Key Takeaways
- Record production, record half-year profit: Crude oil output hit an all-time daily high of 11,000–11,200 MT, up 20% YoY, driving the highest ever half-yearly EBITDA, PBT and PAT alongside sharply higher realizations.
- NRL GRM normalised sharply from Q1’s bumper level: Q2 GRM fell to $20.71/bbl from $35.95/bbl as product FOB prices dropped faster than crude, compressing the spread; management sees this as normalisation, not distress.
- Exploration momentum is tangible, with two new discoveries: A gas discovery in a new KG-DSF zone and an oil discovery in the Cambay Basin were notified; the KG well is currently flowing oil at a very good rate from a second zone under test.
- Gas growth is capped by offtake, not the reservoir: Production will be only slightly higher YoY because downstream consumers are taking shutdowns; the 5 BCM target waits on connectivity, still 18–20 months out.
- What to watch next quarter: The detailed press release on the KG-DSF oil flow, the January decision on Vijayapuram-3’s fate (potential ₹850–₹900 Cr write-off), and whether H2 capex ramps from ₹6,000 Cr to the ₹13,500–₹14,000 Cr full-year target.
Production & Realisations
- Crude oil: Output reached 11,000–11,200 MT/day, an all-time high, and the company is targeting 4 MMT for FY27 with internal ambitions a little higher, expecting to end the year around 4 MMT plus/minus. The 20% YoY growth came from mature fields where 12–15% natural decline was more than offset by deeper drilling (5,500–6,500 m wells) and improved reservoir management.
- Crude realisation: Q2 realisation jumped to $95.38/bbl from $67.22/bbl a year ago, a major contributor to the record half-year profit. Condensate volumes are negligible (0.002 MMT out of 1.021 MMT for the quarter) and priced identically to crude, so they do not move the blended number.
- Gas realisation: Achieved $7.19/MMBtu, above the APM ceiling, because roughly 0.5 MMSCMD of the 8–8.5 MMSCMD total comes from a pre-NELP block with pricing freedom.
- Production resilience: Management argues the 20% growth from the same fields proves the strategy of drilling deeper and monetising near-field exploration faster is working, and expects to stay on a growth path toward 4.2–4.3 MMT once the 4 MMT base is secured.
Borgohain: “Once we achieve 4, I think we should remain there, 4.2, 4.3, and we will keep on growing. That is what is our outlook at present.”
NRL: GRM Normalisation & Expansion Progress
- GRM decline mechanics: Q2 GRM of $20.71/bbl (vs $35.95 in Q1) was driven by FOB product prices falling sharply (MS from $129 to $110/bbl, HSD from $175 to $138/bbl) while crude FOB declined less (from ~$100 to $92/bbl) and SAED remained almost unchanged, compressing the product-to-crude spread. An inventory gain of $5.78/bbl was included in the Q2 figure.
- H1 still strong: Despite the sequential drop, H1 FY27 GRM of $28.24/bbl compares very favourably to $7.73/bbl in H1 FY26. Q2 PAT of ₹701 crores was only slightly below ₹724 crores in Q2 FY26.
- Expansion on track: The NREP project and its associated pipeline are both at ~95% completion, with mechanical completion targeted by March 2027. The existing 3 MMT refinery is standalone and requires no shutdown to commission the additional 6 MMT; ramp-up is planned at 50–60% of the new capacity by Q3 FY28 and 100% by FY29.
- PNCPL pipeline: 1,600 km of 1,640 km is complete; the small land issues that pushed the timeline past the earlier December target are now being closed, and mechanical completion is still targeted by March 2027.
- Capex trajectory: NRL’s FY27 capex target of ₹7,500 crores is on track; FY28 is expected to drop to close to ₹6,000 crores as projects wind down. A regular 4-year turnaround shutdown of the existing 3 MMT refinery is planned for October 2027, lasting roughly one month.
