Key Takeaways
- Record H1, H2 promised stronger: Revenue and PAT hit all-time highs for a half year, and management expects the second half to be "much stronger," with clean energy volumes accelerating.
- Clean energy is galloping: The segment generated ~₹99 Crores in H1, delivered over 1,000 fuel cell hot boxes in Q2, and is on track for ~4,000 units this year, driven by new product qualifications that are expanding wallet share.
- Working capital is the price of growth: Net working capital days stand at 263, inflated by long-lead-time inventory, conservative revenue recognition on delivery, and export transit delays; management targets 200 days by year-end.
- Margins dipped on mix, recovery expected: Gross margin fell 600 bps QoQ on project mix and higher material costs, but management expects to maintain 50–52% gross margin and ~30% EBITDA by year-end as operating leverage kicks in.
- What to watch next quarter: Whether nuclear and domestic execution catches up in H2 as promised, the pace of working capital reduction toward the 200-day target, and the volume ramp on newly qualified clean energy products.
Clean Energy: The Growth Engine
- Record volumes and new products: The company delivered more than 1,000 Yuma hot boxes in Q2 and is on track for ~4,000 this year and ~7,000 next year; Q3 numbers are "much higher." New products recently qualified are enabling growth at "much higher levels."
- Wallet share expansion: Growth is being driven by qualifying for products that Bloom Energy previously imported from Japan or the US, increasing MTAR's share of customer spend through R&D and innovation.
- New customer pipeline: Received initial orders from GE Renewable (~₹5 Crores) and is in advanced discussions with Fluence Energy (US) for power storage systems, a project described as "very innovative" with volumes of ₹300–₹500 Crores expected in one to one-and-a-half years.
- Electrolyzer ramp: Management expects a "very big ramp-up" by end of FY2024, potentially becoming even bigger than the Yuma and Keeylocko verticals in unit terms; initial orders of at least ~200 units next year.
- One new product launching in Q4 is expected to contribute ₹100–₹110 Crores in the next calendar year.
- Capacity planning: FY2024 capacity is 9,000 units; a decision on expanding beyond that for FY2025, considering the electrolyzer ramp and new products, will be taken by end of this calendar year.
Srinivas Reddy: "Probably by end of FY2024 we will see a very good ramp up happening in those where it will be even bigger than the Yuma and Keeylocko verticals as well as units."
Working Capital: Inherent but Targeted
- 263 days, driven by WIP: 93 of the 263 net working capital days are due to work in progress, because long-lead-time domestic projects spanning 12 months to two years require inventory to be carried until delivery.
- Conservative revenue recognition: The company books revenue only upon delivery of goods, not on percentage of completion, a deliberate choice to avoid taking benefit early; this keeps work-in-progress high. For future orders with an overtime concept, the method may be reconsidered.
- Export transit delays: Transit times to the US have increased from 25–30 days to almost 60 days due to supply chain disruption, adding ~35 days to working capital days.
- Receivables are largely current: 91% of receivables are due but not overdue, only 9% are overdue; ₹20 Crores were collected in October.
- Inventory is deliberate: Higher inventory levels are being maintained to cover against raw material procurement delays from Europe; management states they are "totally covered" and do not foresee production stoppages. Clean energy inventory is maintained at 3–4 months due to long lead times and supply chain disruptions.
- Cost of funding is priced in: The cost of borrowing is ~5.2–5.4% p.a. via the interest equalization scheme, and this cost is factored into product pricing, allowing the company to still achieve ~30% EBITDA and ~19% PAT.
- Targets: Internal target of 200 days by end of FY23, with more aggressive targets planned for next year; a long-run aspirational figure of 150 days was mentioned tentatively.
Gunneswara Rao: "We have some long lead time projects are there, which require to maintain inventory, so the work in progress is inherent in nature in our business, so we need to have this working capital, this is meant for future sales."
Margins: Mix-Driven Dip, Recovery Expected
- Gross margin fell 600 bps QoQ: The decline reflects varying raw-material-to-value-addition ratios across projects (some 50%, some 40%, some 50–55%), not purely the higher export share; average gross margin is expected to be 50–52% by year-end.
- Operating expenditure rose because the company is augmenting manpower for future growth; higher revenue in H2 is expected to reduce fixed cost as a percentage of revenue and thereby improve margins.
- Segment margin differentials are minimal: Fuel cells carry ~2% lower margin, space carries ~2% higher margin; all other segments have roughly equal margins on average.
- Raw material pass-through: Current contracts have raw material pass-through clauses, so commodity price changes do not affect the company.
- FY24 margin ceiling: Management does not expect to go beyond 30% EBITDA margins in FY2024; the constant endeavor is to reduce costs and improve margins, but "let us see how it goes."
- Other income boost: Higher other income (₹5.5 Crores in Q2) was mainly driven by forex gains of ₹4.4 Crores due to a higher dollar rate and high receivables.
