Key Takeaways
- Revenue milestone crossed, margins structurally higher: Consolidated revenue surpassed INR11,000 crores, while the 9M EBITDA margin of ~33.8% reflects a ~280 bps YoY improvement driven by a value-added product mix and logistics efficiencies, not one-off gains.
- The pellet cycle has turned, management says: Pellet EBITDA per ton dipped QoQ as prices fell from ~INR11,000 to ~INR10,000 on a higher export mix, but management believes the cycle has crossed the hump and domestic demand remains strong.
- A copper mine in the DRC is the next growth engine: A 50% JV in a Katanga copper mine, with mining by a Thriveni subsidiary, is expected to contribute INR500-700 crores next year at anticipated margins of 30-32%.
- Capex is fully funded, with peak debt mapped: A INR14,000 crore outlay over this year and next will be funded by ~INR6,000 crores of debt and internal accruals, with consolidated peak debt seen at INR10,500-10,600 crores in FY28, targeting a 1:1 debt-to-EBITDA ratio.
- What to watch next quarter: The Q4 iron ore volume exit rate toward the 20-plus million ton target, the trajectory of pellet realizations after the Q3 dip, and the closing of the pending INR900 crore warrant subscription in March.
Performance Drivers
- Value-added mix is the margin engine: The ~280 bps YoY EBITDA margin expansion is structural, coming from a higher share of pellets, the benefit of the slurry pipeline flowing into the P&L, and better utilization across mining, pellet, and DRI operations.
- Pellets ramped fast but price softened: The second pellet plant achieved its production run rate within 3-4 months of commissioning, supported by captive iron ore and slurry-based evacuation. However, pellet EBITDA per ton declined QoQ because prices fell from ~INR11,000 in Q2 to ~INR10,000 in Q3 as more export volume was added to the mix.
- Thriveni EBITDA normalized after a rain-hit H1: Thriveni's EBITDA doubled QoQ in Q3 because rains and local factors had suppressed production in the first half. With Q3 operations returning to the original strike rate, management indicated this is the normal run rate.
- Logistics, not marketing, is the binding constraint: The company is not constrained in mining or marketing iron ore; the area being focused on solving is logistics, with the second slurry pipeline capacity now increased to 1.6 crore tons to cover the entire 2.6 crore tons of dispatches.
- Geographic advantage supports pellet realizations: The location allows marketing to the South and Chandrapur area, giving pellet realization and EBITDA around INR4,500 per ton due to market-friendly dynamics and lower logistics costs.
Rajesh Gupta: "If you look at iron ore in India, the growth is around 5%-6%, the steel growth is around 8%-9% even now. If you look at 5 years CAGR, it is 5%-6% for iron ore and around 9%-10% for steel. So, there has been a continuous shrinkage of the supply, extra supply and therefore exports either in the form of low-grade iron ore or in the form of pellets have reduced. So, the overall supply-demand gap is very, very favourable in supply of iron ore, number one."
Projects & Expansion Pipeline
- Steelmaking entry set for FY27: FY27 will mark the formal entry into steelmaking, with a 0.12 crore ton wire rod mill to be commissioned by Q4 FY27.
- Pellet capacity being upsized: Both pellet plants will be increased to 1 crore tons each from the earlier 0.8 crore tons.
- Second slurry pipeline expanded in scope: The planned pipeline from Hedri to Chandrapur will now have 1.6 crore tons capacity, up from 0.5 crore tons, to cover the entire 2.6 crore tons of dispatches. A stockyard at Chandrapur is a key design change to move beneficiated ore through the pipeline route. The total cost includes a second phase connecting to more markets and ports.
- Pipeline cost savings quantified: The pipeline delivers a saving of INR850 per ton for sale material and around a further INR250 per ton (total ~INR1,250) for material used for the pellet plant in Chandrapur.
- BHQ plant on track for end-CY27: Land procurement is under control, engineering is complete, and equipment has been ordered from best-in-class suppliers including FLSmidth. Commissioning is targeted by December 2027. Royalty on BHQ would drop from ~INR1,200 to ~INR200 per ton, with power as the biggest processing cost; management is working on greening power and using best technology for strong uptimes. The premium on BHQ output, if all ore were sold, would be around INR1,400 per ton.
