Key Takeaways
- Granite delivers, Quartz resets: Domestic granite demand is on a high-growth trajectory while the quartz vertical has resolved plant-streamlining issues and started commercial production, setting up a broader base for FY27.
- New Black Galaxy mine improves unit economics immediately: A 10.9-hectare lease adjacent to the current operation carries a lower government consideration, so margins on that material step up as soon as production begins this quarter.
- Rare earth strategy is scaling on geopolitical pricing power: Buyers pursuing China Plus One are offering 2x the Chinese exchange price, and management is chasing world-class 90%+ oxide yields while acknowledging that even 65-70% is feasible at current premiums.
- Margins held consistent, with a step-change promised later: Nine-month EBITDA margin is ~27%, close to last year's ~28%+; management expects a healthier number once Quartz and HMS contribute a full year.
- What to watch next quarter: Whether the new Black Galaxy mine hits production, the PLI-driven decision on forward integration into permanent magnets, and any concrete update on the KMML EOI or Sierra Leone concessions.
Granite: Volume-Led Growth with a Margin Tailwind
- Domestic demand running hot: The domestic market is on a very high growth trajectory, with demand exceeding expectations, and management expects this to follow through for the next few quarters.
- China import window wide open: Two drivers are converging: distributors have worked down inventory from stalled construction projects, and new projects now need natural stone for handover, while the RMB at an all-time strong 6.9 (vs 6.3-6.4 historically) makes imports more attractive.
- Middle East and Europe steady: The Middle East is growing at a single-digit pace; Europe shows no growth, described as standard requirement.
- New Black Galaxy mine is an immediate margin lever: The 10.9-hectare lease sits right next to the current operational mine, and the consideration paid to the Government of Andhra Pradesh is lower than the current APMDC consideration, so unit economics are more favorable from day one. Production is expected as early as this quarter.
- No order book, by design: The company does not maintain a specific order book for natural stone; distributors with deposits offtake whatever is produced, and the bottleneck has always been increasing production.
Ram Kollareddy: "the consideration which we are paying to the Government of Andhra Pradesh is lower than the current consideration we are paying to APMDC, which means the unit economics work more favorably in for this specific Black Galaxy mine."
Quartz: Plant Reset Complete, Phase 2 Underway
- Integration issues resolved: The solar integration plant and engineered stone operations faced challenges last quarter; small changes to streamline the plant have been made, output has increased, and commercial production has started.
- Phase 2 on an accelerated timeline: Layout is finished, orders will be placed next month, and commissioning is in line for end of Q3 or early Q4 next year. HPQ (high purity quartz) has been pulled forward into Phase 2 on a small scale, rather than waiting for Phase 3.
- Tariff relief as a tailwind: US tariffs do not directly impact Midwest, but some customers sell to the US; tariff relief could provide a good tailwind helping Phase 2 more than Phase 1. The EU tariff also helps because the EU is the largest engineered stone manufacturer after India and Vietnam, and free trade positions India well to supply the EU.
- Demand visibility covers full capacity: There is enough demand for the whole year from both engineered stone plants (seven companies) and solar glass (a single customer offtakes the entire material, with a second player being added in Q1 next year). Orders also exist for tailings from glass manufacturers like AGI.
- New quartzite mine builds a branded B2B2C model: A new lease of a quartzite mine supplements material coming from Brazil. The model is asset-light: Midwest holds the brand and exclusive mining rights, a job-working partner converts into products, and own dealers distribute nationwide. The material is Grey Quartzite, unique in Andhra Pradesh, and the company will be the only one doing it.
Ram Kollareddy: "we are also controlling the end price and we're going asset-light in positioning this product to the Indian market."
Rare Earth & HMS: Geopolitical Pricing Meets a Yield Ambition
- The pricing environment has structurally shifted: In the US and countries pursuing China Plus One, buyers are offering 2x the listed Chinese exchange price, indicating both volume and price upside.
- The yield gap is the central operational challenge: Best-in-class China achieves 95-96% oxide yield; Midwest's lab and pilot work reached 86-87%, the best outside China. At current geopolitical pricing (double or 50% higher), even 65-70% yield is feasible, but management is striving for world-class 90%+ yields and acknowledges this challenge will persist for the next 4-5 years.
- PLI scheme creates a domestic demand pull: For the PLI targeting 6,000 tons of magnets, India needs 2,000-2,500 tons of oxides but currently produces only 500 tons. Even if Midwest produces oxide in Sri Lanka or India, the demand is within India.
- Forward integration decision imminent: The company initially planned to stick to oxides but is now studying whether to forward-integrate into permanent magnets under the PLI scheme. Clarity will come during the next quarter.
- Sri Lanka concessions advancing: A new, more transparent mining policy has received cabinet approval. Midwest expects new concessions and policy resolution this quarter, will explore a larger plant (about 150,000 tons output) over the next two quarters, and plans to start work on a sizing plant in Q3 next year. A delay of a month or two from the original March/April start is expected, but management believes an EPC contractor from China can make up time in execution.
- Sierra Leone as the next frontier: A subsidiary has been set up; the team has done exploration and found a similar setup of a large HMS resource with monazite by-product. The company is looking at concessions in the next few weeks and sees a good possibility of an asset there in the next two years, possibly with a concentrate plant.
- KMML EOI progressing slowly: Discussions are progressing with some delay on KMML's side; clarity is expected in the next few weeks.
