Key Takeaways
- Order book collapsed, Q2 stays muted: The order book fell to ₹1,149 crores, down roughly ₹400 crores, and with one month of Q2 already passed, management expects no meaningful margin recovery in the September quarter.
- Chinese dumping is back as a material threat: The 2021 anti-dumping duty renewal failed to raise the minimum import price, so by 2023–2025 it became non-prohibitive, letting Chinese cylinder pipes undercut domestic realizations.
- PAT held up only because of the treasury: EBITDA fell 41% but PAT declined just 4%, cushioned by ₹160 crores in other income from the mutual fund portfolio now marked at ₹2,339 crores.
- Management chose margin over volume and will keep choosing it: The company could cut prices another ₹3,000–₹4,000 per ton to fill the plant but refuses, prioritizing per-ton profitability, a trade-off it explicitly owns.
- What to watch next quarter: Whether ONGC and Oil India tenders actually convert to orders, any progress on the anti-dumping petition for cylinder pipes, and the pace of cold-drawn pipe dispatches as new machines come online.
Order Book & Demand Environment
- Two equal culprits: Management attributes the order book decline equally to reduced oil and gas sector expenditure and Chinese dumping, with cylinder pipes the key product where dumping is visible.
- Tenders exist, orders don't: ONGC and Oil India have announced higher capex and issued some tenders, but actual ordering is much slower than the same period last year, and the minimum order quantity placed so far is very small.
- The math to recover: To get back to a ₹1,500 crore order book while running ₹500 crores in monthly sales, the company needs roughly ₹1,000 crores of new orders in the next two months, a pace management does not expect.
- Water sector also soft: The ERW segment, which serves water and oil, is hit on both fronts: oil sector expenditure slowdown plus reduced Jal Jeevan Mission activity.
- No competitor share loss: The order book reduction is an industry-wide demand problem, not competitors taking share; one competitor is adding capacity but management points out that peers have historically struggled financially.
Bengani: "Sir, I mentioned in my opening statement that there is a slowdown in oil and gas sector expenditure. No matter how much I want to grow, I cannot sell if someone doesn't want to buy."
Chinese Dumping & Anti-Dumping Defense
- How the duty lost its teeth: An anti-dumping duty imposed in 2016 via a prohibitive minimum import price was renewed in 2021 without increasing that price, so by 2023–2025 it became ineffective, allowing Chinese products to enter India easily.
- Cylinder pipes are the battleground: This value-added product is where dumping is most visible, and including it in the next duty renewal is the company's priority to protect both tonnage and margin.
- Domestic oil and gas projects are shielded: Preference for domestic manufacturing means Chinese dumping does not directly hit oil and gas project pipes, but that protection is irrelevant when domestic customers are not spending.
- Renewal strategy: The duty comes up for renewal in October 2026; the company has started data preparation and will petition for a higher minimum import price and broader product coverage.
Bengani: "The anti-dumping duty is again up for renewal in October 2026 and we will definitely petition for a higher minimum import price and a larger coverage of the products that we manufacture."
Margins & Pricing Strategy
- Realization hit from two sides: EBITDA per ton fell because sales realizations dropped, driven by Chinese dumping pressure and a ₹2,500–₹4,000 per ton decline in raw material prices that passed through to product pricing.
- The deliberate trade-off: Management could cut prices another ₹3,000–₹4,000 per ton to run the plant full but chooses not to, explicitly prioritizing per-ton profitability over volume.
- Q2 margin outlook: One month into Q2, the order book does not look encouraging, and EBITDA per ton is not expected to be higher than the September quarter, which itself is expected to be muted.
- No planned shutdown help: Last year's Q1 had a planned shutdown that depressed the base; this quarter had no such shutdown, so the margin decline is purely operational.
Bengani: "If we reduce our prices by Rs. 3,000-Rs. 4,000 per ton further and which would mean a decline in EBITDA by an additional Rs. 3,000-Rs. 4,000 per ton, then we can easily run our plant and machinery. There is no problem on that front. But we want to maximize profitability and then that trade-off has led to a decline in order book."