Maharana: “This 3 MMT refinery is a standalone refinery. We have configured this refinery as these two can be operated separately. There is no requirement of shutdown for the 3 MMT refinery, existing refinery, while commissioning this additional 6 MMT.”
Exploration: Discoveries, Deep Wells & the Vijayapuram Overhang
- KG-DSF discovery: A notice of discovery of gas was announced in a completely new zone in the appraisal well. A second zone is currently being tested and is flowing oil at a very good rate; a detailed press release is expected within days. The field development plan will be revisited following these positive results.
- Cambay Basin discovery: Notification of discovery made for high pour point oil at shallow depth; oil was physically observed, and faster monetisation procedures are being deployed.
- Kerala-Konkan first well: Drilling completed at 6,250 m depth, one of the deepest wells in the country; five identified objects are now being tested sequentially. A second well is planned under Mission Anveshan, targeting ~6,500 m.
- Andaman campaign: The rig will move from the KG Basin to Andaman, with well spotting expected by mid-December 2026 and completion targeted within FY27. Based on new 3D seismic data, at least two appraisal wells are planned around Vijayapuram-2 and Vijayapuram-3 to delineate the structures further.
- Vijayapuram-3 write-off risk: The well has not yet been written off; a decision will be taken after interpretation of new 3D seismic data expected by January. If the well is not utilised, the potential write-off is ₹850–₹900 Cr. Management is keeping the option open to re-enter, side-track or deepen the well if the new data supports a structurally better position.
- Dry well provisions: The ~₹280 Cr increase in provisions versus the previous H1 was driven primarily by a ₹1,408 Cr provision for Vijayapuram-1, the first offshore well in the campaign which carried higher initial mob/demob and bundled service costs. This was partially offset by the absence of prior-year overseas block provisions for Gabon and Bangladesh.
Yomdo: “We have not let it go as yet, because you might never know that this current well may come in handy, where we can maybe re-enter this well and side-track it to a more better position, which is structurally much better.”
Gas: Growth Trapped Behind Connectivity
- Production constrained by offtake, not reservoir: Gas output in FY27 is expected only slightly higher than last year because downstream consumers are taking shutdowns; management cited a fertiliser plant that had taken a shutdown on the day of the call. The 5 BCM target is contingent on resolving connectivity, which is expected in another 18–20 months.
- IGGL-DNPL interconnection: Physical interconnection work by NRL and IGGL is expected to complete by end of this month itself, with gas flow expected by January end, subject to PESO, OISD and PNGRB approvals.
- Madhuban gas processing plant: A pipeline is under construction with an 18-month timeline; once complete, the gas processing plant will send an additional average of 0.35 Cr SCM/day.
Borgohain: “We will not be achieving very high, because we have lot of constraints. Today itself, actually, one particular fertilizer, they have taken shutdown because of their requirement.”
Financials: Capex, Dividend Income & One-Offs
- Capex ramp-up needed: H1 FY27 capex was ₹6,000 Cr against a full-year expectation of ₹13,500–₹14,000 Cr, implying a significant step-up in H2. Drilling intensity is rising with 29 rigs operating, 5–6 more in the pipeline, and an internal target of ~100 wells this year, settling into a business-as-usual run-rate of 100–110 wells per year.
- Dividend income boost: H1 FY27 dividend income rose to ₹894 Cr from ₹610 Cr YoY, driven by ₹466 Cr from a foreign subsidiary, ₹336 Cr from NRL and ₹91 Cr from IOCL.
