Key Takeaways
- Volume engine firing, price a drag: H1 production surged 45% YoY to a record 8.15 lakh tons, but a 20%+ decline in manganese ore prices over 18 months compressed EBITDA margins to ~34% from a peak of 45%.
- Cost discipline is the margin bridge: A 45% production jump required only a 5% cost increase, driven by manpower rationalization and operating leverage, partially insulating EBITDA from the price fall.
- Growth is organic and near-term: Management is confident of hitting ~0.17-0.18 crore tons this year (28-30% growth) and "20 plus" percent growth next year, all from existing assets before new JVs kick in.
- A pipeline of JVs, but no near-term volume: MOUs signed with GMDC, CMDC and MPSMC, plus exploration in MP and Chhattisgarh, but these will only add material tons from FY25-26 onward.
- What to watch next quarter: Whether the promised Q3 production beat materializes, any inflection in manganese ore prices from what management calls "rock bottom," and concrete progress on the GMDC JV.
Volume & Production Ramp-Up
- H1 FY24 was a step-change: April-September 2023 production of 8.15 lakh tons was the best-ever six-month period, growing 45% over CPLY. Q1 alone was the best quarter since inception.
- Calendar year trajectory: In the first 10 months of the calendar year, MOIL produced 13.28 lakh tons, already the highest ever for any calendar year with two months still left.
- Full-year confidence: Management expects Q3 to exceed the record Q1 and is confident of touching more than 0.17 crore tons for FY24, representing 28-30% growth over the prior year, barring something beyond its control.
- FY25 growth already telegraphed: "Definitely 20 plus" percent growth next year, driven entirely by existing assets, with no contribution yet from new JVs.
- 2030 ambition: The company is planning to scale production to more than 0.3 crore tons by 2030.
Saxena: "We are confident that unless something — I mean, something that big happens, which is beyond our control, we are confident we'll be touching more than 0.17 crore ton this year."
Pricing & Margin Dynamics
- The price cycle has been brutal: Manganese ore prices have declined more than 20-22% over the last 18 months, driven by international prices, ferroalloy production and exports, global steel dynamics, and port stocks. Management believes prices have "touched rock bottom."
- Cost control saved the P&L: When production grew 45%, costs increased only 5%, keeping EBITDA "more or less maintained." The EBITDA margin currently sits around 34%, down from a best of 45% a few years ago, with the entire compression attributable to price.
- Manpower cost is structurally declining: Employee cost as a percentage of revenue has fallen from a historical 54% and continues to trend down. The company is recruiting only statutory manpower and redeploying existing staff to more productive areas.
- The bull case on price: Management points to certain alloys now trading at INR60,000-62,000 per ton, down from INR1,20,000 just three years ago, and argues prices "have to go up," though the timing is uncertain.
- Cost transparency is limited: When an analyst derived a per-ton cost figure of INR6,400-6,500, management disputed the math and declined to provide a specific cost breakdown, stating only that MOIL's cost "competes with the best cost of production across the globe."
Tumane: "When we achieved 45% of growth in production, our cost has increased only by 5%. So our EBITDA is more or less maintained there."
Joint Ventures & Exploration Pipeline
- The strategy is to diversify beyond aging underground mines: MOIL's 10 existing mines are 100-120 years old and going deeper. New mines in Gujarat, Madhya Pradesh and Chhattisgarh are intended to create a mix of open-cast and underground operations.
- GMDC (Gujarat) is the most advanced JV: An MOU is signed, 0.95 crore tons of resources are established, and the company is in the process of signing the JV. Certain stages are complete, with Board clearance and an EC application still pending. First-year production is expected at 0.02 crore tons, and the mine may be open-cast for the initial 2-3 years.
- Chhattisgarh exploration approved: MOIL has been given the go-ahead to explore a 218 sq km area and signed an MOU with CMDC. If viable, a JV will follow.
- Madhya Pradesh exploration underway: 17 blocks across Jhabua, Balaghat and Chhindwara are under exploration. If resources are established, MOIL will enter a JV with the Madhya Pradesh State Mining Corporation.
- Other states in the pipeline: MOIL is positive on signing similar MOUs with Jharkhand, Andhra Pradesh and Karnataka, with discussions in progress.
