Key Takeaways
- Profitability reset, not just a recovery: Operating profit grew 14–15% QoQ excluding a ₹2.2 crore forex swing, driven by a deliberate downsizing of the loss-making BIW segment and a mix shift toward higher-value engineering services.
- Beryl is still a cost, but the design pivot is underway: The subsidiary narrowed its quarterly loss to ~$25,000 and won a ~$1,000,000 design order from Hillsborough County, with management expecting a breakeven in Q3 and a meaningful contribution from FY28.
- Poles and towers is the new growth engine, constrained only by talent: The team has doubled to 70–80 people on surging data center demand, but the order book requires 120+; the company is training engineers internally and expects a ramp from December.
- A new civil and land development domain opens: An MOU with a US client leverages Beryl’s background to enter a market management says is 40–50x larger than structural steel detailing, with work starting from November end.
- What to watch next quarter: Whether Beryl actually crosses breakeven, the pace of hiring for the poles and towers MSA, and any concrete progress on the structural engineering acquisition that management says is still “liquid.”
The BIW Reset: Removing the Drag
- Segment downsized to stop the bleed: The BIW team was cut from 150–160 resources to ~50, with a further 5–10 reduction planned, because it was the only line in 25 years with extreme workload swings from $0.5M to $100K per quarter.
- Consistency now visible: Management says the erratic quarterly performance that BIW caused is “completely eliminated,” and the QoQ improvement in profitability is now structural rather than cyclical.
- No recovery expected: The outlook for BIW is bleak; senior people will handle any future work and outsource the rest to small players, with the segment reduced to a nominal size.
Lakshmana Rao: “And going forward also, we don't see much light at the end of the tunnel for BIW, so that will be slowly reduced to a nominal size, just to keep in case it takes off, the senior people can handle some work and outsourcing the rest of the work to some of the small players is the action plan.”
Poles & Towers: The Data Center Tailwind
- Demand surge from US data centers: The emergence of data centers across the USA has increased power distribution demand several-fold, and management confirmed the trend with contractors and utility managers during a recent US trip.
- Team doubled, still short: The poles and towers team grew from 30–40 to 70–80 people, but demand is for 120+; engineers are not readily available and must be developed through training, with a ramp expected from December.
- Three-year MSA with a plant engineering company: Only 10–15 of the required 25 people are currently staffed due to a dearth of talent in poles and towers detailing; additions are expected from end of November or December.
- Growth visibility for 5–10 years: Management cites substations and power lines to be created alongside data centers, and says numbers will start adding from December with things “much better” from January.
- Downside scenario is contained: If AI and data center demand suddenly drops, utilities growth might taper from the anticipated trajectory, but management sees no impact at the current level of ~70 engineers.
Beryl: The Long Bet on Design and New Customers
- Strategic purpose, not immediate profit: The acquisition was made to access residents, counties, and municipalities in the USA, not for near-term earnings; management says the addressable market is 40–50x larger than structural steel detailing.
- Loss narrowed, breakeven in sight: Beryl’s quarterly loss reduced from $70,000–$75,000 to ~$25,000; management expects a Q3 breakeven and says Beryl alone will run into black “at least from next financial year, for sure.”
- Design integration begins: A US-qualified professional engineer is now positioned in Tampa as design head, supported by a five-person team in Hyderabad; the ~$1,000,000 Hillsborough County order is predominantly design work, validating the outsourcing model.
- Marketing push launched: A marketing initiative from India aims to improve Beryl’s online visibility and search presence to drive more residents to its services.
- Full benefits in FY28: Q4 will be impacted by US holidays, but from Q1 of Beryl’s year (Mold-Tek’s Q4), the subsidiary should be “contributing handsomely.”
Lakshmana Rao: “Acquiring Beryl is not for immediate profitability, but to create a new set of customers, that is residents, counties and municipalities of USA, rather than working only for the high-rise buildings.”
Civil & Land Development: The Next Platform
- New domain, new MOU: A US-based client opportunity in civil and land development has been secured, supported by Beryl’s background; work takes off from November end and can become sizable from January–February.
- Beryl’s niche knowledge leveraged: Even though only a couple of people at Beryl have civil and land development knowledge, that is enough to showcase team leaders who can train the Indian team.
- One-stop aspiration: If the company acquires a structural engineering firm that fits with civil and land development, it can become a one-stop solution provider for the entire gamut of civil projects, commanding better respect and pricing from general contractors.
- Residential entry as a hedge: Even if the high-rise building domain weakens, entry into the residential line, which is 10–20x bigger, can provide good support and growth.