- PB North West coal block begins production: The block has commenced production and dispatches and is expected to scale meaningfully over the next few quarters. It also achieved a 5-star rating from the Ministry of Coal, ranking number one among more than 380 opencast mines in the country.
Rajesh Gupta: "Royalty is not zero. Royalty would be around from 1,200 would come down to around INR200 rupees. And processing of the ore would involve some power, which is the biggest cost. We are working on getting greening our power also as well as other operations, and that's where that's what I said we are using the best technology to ensure that the systems are very, very strong and uptimes and efficiency of the plant is the best."
Thriveni MDO Business
- FY26 guidance maintained: Management stuck to the earlier EBITDA guidance of INR2,000-2,200 crores for FY26, with revenue around INR7,500-plus crores.
- FY27 step-up driven by multiple contracts: EBITDA is expected to be close to INR3,000 crores, with revenue crossing INR10,000 crores. Growth drivers include a ~40% increase in external iron ore, ~15% growth in the NTPC coal contract, and new contributions from gold and copper at Katanga, partially offset by reductions of ~65% in barytes and ~25% in Indonesia.
- Margin improvement reflects operating leverage: The better margin profile comes from higher equipment utilization, better operating leverage, and continued cost discipline across projects.
Rajesh Gupta: "'28-'29, see it's a contracting company, we are looking at contracts on a continuous basis. It would be very difficult to see, give a further guidance than what we have. Even the guidance that Mr. Naredi just gave would have some surprises upwards because some contracts would come up hopefully future."
Copper & Strategic Partnerships
- DRC copper mine is a milestone diversification: The project in the Katanga area of the Democratic Republic of Congo, with a 50% stake in a JV, will mark a very important milestone. The existing promoter had set up the copper plant but it is not running; mining will be done by a subsidiary of Thriveni. Anticipated margins are approximately 30-32%, contributing INR500-700 crores next year.
- Tata Steel MoU is non-binding and separate from the steel plant: A non-binding MoU has been signed for multiple collaborations to strengthen the ecosystem in the Gadchiroli area and the eastern belt of India. A shareholder agreement for the BRPL pellet plant, along with a conversion pellet agreement, has been executed, giving steady cash flow. Management clarified this MoU is for a different plant than the integrated steel plant in Gadchiroli, whose plans are internal and unrelated.
Rajesh Gupta: "When we expanded our operations in Gadchiroli, the region was considered difficult and impossible, and we ourselves had failed in execution where we have now learned a lot. The market as well as the local communities have appreciated the efforts that we have put in, in developing the economy and therefore our business. And we generally believe that over time, the same narrative will emerge for Congo, Katanga as well as other parts of the world."
Balance Sheet & Funding
- Capex outlay is INR14,000 crores over two years: The company intends to fund around INR6,000 crores from debt and the balance from internal accruals.
- Peak debt mapped to FY28: Consolidated peak debt should be around INR10,500-10,600 crores, with a target of 1:1 debt to EBITDA.
- Warrant proceeds imminent: Around INR900 crores from warrants is pending and expected in March (between the 15th or 18th).
