Key Takeaways
- A reset quarter, owned by management: Costs stayed at the December peak of ₹4,500/tonne instead of falling, and volumes were flattish YoY. Management called the miss a failure of internal execution and promised a cost-led turnaround starting Q2.
- Cost reduction is now the explicit, quantified priority: A ₹250/tonne reduction in FY27 and another ₹250 in FY28 is the minimum commitment, with the earlier ₹3,650 target still alive but on a longer timeline.
- Acquired assets are the root of the problem: Penna and Sanghi plants suffered breakdowns, higher heat consumption, and maintenance backlogs that inflated R&M and logistics costs. Turnaround timelines have slipped by 3 to 6 months.
- Capital discipline is tightening: Until promised returns materialize, management will not accelerate capex. The FY28 capacity target may slip to FY30, and new projects will only start after full engineering is complete.
- What to watch next quarter: Whether the Q1 cost stays flattish as guided, the pace of the promised Q2-Q4 cost decline, and any sign that industry pricing can absorb even half of attempted increases.
Cost Reset: The Quarter That Wasn't
- Peak cost, no progress: Total cost exited March at ₹4,500/tonne, identical to December, versus a prior aspiration to approach ₹4,000. Management now calls ₹4,500 the peak and expects progressive improvement from here.
- What broke the plan: Acquired Penna assets needed unplanned maintenance capex and suffered breakdowns. Sanghi's heat consumption stayed 35-40 kcal above target. A West Asia war spike pushed up March packing costs, and fly-ash logistics stayed suboptimal pending railway infrastructure.
- Fixed cost blowout vs peers: Employee and other fixed costs rose significantly YoY, driven by higher branding to push trade and premium sales, higher R&M from breakdowns, and extra logistics from selling more premium cement.
- The ₹3,650 target is not dead, just delayed: Management explicitly reset the timeline, not the ambition. The ₹500/tonne reduction committed over FY27-FY28 is the first leg; the remaining runway to ₹3,650 stays aspirational with no date attached.
Karan Adani: “Yes, partially, there is a reset. We are not moving away from the target. Yes, we are moving away from the time line.”
FY27 Cost & Volume Roadmap
- Cost trajectory: Q1 is expected flattish at ~₹4,500, then acceleration over the remaining three quarters to hit a ₹4,250 average for FY27. The ₹250/tonne reduction this year is the minimum, with another ₹250 in FY28.
- Raw material savings: ₹150-200/tonne expected from fly-ash logistics improvement and green energy cost reduction.
- Volume guidance: Consolidated volumes to grow ~8% to around 8 crore tonnes in FY27, outpacing an industry expectation of 5-5.5%.
- Utilization push: Penna and Sanghi together hold 1.9 crore tonnes of capacity; management targets a 5-10% utilization increase at these assets.
- Premium cement share: 36% of trade sales is considered a sustainable level.
- Internal execution, no excuses: Management stated the guidance is 100% controllable and any miss would be purely an internal execution failure.
Karan Adani: “we are looking at roughly INR250 a tonne reduction this year and then another reduction of INR250 next year as well. That is the minimum reduction that we are looking at.”
Acquired Assets: The Turnaround That Slipped
- Penna and Sanghi are the cost overhang: Breakdowns were predominantly in these acquired assets. Higher R&M costs partly reflect maintenance that was supposed to be done earlier and was not, leading to failures.
- South geography hit Penna hard: Penna's South-heavy footprint exposed it to one of the most affected geographies in the March quarter, with machine shutdowns compounding the volume pressure.
- Sanghi's logistics model: The base ramp-up model relies on road movement and marine infrastructure (7 vessels ordered, delivering progressively from next year), not the Naliya railway line. The railway is an add-on, not a prerequisite.
- SLA-based plant operations: Management is engaging third-party partners to run plants at targeted efficiency levels, which also helps resolve legacy union issues.
- Recalibration of capacity locations: Sanghi will move predominantly into clinker over 3 years, feeding new coastal Gujarat grinding units like Dahej Line 2. Grinding units are being relocated closer to markets in North UP, Bihar, Southern Gujarat, and Maharashtra.
Capex: Discipline Over Speed
- FY27 capex: ₹6,000-6,500 crore, with a ₹6,500-7,000 crore annual run-rate for the next two years.
- Why earlier projects slipped: Wrong contractor selection, starting projects before building the execution team, and launching without full engineering. Going forward, management will complete engineering first, then start construction.
