Key Takeaways
- Cement volumes up 16% QoQ, but pricing and fuel costs squeeze margins: Healthy housing and infrastructure demand drove a strong volume quarter, yet subdued cement prices and a 22% YoY rise in kiln fuel cost compressed overall EBITDA margins to 14%.
- A ₹595 crore renewable energy bet dominates the capital allocation story: The board approved the balance 80 MW of a 130 MW hybrid solar-wind project, with debt sanctioned and commissioning targeted for end-February. Management expects ₹70 crores in annual power cost savings once operational.
- Bison Panel division resets with a 17-20% price cut to fight duplicates and drive volume: An advertising campaign and sharp price reduction aim to improve affordability and market penetration, with margins expected to recover on higher volumes from a current 60% utilization rate.
- Promoter stake intact despite one promoter's distress sale: A real estate loss forced one promoter to sell shares, but other promoters bought a similar quantity, leaving the overall promoter holding unchanged at 42%.
- What to watch next quarter: Whether the renewable project stays on track for its February 28 commissioning deadline, the pace of Bison Panel volume recovery after the price cut, and any progress on the preliminary Orissa cement plant exploration.
Renewable Energy Project: The Core Capital Allocation Decision
- Project scope and cost: Phase 2 and 3 of the 130 MW hybrid solar-wind project at Tuticorin, Tamil Nadu, covering the balance 80 MW, were approved at an estimated cost of ₹595 crores. Required debt financing has been sanctioned by ICICI Bank and HDFC Bank.
- Cost escalation from domestic content rules: The total project cost rose by ₹68 crores versus the initial April estimate of ₹917 crores because a government stipulation now requires the use of some domestic solar panels instead of entirely non-DCR panels.
- Post-debt economics: After a 3-year moratorium and 9-year repayment period, the project becomes completely debt-free, and all generation converts to direct savings for the company. Management agreed with an analyst's framing that net power cost could trend toward ~₹10 crores per year after accounting for captive savings and open market sales.
- Annual savings quantified: Once operational, the hybrid project is expected to deliver ₹70 crores in annual power cost savings.
- Execution model avoids EPC guarantees: The company will not award an EPC contract; it will source panels and materials directly and engage local contractors, using its own in-house team with long experience in power and wind. This means no EPC contractor guarantees for cost overruns or generation exist.
- ISTS connectivity enables pan-India use: The project is an ISTS project with connectivity from the central transmission utility via a power grid substation near Tuticorin, allowing the power to be used anywhere in India.
- Commissioning timeline: The entire project (Phase 1 and Phase 2 together) will be commissioned by February 28, because the power grid will only be ready by then, forcing a single-phase approach rather than installments. A transmission line contract for about 7 km has been given and substation work has started.
- Battery storage under discussion: The company is discussing battery energy storage with technical experts; if adopted, the wind component may reduce somewhat, but the overall project cost will remain the same. With battery storage, solar power could be stored and used at night for continuous-process cement plants, potentially consuming all generated power captively.
- No PPA signed yet for market sales: 40% of the power is intended for sale in the market, but no power purchase agreement has been signed; management described an "understanding with CTEOL."
- Return on equity: Management stated the project's ROE is around 10%.
- Strategic rationale as existential: Management framed captive power as a competitive necessity, stating that in the long run, those without their own captive power cannot remain in the cement business.
K. Ravi: "In the long run, see, definitely those who do not have their own captive power, definitely they cannot remain in cement business. That is the background."
Cement Division: Volume Strength, Margin Pressure
- Volume and revenue growth: Cement sales volumes grew 16% QoQ, with revenue up 12% QoQ and 11% YoY, primarily driven by higher sales volumes. Demand was healthy, supported by the housing sector and infrastructure developmental activities despite Q2 being the typical off-season monsoon period.
- Pricing and cost squeeze: Cement prices remained subdued while rising coal and fuel costs exerted pressure on margins. Kiln fuel cost rose 22% YoY to ~₹144/ton in Q2 because of increasing fuel prices.
- Fuel mix shift and flexibility: The company shifted to using almost 100% Indian coal from a previous mix that included pet coke. Management emphasized that the infrastructure allows overnight switching between pet coke and coal in any percentage, removing price sensitivity constraints.
- H1 cement EBITDA and H2 outlook: H1 cement EBITDA was ~₹475/ton.
- Capacity utilization and pricing power: Cement capacity utilization was at 75%+ in H1, attributed to Nagarjuna Cement's premium brand image in Andhra Pradesh and Telangana, allowing it to sell at a ₹5-10/bag premium over competitors and maintain higher utilization than many peers.
- Industry consolidation tailwind: Smaller cement plants (less than 0.1 crore ton) in the southern market have perished or stopped operations, shifting additional volume to existing plants like NCL.
- Vizag grinding unit: Operating at 77% capacity utilization, manufacturing OPC, PPC, slag cement (branded Steelcrete) and GGBS. Slag is sourced from NMDC by rail, and the product has been launched in the Orissa market over the last year with reasonably good volumes.
K. Ravi: "Nagarjuna Cement is considered a premium brand in these markets, particularly Andhra Pradesh and Telangana. And see, we sell at a premium price. ... we sell about Rs 5 to Rs 10 higher than most of our competitors' price in the market."
Bison Panel Division: Price Reset to Regain Ground
- Price reduction to combat duplicates and drive penetration: Selling prices were reduced by approximately 17% to 20% to improve affordability and enhance market penetration. An advertising campaign was launched across social media and television to address duplicate products being sold under the Bison Panel name.
- Current utilization and margin: Bison Panel utilization is close to 60%, with margins at 14%. Management stated capacity is not a constraint and utilization can go to 100% if orders are received.
