Key Takeaways
- Quartz turns the corner: The quartz business became EBIT positive in Q2, and management expects PAT profitability for the full year for the quartz business, with volumes set to ramp sharply in H2.
- Pricing power sticks: Fuel costs rose ~30–35% YoY and the full ~6% cost increase was passed to customers; management says the price hike will not be rolled back if fuel prices come back to the ordinary range.
- Rare earth pipeline is real and imminent: Sri Lanka and Indonesia projects are expected to start ground work next quarter; some domestic state tenders may open in the next 12 months.
- Cash flow stretched, not broken: Negative operating cash flow in H1 came from a deliberate ~₹25 cr domestic credit extension, ~₹14 cr inventory build, and ~₹20 cr in quick payables settlement; working capital days rose to 127 but management says gearing ratios are retained at the same levels as the past year.
- What to watch next quarter: Whether quartz volumes hit the 12,000–15,000 ton monthly target in Q3, whether Sri Lanka or Indonesia actually breaks ground, and whether working capital days begin to retreat as the domestic credit push ends.
Quartz: The Inflection Quarter
- EBIT positive, PAT expected: The quartz segment turned EBIT positive in Q2 FY27; management guided to PAT profitability for the full financial year, with Q3 and Q4 production reaching desired levels that will lift consolidated numbers.
- Volume ramp is steep: Q3 full-quarter target is 25,000–30,000 tons, rising to 35,000–40,000 tons for the full Q4 quarter; the goal is to touch 15,000 tons/month by March and 18,000 tons/month consistently next year, with next year's volume at least close to double the current year.
- Q2 margin caveat: Quartz EBITDA appeared unusually high in Q2 because contaminated material scrapped in Q1 (and not counted in inventory) was treated and sold in Q2, creating a one-off boost. Excluding this, H1 EBITDA is close to 12% as of now.
- Phase 2 underway: Building construction has started and machinery orders are placed; regular product commissioning is expected by Q2 next year, with HPQ commissioning by Q3/Q4 next year. The entire ₹120 cr capex will be spent over the next four quarters.
- Margins at full utilization: At 15,000–18,000 tons, EBITDA is expected to be higher than the traditional granite business, based on current cost structure and realizations.
- Demand hedge in place: Management is positioning quartz product to Thailand, Vietnam and Europe as a hedge against a potential US oil tariff on India and China, though customers currently do not see that risk.
Ram Kollareddy: "But our concern, frankly, for this quarter was the oil tariff that U.S. was going to impose on India and China. And keeping that in mind, we started positioning the product to other countries also. We're not waiting for that."
Rare Earth: Three Projects, One Timeline
- Sri Lanka first to revenue: The company is internally confident of getting permissions to start building on the ground from next quarter onwards; work is expected to start next quarter, with first revenue ahead of the other projects.
- Indonesia close behind: PERMINAS Indonesia is on track to sign a definitive agreement this quarter, with ground work to start next quarter; revenue is expected 2–3 quarters after Sri Lanka, if started from next quarter.
- KMML waiting on government: The Kerala project is delayed while a new administrative team is formed; management hopes for resolution this quarter but acknowledges the timeline is beyond its control.
- Domestic tenders emerging: State governments, especially in southern states, have started calling industries for thoughts on floating tenders for Indian HMS projects; Andhra, Odisha and Kerala are expected to act in the next 12 months, and the company will participate if they come.
- Premium pricing is structural: Non-China rare earth oxides will carry a premium because magnet production lines outside China need oxides China will not supply; the magnet market is growing 12–13% annually, adding 50,000–60,000 tons/year, so even if the rest of the world doubles production it only meets the increase, not the baseline.
- India self-sufficiency play: PLI magnet plants commissioning in 2–3 years will match the timeline of Indian rare earth plants; management hopes India can be self-sufficient without imports.
Ram Kollareddy: "even if the world doubles their production, they'll be only able to meet that increase. They'll still not be able to touch the baseline."
Granite & Base Business
- Volume growth solid: H1 FY27 saw ~14% volume growth, though not evenly distributed across periods; some periods were higher, some closer to 10%.
- H2 seasonality tailwind: Q3 and Q4 will be stronger than Q1/Q2, in line with normal seasonality; no cyclone impact is expected this year, unlike last year's Q3 anomaly.
- Revenue growth expectation: Management expects ~14%–15% revenue growth in the natural stone segment, composed of 10%–12% volume plus 3%–4% currency benefit.
- Mine rectification contained: Temporary high-wall rectification work at one mine (Galaxy) will take 5–6 weeks from now, with machinery moved to a neighboring mine; no significant production impact is expected.
- New mine LOIs: LOIs received from APMDC to operate three new granite mines in Andhra State on a raising-cum-sale contract basis with low upfront investment.
Margins, Costs & Pricing
- Fuel cost fully passed through: Fuel costs rose 30–35% YoY in H1, translating to a ~6% overall cost increase; the entire 6% was passed to customers via price increases and fully absorbed by the market.
- Pricing increase is permanent: Management explicitly stated the price increase will not be rolled back even if fuel prices decline; if fuel costs cool, the bottom line benefits automatically.
- Export realization boost: Export realizations increased from the fuel-driven price hikes plus an additional ~4% benefit from dollar movement.