- Capacity target recalibrated: The 11.9 crore tonne target by FY27 end stays, but the broader FY28 plan may move to FY30. Ongoing expansions (1 crore tonnes) will commission between now and September.
- New projects in pipeline: A limestone block in Assam, a new clinker line at Mundra, and a 0.4 crore tonne Maratha plant. Timelines target 24-28 months.
- Capital discipline tied to delivery: Management explicitly linked further investment to first delivering on current promises and achieving returns on capital already deployed.
Karan Adani: “Until the time we are not able to deliver on what we are promising. I don't think so it makes sense to make more capital investment because you don't get the returns on those capital invested as well.”
Demand & Pricing Environment
- Demand softening: April and May demand is subdued and soft, adding pressure on pricing.
- Pricing unable to offset costs: Despite cost escalation, the industry remains under relentless pressure and cannot pass on price. Realization hardly moved QoQ for Orient, while peers saw 1.5-2% improvement.
- Modest price attempts: Management would be happy if the industry captures even half of any attempted price increase, given the soft demand backdrop.
Vinod Bahety: "Despite the circumstances of costs gone up, unfortunately, industry is still under the relentless pressure and not able to pass on the price."
Balance Sheet & Working Capital
- Amalgamation update: Sanghi Industries and Penna Cement amalgamation with Ambuja Cements is complete; ACC and Orient Cement are under process. The consolidated balance sheet now reflects finalized purchase price allocation for Orient and Penna.
- Non-core working capital spike: Increased from ₹1,300 crore to ₹5,500 crore. Management attributed part of it to accounting treatment and said certain incentives will be booked on an actual receipt basis going forward to control this. Specifics were not fully detailed on the call.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cost reduction | ₹250/tonne reduction (minimum) | FY27 |
| Cost reduction | Another ₹250/tonne reduction (minimum) | FY28 |
| FY27 average cost | ₹4,250/tonne average, with Q1 flattish at ~₹4,500 then acceleration | FY27 |
| Volume growth | Consolidated volumes to grow ~8% to ~8 crore tonnes | FY27 |
| Acquired asset utilization | Penna and Sanghi utilization up 5-10% | FY27 |
| Capex | ₹6,000-6,500 crore | FY27 |
| Capex run-rate | ₹6,500-7,000 crore annually | FY27-FY28 |
| Ongoing expansions commissioning | 1 crore tonnes of capacity | Between now and September |
| Project IRR target | 18% | On new capex projects |
| New asset construction timeline | 24-28 months from start | For Assam, Mundra, Maratha |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Annual sales volume | 7.37 crore tonnes, up 16% YoY |
| Normalized EBITDA | ₹6,539 cr, up 31% YoY; ₹887 per metric ton, up 12% |
| PAT | ₹2,647 cr, up 17% YoY |
| Cement capacity | 10.9 crore tonnes |
| Revenue per bag | ₹254, up ~₹1 QoQ; flat vs ₹255 in Q4 FY25 |
| Cost per tonne (Q4) | ₹4,500, includes ~₹250 of cost escalation from West Asia war |
| Cost per tonne (FY26 full year) | ₹4,400, ~10% higher than target |
| Cost per tonne (March exit, normalized) | ₹4,100, barring ~₹250 war-related escalation |
| FY27 cost reduction target | ₹250 per tonne reduction from ₹4,500 peak; FY27 average target ₹4,250 |
| FY28 cost reduction target | Additional ₹250 per tonne reduction |
| FY27 volume guidance | ~8 crore tonnes, ~8% growth |
| Industry growth estimate (FY27) | 5% to 5.5% |
| Trade sales mix | 74% in Q4, up from 68% in Q3 FY26 |
| Premium cement share of trade sales | 36% in Q4 |
| Clinker factor | 65%, improved from 67% in Q3 FY26 |
| Green power share | 32% in Q4, up from 26% |
| Sanghi capacity utilization | 57% |
| Penna capacity utilization | 46% |
| FY26 capex | ~₹7,500 cr |
| FY27 capex estimate | ₹6,000 cr to ₹6,500 cr |
| Capacity expected by end of FY27 | 11.9 crore tonnes |
| Clinker capacity | 6.9 crore tonnes; adding 0.4 cr tonnes at Maratha |
| Branding and advertisement cost (FY26) | ₹70 per tonne |
| RMX EBITDA (FY26 full year) | ~₹300 cr |
| Project IRR target | 18% (all equity) |