- Margin recovery expected on volumes: Margins are likely to improve in coming periods because of higher sales volumes, with management confident that the price reduction and advertising initiatives will strengthen brand presence and support higher sales volumes.
K. Ravi: "Not a problem. See, once we get the orders, so we'll see, we can go to 75-100% also."
Other Businesses and Corporate Developments
- RMC volumes decline: H1 volumes declined 18% YoY, primarily attributable to challenging market conditions, constraints in manpower availability, and intense competition from the unorganized sector.
- Energy division recovery: Q1 had zero power generation from both hydropower plants due to unavailability of water; Q2 generated 0.92 crore units with water availability.
- Vishwambhara Cements acquisition: The company acquired Vishwambhara Cements Limited, which holds a limestone mining lease spread across 322 acres, strengthening raw material security and backward integration.
- Orissa cement plant exploration: The company is exploring an opportunity to set up a cement plant in Orissa and is approaching the government for relevant applications and approvals. The proposal is at a preliminary stage, and any further decisions are subject to applicable approvals and further evaluation. Management noted that not many integrated cement plants exist in Orissa, providing an added advantage once the facility is set up.
- Coats division asset sale: The division was closed in the last financial year; assets held for sale are now being advertised and inquiries are being received. Management expects to realize more or less the amount shown on the balance sheet, though no specific figure was provided.
- Promoter shareholding stability: One promoter (P.N. Raju) sold shares after losses in a real estate venture in Tamravati, Andhra Pradesh, due to a government change. Other promoters purchased a similar quantity, keeping the overall promoter stake intact at 42%.
Balance Sheet and Capital Allocation
- Post-project leverage: Post-implementation of the 130 MW renewable project, the debt-to-equity ratio is expected to increase from 0.26 to approximately 0.9.
- CRISIL rating: The company holds a CRISIL A stable rating.
- Buyback pushback: An analyst asked why not do a share buyback instead of investing in low-ROE projects like the hybrid renewable project, citing that the stock price is where it was in 2015, net worth is ₹974 crore, and market cap is ₹760 crore. Management did not address the buyback suggestion directly, instead reiterating the rationale for the power project.
- Investment timing mismatch: An analyst questioned why the entire upfront investment is needed now instead of incrementally, given that setting up a cement plant takes ~5 years. Management explained the power grid's 130 MW allocation cannot be done in phases and must be taken in full, but did not directly address the timing mismatch with cement capacity expansion.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Hybrid renewable project commissioning | Entire 130 MW project (Phase 1 and 2) commissioned | By February 28 |
| Annual power cost savings | ₹70 crores per year once hybrid project is operational | Post-commissioning |
| Net power cost trajectory | Trending toward ~₹10 crores per year after captive savings and market sales, per an analyst's math | Post-commissioning |
| Cement EBITDA improvement | H2 FY27 EBITDA/ton to improve by ₹50-60 over H1's ~₹475/ton | H2 FY27 |
| Full-year cement EBITDA cap | Full-year FY27 cement EBITDA not to exceed ₹550/ton | FY27 |
| Bison Panel utilization | Can go to 75-100% if orders are received | Undated, order-dependent |
| Bison Panel margin recovery | Margins likely to improve on higher sales volumes | Coming periods |
| Post-project debt-to-equity | Increase from 0.26 to ~0.9 | Post-implementation of 130 MW project |
| Coats division asset realizable value | Expected to realize more or less the balance sheet amount | Undated, sale process underway |
| Orissa cement plant | Exploring opportunity; approaching government for approvals; preliminary stage | Subject to approvals and evaluation |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹386 cr, +12% YoY and +12% QoQ |
| EBITDA | ₹37 cr, -26% YoY and -6% QoQ |
| EBITDA margin | 9.64%, -502 bps YoY and -189 bps QoQ |
| Profit after tax | ₹20 cr, +1% YoY and +15% QoQ |
| PAT margin | 5.18%, -60 bps YoY and +12 bps QoQ |
| H1 revenue from operations | ₹730 cr, +7% YoY |
| H1 EBITDA | ₹77 cr, -25% YoY |
| H1 EBITDA margin | 10.53%, -453 bps YoY |
| H1 PAT | ₹37 cr, -7.2% YoY |
| H1 PAT margin | 5.11%, -80 bps YoY |
| Cement sales volume growth | 16% QoQ |
| Cement revenue growth | 12% QoQ and 11% YoY |
| Cement capacity utilization | 79% in Q2, 74% in H1 |
| Cement EBITDA per tonne | ₹480 in Q2, ₹475 in H1 |
| Cement division absolute EBITDA | ₹38 cr in Q2, ₹74 cr in H1 |
| RMC sales volume growth | 9% QoQ; H1 volumes declined 18% |
| RMC division EBITDA | ₹1 cr in Q2, ₹1.47 cr in H1 |
| Bison Panel volume growth | 6% QoQ and 6% in H1 |
| Bison Panel selling price reduction | ~17% to 20% |
| Bison Panel EBITDA margin | 14% in Q2 and H1 |
| Bison Panel absolute EBITDA | ₹5 cr in Q2, ~₹10 cr in H1 |
| Energy division power generation | 0.92 cr units in Q2 (0.18 cr captive, rest sold to grid); zero in Q1 |
| Energy division EBITDA | ₹0.63 cr in H1 |
| Net worth | ₹969 cr as of 30th September 2006 |
| Debt-to-equity ratio | 0.26 currently, expected to rise to ~0.9 post renewable project |
| Renewable project total investment | ~₹987 cr, 70% debt-funded; ₹675 cr sanctioned by ICICI and HDFC Bank |
| Renewable project cost of debt | ~8.5%, floating, linked to MCLR |
| Renewable project expected ROE | ~10% |
| Promoter stake | 42% |