- Debt repayment schedule not disclosed on the call: When an analyst asked for the scheduled debt repayments and principal payment schedule, management declined to provide it on the call, offering to share it separately.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Iron ore volume exit | Exit FY26 with 20-plus million tons volume on ore | FY26 exit |
| FY26 iron ore target | Achieve 2 crore-2.1 crore tons for the year | FY26 |
| Thriveni FY26 EBITDA | INR2,000 crores to INR2,200 crores | FY26 |
| Thriveni FY26 revenue | Around INR7,500-plus crores | FY26 |
| Thriveni FY27 EBITDA | Close to INR3,000 crores | FY27 |
| Thriveni FY27 revenue | INR10,000-plus crores | FY27 |
| Odisha volumes growth | Grow by nearly 40% YoY | FY27 |
| BHQ plant commissioning | Commissioned by December 2027 or latest by that time | Dec 2027 |
| Wire rod mill commissioning | 0.12 crore ton mill commissioned | Q4 FY27 |
| Peak consolidated debt | Around INR10,500-10,600 crores, targeting 1:1 debt to EBITDA | FY28 |
| Copper contribution | INR500-700 crores at ~30-32% margins | Next year (FY27) |
| Warrant proceeds | ~INR900 crores expected | March (15th-18th) |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Consolidated revenue | Crossed ₹11,000 cr, a significant milestone |
| Standalone total income | ₹3,875 cr, up 129% YoY |
| Standalone EBITDA | ₹1,317 cr, up 137% YoY |
| Standalone PAT | ₹889 cr, up 128% YoY |
| Standalone EBITDA margin | ~34%, 9M FY26 at ~33.8%, up ~280 bps YoY |
| 9M FY26 standalone total income | ₹8,859 cr, up 59% YoY |
| 9M FY26 standalone EBITDA | ₹2,994 cr, up 74% YoY |
| 9M FY26 standalone PAT | ₹2,129 cr, up 71% YoY |
| Iron ore production | 0.55 cr tons in Q3, 1.29 cr tons in 9M FY26 |
| Iron ore dispatches (sales) | 0.41 cr tons in Q3, 1.01 cr tons in 9M FY26 |
| Iron ore EBITDA per ton | ₹1,825 in Q3, ₹1,951 in 9M FY26 |
| Pellets production | 0.11 cr tons in Q3, 0.2 cr tons in 9M FY26 |
| Pellets realization | ~₹10,289 per ton, down from ~₹11,000 in Q2 due to higher export mix |
| Pellets EBITDA per ton | ~₹4,535, supported by captive iron ore and slurry evacuation |
| DRI volumes | ~0.01 cr tons in Q3, 0.03 cr tons in 9M FY26 |
| Value-added products share | ~35% of standalone revenues for 9M FY26 |
| Standalone capex | ~₹4,236 cr during 9M FY26, on track and within approved budgets |
| Thriveni total income | ~₹2,200 cr, EBITDA ~₹550 cr, margin ~25% |
| Thriveni 9M FY26 revenue | ~₹5,480 cr, EBITDA ~₹1,080 cr, margin ~20% |
| Consolidated net debt | ~₹7,100 cr as on 31st December, not expected to exceed this in FY26 |
| Peak consolidated net debt | ~₹10,500–10,600 cr expected in FY28, targeting 1:1 debt to EBITDA |
| Iron ore volume run-rate | ~0.24–0.25 cr tons in January, crossing 2.6 cr tons overall |
| FY26 iron ore volume target | 2.0–2.1 cr tons, on track to achieve |
| Second slurry pipeline capacity | 1.6 cr tons, connecting mines to Chandrapur plant and markets |
| BHQ royalty saving | Royalty to drop from ~₹1,200 to ~₹200 per ton |
| BHQ output premium | ~₹1,400 per ton if all ore were sold |
| IPS benefits | ~₹130 cr for the year so far |
| Copper cathode price | ~$11,000–$12,000 per ton, with a premium for Congo location |
| Copper anticipated margin | ~30–32%, contributing ₹500–700 cr next year |
| Thriveni FY26 revenue guidance | ~₹7,500+ cr |
| Thriveni FY27 revenue guidance | ₹10,000+ cr |
| Thriveni FY27 EBITDA guidance | Close to ₹3,000 cr |
| Thriveni FY27 top line growth | ~15–20%, bottom line growth ~35% |
| External iron ore growth (Thriveni) | ~40% increase in FY27 |
| External coal growth, NTPC (Thriveni) | ~15% growth in FY27 |
| Barytes operations reduction (Thriveni) | ~65% reduction in FY27 |
| Indonesian operations reduction (Thriveni) | ~25% reduction in FY27 |
| Gold mine output (Thriveni) | 0.03 cr tons, EBITDA expected ~₹60 cr |
| PB West record monthly coal production | 17.7 lakh tons in December |
| Odisha volumes growth | ~40% YoY expected in FY27 |
| Gadchiroli environmental clearance | Increased from 1 cr tons to 5.5 cr tons, including BHQ |
| Capex outlay FY26–FY27 | ~₹14,000 cr, with ~₹6,000 cr from debt, balance from internal accruals |
| Warrants proceeds pending | ~₹900 cr, expected in March |