- Exploration spend is ramping hard: The company carried out 41,000 meters of exploratory core drilling in the first seven months of FY23 (2.7x CPLY) and has set an ambitious target of 70,000 meters for the full financial year.
- Lithium is on the radar: Management confirmed it is open to exploration, mining or forward integration in lithium and will participate when auctions open.
Mine Expansion & Infrastructure
- Chikla mine capacity doubled: Consent to operate was received on 25-26 October, taking capacity from 1.8 lakh tons to 4 lakh tons.
- Ukwa hoisting capacity increased: Expansion is complete at this underground mine.
- Balaghat and Gumgaon in progress: Both underground mines are in the process of increasing hoisting capacity.
- Lease security is a foundational strength: Leases have been extended up to 2032 and 2042, which management calls "the biggest strength for any mining company."
- Mine life is inherently unpredictable: Management declined to estimate remaining mine life, noting that the Balaghat mine was once expected to close in five years but is still operating, with the ore body now proved from 300m depth to over 1,000m.
Saxena: "You'd appreciate that this is the biggest strength for any mining company."
Capital Allocation & Shareholder Returns
- Capex is accelerating: The company is targeting 20% more capex this year compared to last year's INR245 crores, focused on capacity expansion to substitute imports as India's 7-million-ton requirement converts to 1.1 crore tons.
- Dividend signal is positive but unspecific: When asked about increasing the dividend payout, management responded, "We'll be coming back to you. And it will be something — it must be something good because the figures are showing good," but gave no commitment on timing or amount, citing guideline constraints.
- Buyback question deflected: Asked whether expansion capex would crowd out buybacks, management spoke about guidelines and capacity expansion focus without directly addressing whether buybacks would continue.
- Exploration is self-funded: MOIL does not use the NMET fund route for exploration cost reimbursement; it explores with its own resources on areas allotted to it.
Saxena: "We'll be coming back to you. And it will be something — it must be something good because the figures are showing good."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY24 production | More than 0.17 crore tons (~28-30% growth) | FY24 (barring events beyond control) |
| FY25 production growth | "Definitely 20 plus" percent growth | FY25 |
| Q3 FY24 production | Exceed best-ever Q1 (4.36 lakh tons) | Q3 FY24 |
| Exploration drilling | 70,000 meters core drilling | FY24 |
| Capex growth | 20% more than last year's INR245 crores | FY24 |
| Environment clearance | 66% more EC than last year's 0.2 crore tons | FY24 |
| 2030 production target | More than 0.3 crore tons | By 2030 |
| GMDC JV first production | 0.02 crore tons in first year | FY25-26 (subject to Board clearance, EC) |
| New mine contribution | GMDC and other JVs begin adding tons | From FY25-26 onward |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Revenue from operations (H1 FY24) | ₹727 cr, +19% YoY |
| EBITDA margin | ~34%, vs best of ~45% a few years back; cost +5% on 45% production growth |
| Production (H1 FY24) | 8.15 lakh MT, +45% YoY; best-ever 6-monthly production |
| Sales volume (H1 FY24) | 7.57 lakh MT, +54% YoY; best-ever 6-monthly sales |
| FY24 production growth target | 28–30% (to ~0.17–0.18 cr MT), from 13.02 lakh MT in FY23 |
| FY24 capex target | ₹295 cr, +20% YoY; ₹142 cr spent in H1 |
| Exploration drilling target (FY24) | 70,000 meters; 41,837 meters completed in first 7 months |
| EMD production growth (H1 FY24) | +26% YoY, best-ever six-monthly performance |
| Average manganese ore grade | 30–33% Mn, slightly better than national average |
| Share price increase (Apr–Nov 2023) | +86%, from ₹143 to ₹265; Sensex +11% |
| Domestic production share | >45% of India's manganese ore |
| Underground mining share of production | >70% |
| Renewable energy share of consumption | 62% |
| GMDC JV resource estimate | 0.95 cr MT established; JV proposed at 51:49 (MOIL:GMDC) |
| Chhattisgarh exploration area awarded | 218 sq km, via MOU with CMDC |