Lakshmana Rao: “High rise buildings constitute hardly 2% of the overall construction in USA... residential and land and the structure... civil, structural, architectural, all these services and design, they contribute 40 to 50 times more than structural steel detailing.”
Efficiency & Productivity: Doing More With the Same
- Per-person revenue up 15–16% YoY: Revenue per person rose from ₹4,500 to ₹5,220, driven by an incentive system, training, and early automation efforts.
- No large-scale recruitment needed: Management says revenues can shoot up another 15% from current levels without much headcount increase, with corresponding bottom-line improvement.
- Path to $35,000–$37,000 per person per month: Continued efficiency drives and automation are expected to push per-person revenue from current levels toward this target, with management stating it is "quite possible."
- Automation initiatives started: Steps have been initiated to benefit from AI or automation “in a very small way,” with a focus on improving output and quality without sacrificing quality.
- Ground rules changed after BIW: Future recruitment will be client-driven or project-driven; management does not want to repeat the BIW experience of building a large team without sufficient work.
Lakshmana Rao: “We don't want to now create a situation like in BIW where we entered three years ago, built up a huge team and could not find the proper work for them for the last two years, which has impacted our performance. So, now the ground rules have changed to efficiency drive, training in-house, and looking at solid segments of growth.”
Acquisition & Capital Allocation
- Search ongoing, no decision made: Conversations with a prospective seller are ongoing; concerns have been expressed and the company is awaiting a reply; the situation is “still liquid” and other options are being evaluated.
- Criteria narrowed: Only structural designing companies with the ability to expand and ramp up with the addition of an Indian team; their numbers will be much better than Mold-Tek or Beryl because of the high fees they command.
- Seller’s scalability is the sticking point: Management is “still not satisfied” with the prospective seller’s ability to ramp up and scale, which is why no timeline or commitment to close has been given.
- Strategic fit with civil and land development: An acquisition in structural engineering would make Mold-Tek a one-stop solution provider for the entire gamut of civil projects.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Consolidated top-line growth | At least 18–20% growth | Next 12 months |
| Standalone top-line growth | Around 20–25%, subject to dollar fluctuations | Next 12 months |
| Beryl breakeven | Cross breakeven after a ~$25,000 loss in Q2 | Q3 FY27 |
| Beryl standalone profitability | Run into black | From next financial year (FY28) |
| Poles and towers team ramp | Reach 120 people from 70–75 currently | By March next year |
| Civil and land development revenue | Sizable numbers | From January–February onwards |
| Revenue growth without headcount increase | Another 15% from current levels | No specific date; efficiency drives underway |
| Per-person revenue trajectory | Reach $35,000–$37,000 per person per month | No specific date; through continued efficiency and automation |
| Forex gain in Q3 | Some forex gain expected if dollar remains around ₹95 levels | Q3 FY27 |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Standalone revenue | ₹46.64 cr, up 25% YoY |
| Standalone PAT | ₹10.16 cr, up from ₹3.15 cr YoY (more than tripled) |
| Standalone H1 PAT | ₹20.19 cr, 4.4x growth; double the last full year PAT of ₹10 cr |
| Standalone H1 revenue | ₹92 cr, up 39% YoY (standalone turnover for the quarter) |
| Consolidated H1 PAT | ₹18.62 cr, up almost 375% (4.7x) YoY vs last year H1 |
| EBITDA growth | 32.5% YoY, one of the best quarters in company history |
| Forex impact | Loss of ~₹70 lakhs in Q2, vs gain of ₹1.5 cr in Q1 |
| Operating profit growth ex-forex | More than 14-15% QoQ at operating level, vs reported 6% |
| Work on hand | ~$4.2 million, dipped from ~$4.5 million last quarter; record bookings in October took it above end-of-June levels |
| Revenue from civil structural work | ~$4.4M out of $5.3M–$5.4M total, roughly 80-82% of revenue |
| MES (automobile services) revenue | Hardly $100,000 in the quarter, down significantly |
| Beryl Q2 loss | ~$25,000, down from $70,000–$75,000 loss in Q1 |
| Per-person revenue | ₹5,220, up from ₹4,500 in Q2 last year, a 15-16% improvement |
| BIW team size | Reduced to ~50 people from 155-160 earlier |
| Poles and towers team size | 70-75 people, up from 30-40 last year; demand for 120+ on fixed committed basis |
| Top-line growth outlook | At least 18-20% consolidated, 20-25% standalone, for next 12 months |