufacturing capacity exceeds 125 GW with backward integration and supply chain in place.
Salim Yahoo: "So due to that, every stock has taken a hit, including the renewable because this was -- especially into the focus. So these things, I mean, as I told you, whenever there is a stability and there is an economic return and a growth return in the entire world or in the majority, stability in the political, at that time you will find companies which have performed well will immediately jump up."
Inter-Company Structure: The Double-Counting Question
- Management denies revenue double counting: The concern raised by analysts is that KP Energy and KPI Green appear to book revenue on the same orders. Management clarifies that KP Energy earns EPC execution royalty while KPI Green earns annuity revenue royalty, two distinct revenue streams on the same underlying asset.
- KP is a brand, not a consolidated entity: Management compares the KP trademark to Adani or Reliance as a brand umbrella and states it will try to include a schematic in the Q3 presentation to show order flow and revenue clarity across entities.
- Separate concalls for each listed entity: KP Energy and KP Green Engineering concalls are scheduled within the week; KPGL's concall is on the 14th. Management says concalls for each listed company will be conducted separately going forward.
- No corporate action: Management stated no corporate action has been taken and advised against trusting rumours.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Khavda IPP revenue start | 240 MW project revenue begins once government substation is ready | December 2025 |
| IPP capacity milestones | Cross 1 GW; reach 1.5 GW; reach 1.7 GW | Mar '26; Sep/Dec '26; after Mar '27 |
| IPP revenue run-rate | IPP revenue alone exceeds ₹1,000 crores at ~90% EBITDA margin | Once 1.72 GW installed (~1.5 years) |
| Promoter pledge release | Entire pledge released by SBI, per sanction letter terms | By March '27 (within 6 months of COD) |
| Debt-to-equity ceiling | Maintain below 2x | Ongoing |
| CPP order book closure | Current CPP orders fully executed | By FY26 or March '27 |
| Sun Drops Energia listing | Subsidiary IPO | Most probably next financial year |
| Schematic for inter-company flows | Presentation slide clarifying order flow and revenue across KP entities | Q3 FY26 presentation |
| PAT target | PAT reaching ~₹1,000 crores level | FY27 (after March) |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total revenue | ₹641.1 cr, +78% YoY |
| EBITDA | ₹232.4 cr, +73% YoY |
| Profit before tax | ₹158 cr, +63.4% YoY |
| Profit after tax | ₹117 cr, +67% YoY |
| H1 FY26 total revenue | ₹1,255.26 cr, +76.5% YoY |
| H1 FY26 EBITDA | ₹449.3 cr, +68% YoY |
| H1 FY26 EBITDA margin | 35.79%, vs 37.52% in H1 FY25 |
| Basic EPS (Q2) | ₹4.82, vs ₹3.6 in Q1 FY26 |
| Basic EPS (H1) | ₹8.49, vs ₹4.84 in H1 FY25 |
| ROE (H2 FY26) | ~20% |
| IPP capacity under execution | 1.2 GW, total IPP to reach 1.72 GW post-commissioning |
| IPP peak revenue expectation | >₹1,000 cr, with EBITDA margin of ~90% |
| CPP EBITDA margin | 18–20% |
| Combined EBITDA margin | 32–33% |
| CPP order book | 2.41 GW |
| Group-level portfolio | 6 GW, expected to add 1 GW more by FY26 end |
| Evacuation approvals | 3.46 GW |
| Term loan sanction from SBI | ₹3,200 cr, for 250 MW solar and 370 MW hybrid under GUVNL PPA |
| Green bond issuance | ₹670 cr, India's first externally credit-enhanced green bond, rated AA+(CE) |
| Promoter holding | 48% |
| Debt-to-equity target | Below 2 |
| Bidding success rate | 75% |
| Sun Drops Energia Q2 revenue | ₹125-odd cr, with PAT margin of 16–18% |
| Fabtech collaboration order (UAE) | ₹1,050 cr, 100% recognized in KPI order book |