- Consolidated PAT drag: Consolidated PAT at 16.37% was dragged down by the negative contribution from the quartz segment, where fixed costs are not yet absorbed; granite standalone PAT is ~18%.
Uma Kollareddy: "In fact, because we've increased this pricing, and post settling down, post the US elections and post, if the fuel prices come back to the ordinary range, we will not roll back on the pricing. So that positive impact in pricing is there to stay."
Cash Flow & Working Capital
- Negative operating cash flow in H1: Driven by three deliberate factors: ~₹25 cr increase in receivables from extended credit to domestic cutter factories following the GST rate cut on stone from 12% to 5%; ~₹14 cr inventory addition across quartz and granite; and ~₹20 cr in quick trade payable settlements to obtain discounts.
- Working capital days rose to 127: Up from 104 days in FY26, due to the domestic receivables push and the new APMDC JV not yet having a bank discounting facility without recourse, unlike existing entities where receivables are knocked off on bill confirmation.
- Credit policy tightening ahead: Management stated no additional credit periods will be extended to the domestic market going forward; working capital days should come down in coming quarters.
- Gearing unchanged: Despite the working capital stretch, management says overall cash flow remains healthy and gearing ratios are at the same levels as the prior year.
Sustainability & Cost Transformation
- Electric fleet conversion: 10 electric trucks already deployed, saving ₹2–₹2.5 cr/year; the plan is to convert the entire fleet to electric trucks in the next 24 months.
- Solar power build-out: A 1 MW solar power plant installation is in progress and will complete this financial year; the company plans to increase solar power consumption by several megawatts for both quartz and natural stone businesses via a low-capex group captive model, with an initial ₹2 per unit saving that may increase if power costs are stressed.
- Quartz electrification later: The process of electrifying quartz transport will start in Q4 of this year itself once production is streamlined; these savings are not yet factored into quartz margin projections.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Quartz PAT profitability | Quartz business to be PAT positive for full year | FY27 |
| Quartz Q3 monthly volume | 12,000–15,000 tons per month | Q3 FY27 |
| Quartz Q4 monthly volume | 35,000–40,000 tons for the full quarter | Q4 FY27 |
| Quartz FY27 revenue | ~₹90 cr, could reach ₹100 cr if 15,000-ton mark hit early January | FY27 |
| Quartz Phase 2 regular commissioning | Building started, machinery ordered | Q2 next year |
| Quartz Phase 2 HPQ commissioning | HPQ line operational | Q3/Q4 next year |
| Phase 2 capex spend | Entire ₹120 cr spent | Next four quarters |
| Granite revenue growth | ~14%–15% (10%–12% volume + 3%–4% currency) | FY27 |
| Sri Lanka ground break | Permissions expected this quarter, building start next quarter | Next quarter onwards |
| Indonesia definitive agreement | On track to sign | This quarter |
| Indonesia ground work | Start after agreement signed | Next quarter |
| Electric fleet conversion | Entire fleet to electric trucks | Next 24 months |
| Solar power expansion | Increase by several megawatts via group captive model | Ongoing, plant completing this FY |
| Mine rectification | High-wall issue at Galaxy mine resolved | 5–6 weeks from now |
| Working capital days | Come down as no additional domestic credit extended | Coming quarters |
| 3–4 year targets | 2.5x revenue growth, 3x profitability, 35% ROCE, backed by ₹300 cr capex | 3–4 years |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue | ₹182 cr, +15% QoQ and +9% YoY |
| H1 FY27 revenue growth | 24% YoY |
| H1 FY27 PAT growth | 18% YoY |
| Consolidated PAT margin | 16.37% (H1), dragged by negative contribution from quartz |
| Granite standalone H1 PAT margin | ~18% |
| Leverage ratio | 0.2x |
| Granite volume growth | ~7% YoY (Q2); 14% (H1) |
| Granite revenue growth expectation (FY27) | 14%–15% (volume 10%–12% plus currency 3%–4%) |
| Quartz volume | 16,000 tons (Q2); Q3 estimate 25,000–30,000 tons; Q4 estimate 35,000–40,000 tons |
| Quartz revenue | ₹13.5 cr (Q2); FY27 guidance revised to ~₹90 cr |
| Quartz realization | ~₹8,500/ton (Q2); full-year average expected ₹9,500–₹9,600/ton |
| H1 quartz EBITDA margin | ~12% |
| Granite realization – Black Galaxy export | ~₹88,000/cubic meter |
| Granite realization – Absolute Black | ~₹39,000–₹40,000/cubic meter |
| Granite realization – Black export (higher grade) | ~₹1 lakh/cubic meter |
| Working capital cycle | 127 days (H1 FY27), up from 104 days in FY26 |
| Cash flow from operations | Negative (H1 FY27), driven by ~₹25 cr receivables, ~₹14 cr inventory build, ~₹20 cr trade payable settlements |
| Electric truck fleet | 10 trucks deployed, saving ₹2–2.5 cr/year; total fleet ~50–60 trucks in granite mines |
| Captive solar power | 6 MW tied up, saving ~₹2 cr/year; combined savings with trucks ₹4–5 cr/year |
| Capex plan | ₹300 cr total; Phase 2 quartz ~₹120 cr to be spent over next four quarters |
| Natural stone share of H1 revenue | 19% |
| Fuel cost increase (H1 FY27 vs H1 FY26) | 30%–35%; passed on to customers via pricing, dollar added ~4% extra realization |