- ITF fire impact: A fire at the ITF (handling ~1,000 KL/day) caused minor production curtailment for 2–3 days; a bypass system has been deployed to other OCS nearby and a full bypass is expected soon, with the curtailed production to be compensated later.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Crude oil production | ~4 MMT for FY27; internal target “a little bit more” | By 31 March 2027 |
| Crude oil growth beyond FY27 | Grow from 4 MMT to 4.2, 4.3 MMT | Ongoing, post-FY27 |
| Gas ramp-up to 5 BCM | Contingent on resolving connectivity constraints | 18–20 months |
| NRL NREP expansion completion | Mechanical completion of refinery; pipeline completion in Q4 FY27 | March 2027 |
| NRL additional capacity ramp-up | 50–60% of 6 MMT; 100% | Q3 FY28; FY29 |
| NRL existing refinery turnaround | ~1 month shutdown (4-year cycle) for existing 3 MMT refinery | October 2027 |
| NRL FY27 capex | ₹7,500 crores | FY27 |
| NRL FY28 capex | Close to ₹6,000 crores | FY28 |
| Oil India FY27 capex | ₹13,500–₹14,000 Cr (₹6,000 Cr spent in H1) | FY27 |
| IGGL-DNPL gas flow | Subject to PESO, OISD, PNGRB approvals | By January end |
| Madhuban gas pipeline | Additional 0.35 Cr SCM/day | 18 months |
| Andaman fourth well | Well spotting; completion | Mid-December 2026; within FY27 |
| Vijayapuram-3 write-off decision | After 3D seismic interpretation; potential ₹850–₹900 Cr if written off | January |
| KG-DSF detailed press release | On oil flow from second zone under test | “In a couple of days” |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Standalone operating revenue | ₹16,029 cr (H1 FY27), highest ever half-yearly |
| Consolidated operating revenue | ₹24,801 cr (H1 FY27) |
| EBITDA | ₹8,450 cr (H1 FY27), highest ever half-yearly |
| EBITDA margin | 48.58% (H1 FY27), up from 34.32% in H1 FY26 |
| PBT | ₹6,609 cr (H1 FY27), highest ever half-yearly |
| PAT (standalone) | ₹5,130 cr (H1 FY27), highest ever half-yearly |
| PAT (consolidated) | ₹6,547 cr (H1 FY27) |
| EPS | ₹31.54 per share (H1 FY27) |
| Interim dividend | ₹7 per equity share, approved by the Board |
| Crude oil production | 0.1 crore metric ton, up 20% YoY |
| Natural gas production | 0.786 BCM |
| Combined oil and gas production | 0.18 crore metric ton |
| Average crude oil price realization | $95.38/bbl (H1 FY27), vs $67.22/bbl in H1 FY26 |
| Natural gas price realization | $7.19/MMBtu, vs $6.75/MMBtu in Q2 FY26 |
| NRL operating revenue | ₹7,991 cr, up 24% YoY |
| NRL capacity utilization | 107.02% |
| NRL distillate yield | 87.01% |
| NRL gross refinery margin | $20.71/bbl (Q2 FY27), vs $35.95/bbl in Q1 FY27; H1 FY27: $28.24/bbl |
| NRL inventory gain | $5.78/bbl |
| NRL EBITDA | ₹1,108 cr, vs ₹988 cr in Q2 FY26 |
| NRL PAT | ₹701 cr, vs ₹724 cr in Q2 FY26 |
| NRL total debt drawdown | ₹20,500 cr, against total tie-up of ₹28,000 cr |
| NRL capex target (FY27) | ₹7,500 cr |
| Upstream capex (FY27 plan) | ₹13,500–₹14,000 cr; actual as of 30 Sep: ₹6,000 cr |
| Wells drilled (H1 FY27) | 42 wells: 16 exploratory, 26 development |
| Exploration success ratio | 82% (exploratory wells), 100% (development wells) |
| Current crude oil production rate | ~11,000–11,200 MT/day, run rate of ~0.41 crore ton/year |
| Oil production growth (current year) | ~15.9% |
| Well write-offs and provisions (H1 FY27) | ₹1,408 cr (Vijayapuram-1), ₹950 cr (Vijayapuram-2); incremental provision of ~₹280 cr vs previous year |
| Dividend income (H1 FY27) | ₹894 cr, vs ₹610 cr in H1 FY26 |