Ram Kollareddy: "You never know, you are slightly blindsided on what's happening the other side of the world. So you want to build a state-of-the-art plant. You want to be right at there. You want to have the best efficiencies in the world. They are good for you, but are they there? So, that is a constant thing we keep thinking and trying to chase."
Uma Kollareddy: "When you're looking at China Plus One strategy, people are even in the U.S., they are even giving 2x the pricing than the listed Chinese exchange price, which means there is not just an uptick in the possible volume growth, there is also a massive upside on the price growth eventually."
Margins: Consistent Today, Healthier Tomorrow
- Current margin profile is stable: EBITDA margins have been consistent for the last 3-4 years with an upward trend, except FY23 which had a specific post-COVID port-related logistics issue. Last year (FY25) was ~28%+; nine months this year is ~27%; the last quarter normally has high revenue so the full-year number will be close to last year's.
- No specific margin target given: When asked for a target, management cited past performance and added that once Quartz and HMS have a full year of contribution, margins will be "on the healthier side than these numbers."
- Year-on-year is the right assessment lens: For the next 3-4 years, year-on-year is the fair assessment because new projects carry their own timelines. Once Quartz Phase 2 and HMS Phase 1 mature, half-yearly or quarterly assessment will become appropriate.
Sustainability & Talent: Building the Operating Backbone
- Electric fleet conversion underway: A considerable portion of IPO proceeds has been allocated to convert diesel trucks to electric. Nine are currently in operation; orders are being placed for the rest, with completion expected in the next one or two quarters.
- First electric excavator prototype this quarter: A partner has been found and the first electric excavator will be prototyped in the mine as early as this quarter. If successful, the rollout to convert diesel excavators will follow over the next few quarters.
- Captive solar expanding aggressively: The company will exceed planned capacity given developments; an exact megawatt number will be provided on the next call, with more aggressive deployment next financial year.
- Listing unlocks talent: The team has been strengthened with personnel from Lynas, Iluka, and other quartz companies. Listing has helped attract talent, including Indians in China wanting to return. A new Business Head for Quartz has joined, previously heading Sibelco operations for many years. An ESOP scheme is being devised with a consultant.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| New Black Galaxy mine production | Production numbers from the 10.9-hectare lease | As early as this quarter |
| Electric truck fleet conversion | Complete conversion of diesel trucks to electric | Next one or two quarters |
| First electric excavator prototype | Prototype deployed in the mine | As early as this quarter |
| Quartz Phase 2 commissioning | Plant commissioned | End of Q3 or early Q4 next year |
| HPQ production | Small-scale HPQ production from Phase 2 | Alongside Phase 2 commissioning |
| Sri Lanka HMS plant sizing | Start work on sizing plant (~150,000 tons output) | Q3 next year |
| PLI forward integration decision | Clarity on whether to forward-integrate into permanent magnets | Next quarter |
| KMML EOI update | Clarity on EOI discussions | Next few weeks |
| Sierra Leone concessions | Update if something concrete emerges | Next few weeks |
| Captive solar capacity | Exact megawatt number disclosed | Next call |
| Quartzite B2B2C model assessment | Determine if model is working; go aggressive if yes | Next 9 to 12 months |
| Sierra Leone asset | Good possibility of an asset | Next two years |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Consolidated revenue | ₹128 cr, +10% YoY (₹117 cr in Q3 last year) |
| EBITDA margin | 23.7%, vs 20% in Q3 last year; 27% for 9M FY26 vs 24.53% in 9M last year |
| PBT margin | ~22% |
| PAT margin | ~16.16% |
| 9M FY26 EBITDA margin | 27%, improved from 24.53% in 9M last year |
| Long-term borrowings | ~₹164 cr, reduced by ₹54 cr via IPO proceeds repayment |
| Cost of debt | ~8% |
| IPO proceeds utilization | ~₹54 cr repaid toward loans; ~₹27 cr planned for EV dump trucks; balance for Quartz Phase 2 and other purposes |
| Black Galaxy new mine | 10.9-hectare lease secured, adjacent to current mine; production expected this quarter |
| Quartz commercial production | Started in current quarter; Phase 1 issues resolved |
| Quartz Phase 2 timeline | Commissioning by end of Q3 or early Q4 FY27; HPQ included in Phase 2 scope |
| HMS Sri Lanka status | Cabinet approval for new mining policy received; 1–2 month delay to ground activity |
| HMS Phase 1 planned capacity | 150,000 tons output |
| HMS Sri Lanka Phase 1 revenue potential | ~₹350 cr to ₹400 cr top line at current prices |
| Monazite oxide revenue potential | ~₹150 cr to ₹180 cr additional once oxide production starts |
| Quartz Phase 1 revenue potential | ~₹200 cr to ₹210 cr |
| Total Quartz (Phase 1 + 2 + HPQ) revenue potential | ~₹500 cr to ₹550 cr |
| Oxide-to-magnet plant capex (1,200 tpa) | ~₹1,000 cr to ₹1,100 cr (plant & machinery, excluding land); PLI subsidy ~₹150 cr |
| India current oxide production (IREL) | ~500 tons; PLI scheme for 6,000 tons of magnets will need 2,000–2,500 tons of oxides |
| Monazite oxide yield (company lab/pilot) | 86%–87%; best-in-class China yield 95%–96% |
| RMB exchange rate | 6.9, vs 6.3–6.4 historically, making imports more attractive for China |