Treasury & Capital Allocation
- The ₹160 crore cushion: Other income of ₹160 crores, driven by the mutual fund portfolio, compressed the PAT decline to 4% against a 41% EBITDA drop.
- Portfolio mechanics: The ₹2,339 crore mutual fund value includes notional profit accrued and is restated at quarter-end; other income captures both realized and unrealized gains, with tax paid only on realized gains and a deferred tax liability on the rest.
- Cash conservation defended: Management cites future technology obsolescence risk, the need to eventually replace existing plant and machinery in entirety, as one reason for holding cash rather than distributing it.
- Inorganic search continues: The company is still looking for acquisition opportunities but has found nothing that fits its method of doing business.
- No holding company split: An analyst suggestion to split into a holding company and a seamless company went unaddressed.
Bengani: "There will come a time in future when we have to replace the existing technology in entirety with new technology and that is also one of the reasons why we are conserving the cash."
Capacity Expansion & Projects
- Telangana plant on track: Purchase orders of ₹80 crores issued, ₹46 crores expensed; the project is expected to complete within the ₹184 crore budget, with production starting by January 2026.
- Cold-drawn pipes ramp-up: Machines are received; one installs in August, the second by September; dispatch quantities should improve from the December quarter onward.
- Rig deployment pending: The rig will be deployed by Jindal Drilling with ONGC at a rate of roughly $17,000–$18,000 per day payable to Maharashtra Seamless, subject to shareholder approval at Jindal Drilling's upcoming AGM.
- Current capex is the only capex: The ₹852 crore plan on slide 14 is the sole capex program; any new plan will come only after this is completed.
- Hot mill upgrade deferred: Work has not started and will be addressed only once the Telangana line is finished.
Product & Market Positioning
- Premium connections still distant: The product launch involves a tie-up with a foreign partner, a process management calls "excruciatingly time consuming," and no definitive date can be given.
- Seamless tonnage flat for now: The company expects to match last year's 442 level; guidance will be revised only when the Telangana line is operational.
- ERW stays small: The ERW segment contributes 7–8% of total EBITDA; the company is not growing it because seamless is more profitable.
- Market leader by default: Management sees itself as the market leader and notes it has not known any other situation for 35 years, attributing competitors' struggles to a different method of doing business.
Bengani: "You will find that hard to believe that launching a new product takes that much time, but it involves a tie-up with a foreign partner and that process is excruciatingly time consuming and that is why it is taking that much time."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Telangana plant production start | Some production, if not the entire line | January 2026 |
| Cold-drawn pipes dispatch improvement | Quantity dispatched to increase | December quarter onwards |
| Anti-dumping duty petition | Higher minimum import price, broader product coverage | Before October 2026 renewal |
| Rig deployment with ONGC | Rate of ~$17,000–$18,000 per day to Maharashtra Seamless | Subject to Jindal Drilling AGM approval |
| Order book recovery to ₹1,500 crore level | Requires ~₹1,000 crores of new orders in 2 months | Not expected in near term |
| Seamless tonnage guidance revision | Will revise upward from 442 level | When Telangana line is operational |
| New capex plan | Any plan beyond current ₹852 crores | After current plan completion |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue | ₹1,303 cr, -11% QoQ |
| EBITDA | ₹165 cr, -41% QoQ |
| EBITDA per ton | ~₹13,000, vs earlier guidance of ₹15,000–₹18,000 |
| PAT | ₹234 cr, -4% QoQ |
| EPS | ₹17 per share |
| Other income (treasury contribution) | ₹160 cr booked in other income |
| Treasury balance | ₹2,919 cr as on 30 June 2025 |
| Order book | ₹1,149 cr, -₹400 cr QoQ, decline not seen for at least 12 quarters |
| Seamless pipe dispatches | ~1,03,000 tons |
| Raw material price movement | -₹2,500 to -₹4,000 per ton QoQ |
| Capex plan (total) | ₹852 cr |
| Telangana project budget | ₹184 cr, purchase orders of ₹80 cr issued, ₹46 cr expensed |
| ERW segment EBITDA contribution | 7–8% of total EBITDA |
| Credit rating | AA+, upgraded from AA in previous calendar year |