Srinivas Reddy: "Once the operating leverage is very good in the case of clean energy it makes sense that is our endeavor from our side to try to improve margins as much as possible wherever to reduce cost that is the constant endeavor to the company and obviously things would improve moving forward but let us see how it goes."
Domestic & Non-Clean Verticals: H2 Catch-Up Expected
- Nuclear execution was muted in H1: Revenue was only ₹8.5 Crores because projects like fueling machines and coolant channels have long cycle times and require departmental clearances; execution is expected to catch up in H2. A nuclear order of ~₹62 Crores was booked in Q2.
- Domestic revenue phasing: Domestic revenues (nuclear, space, chemical) were muted in Q2 because they involve long-cycle products whose execution is weighted toward the second half; management stated the domestic business should be viewed on an annual, not quarterly, basis.
- Revenue stuck in inventory: Revenue not yet booked and stuck in inventory is primarily in the nuclear business, and also for some advanced-stage space projects like the semi-cryo engine.
- Space division milestones: Design work on the SSLV project has started, with an MOU expected to be signed in November; the semi-cryo engine with ISRO is targeted for launch by end of Q4. The SSLV is a three-year design and development program expected to take MTAR to a "completely different level."
- Defence segment: Absolute numbers are expected to improve year-on-year; the company is working on a number of R&D projects for DRDO, including roller screws (first articles submitted, under clearance) and electromechanical actuators.
- Offset obligations from customers like Elbit and Rafael will continue over the next four to five years; for new projects, the concept is shifting to Make in India with joint ventures.
Srinivas Reddy: "But offset is technically out of the window more now right now because all about Make in India. So the government is pushing for all these companies to actually manufacture in India under joint venture so that is the future in what we are looking at."
System-Level Integration & New Capabilities
- Moving toward fully integrated supply: The company is transitioning from component supply to system-level integration over the next one to two years, adding wallet share within existing and new customers.
- Electronics division: Stage one of electronics (cable harnesses) is being implemented, with full stability targeted over the next one to one-and-a-half years in three stages; qualification is being pursued with Bloom Energy and for aerospace and defence projects.
- Sheet metal: Shipments of ~₹11.7–12 Crores achieved; an order for 2,450 enclosure sets for the next calendar year has been received based on qualification and quality performance.
- ASP fueling systems: Qualification achieved; revenues of close to ₹100 Crores plus expected in the next calendar year.
- Roller screws: First articles submitted to DRDO, under clearance; potential import ban on current imports from Rollivs, Sweden, with market capture expected over the next two years.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | 55–60% growth in revenues; management expects to exceed this but officially sticks to the original guidance | FY23 |
| EBITDA margin | ~30% plus or minus 100 bps | FY23 |
| Gross margin | Maintain 50–52% on an average basis | By FY23 year-end |
| Net working capital days | Reduce to 200 days | By FY23 year-end |
| Fuel cell hot box volumes | ~4,000 units | FY23 |
| Fuel cell hot box volumes | ~7,000 units | FY24 |
| Electrolyzer initial orders | At least ~200 units | FY24 |
| Clean energy capacity | 9,000 units | FY24 |
| Semi-cryo engine launch | Target launch with ISRO | By end of Q4 FY23 |
| SSLV program | Design and development (three-year program, may extend ~6 months) | Starting November FY23 |
| Electronics division stability | Full stability in three stages | Over next 1–1.5 years |
| Fluence Energy volumes | ₹300–₹500 Crores | 1–1.5 years from now |
| New clean energy product contribution | ₹100–₹110 Crores | Next calendar year (CY2024) |
| ASP fueling systems revenue | Close to ₹100 Crores plus | Next calendar year (CY2024) |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue from operations | ₹126 Cr, +38% YoY |
| EBITDA | ₹34.9 Cr, +19% YoY |
| EBITDA margin | ~27.7% (₹34.9 Cr on ₹126 Cr, per analyst's math); annual guidance maintained at 30% plus, minus 100 bps |
| Profit before tax | ₹33 Cr, +22% YoY |
| Profit after tax | ₹24.7 Cr, +30% YoY |
| Diluted EPS | 8.03, vs 6.2 in Q2 FY22 |
| Order inflow | ₹643.5 Cr, including nuclear, space, clean energy |
| Closing order book | ₹1,288 Cr as of 30 Sep 2022 |
| Clean energy segment revenue (H1 FY23) | ~₹99 Cr, includes fuel cells, hydel and other related sales |
| Yuma hot boxes delivered | ~1,034 units in Q2; Q3 target ~1,600+ units |
| Electrolyzer units delivered | ~40 units in Q2 |
| Net working capital days | 263 days as of 30 Sep 2022, including 93 days from WIP; target 200 days by FY23 end |
| Other income | ₹5.5 Cr, including forex gain of ₹4.4 Cr |
| Nuclear segment revenue (H1 FY23) | ₹8.5 Cr |
| Sheet metal shipments (H1 FY23) | ~₹11.7–12 Cr |