Key Takeaways
- Revenue surged, margins compressed: Revenue grew 20.7% QoQ and 13.5% YoY, but gross margin fell to 26.3% from 32.9% a year ago and EBITDA margin dropped to 18.3%, both driven by project mix as the energy segment scales.
- The energy order book is the story: The BESS order book stands at ₹6,000 crores, with a target of ₹10,000 crores by March 2026 and an additional ₹4,000 crores in pipeline, setting up a ~₹3,200 crore consolidated top line for FY27.
- Capacity build-out is on an urgent clock: Equipment for 5 GWh of BESS manufacturing has shipped, a container fabrication facility breaks ground, and a doubling to 10 GWh is targeted by September 2026, all funded by internal accruals.
- Competitive intensity is rising, but management sees a floor: Aggressive bidding compressed margins, yet management expects price stabilization from April and argues margins have already shrunk enough that no further big dip is likely.
- What to watch next quarter: Whether the ₹4,000 crore pipeline converts into orders, the pace of the 5 GWh facility commissioning, and any evidence that competitor aggression is actually cooling as management predicts.
Energy Order Book & Revenue Visibility
- Order book trajectory: The BESS order book has reached ₹6,000 crores and management expects it to hit ₹10,000 crores by March 2026, with an additional pipeline of over ₹4,000 crores expected to be announced in the near future.
- FY27 top line locked in: The consolidated top line from the current order book for FY27 is estimated at ~₹3,200 crores, with approximately 40% of the order book executing in FY27 across both EPC and the asset-owned BOO business.
- BOO order book: ₹3,250 crores of BOO orders are expected to execute over the next two years, with BOO orders estimated to reach around ₹5,000 crores or more in total.
- Non-BOO realization timeline: ₹6,300 crores of non-BOO orders will add to the top line between Q4 FY27 and H1 FY28.
- Telecom still in the mix: Additional telecom orders are expected in the near future, though the energy segment will drive the significant contribution going forward.
- L1 tenders awaiting award: L1 tenders are expected to convert into orders in the next two months, which would take the order book to approximately 6 GWh of BESS capacity.
Venugopal Rao Maddisetty: "We believe we are among the first in the country to deliver so much capacity in the last three months on the BESS systems."
Manufacturing Capacity & Capex
- 5 GWh facility imminent: Equipment for the 5 GWh BESS manufacturing capacity has been shipped from manufacturers, expected to arrive by the first week of March 2026, with commissioning by end of March or latest by 10th April.
- Doubling to 10 GWh: A new facility to expand capacity from 5 GWh to 10 GWh is under construction, targeted for readiness by September 2026, with a capital outlay of ₹80-100 crores.
- Container fabrication in-house: The company will manufacture BESS containers in its own factory, with the facility ready by mid-April, to gain control over input supply and cost; capex of ₹30-40 crores is allocated, excluding land already owned.
- Effective production capacity: For the next financial year, effective production capacity is expected to be approximately 7.5 GWh, reflecting the ramp-up timeline.
- Funding secured: The entire capex program will be funded by internal accruals from the telecom project, with no further equity dilution expected at the Pace Digitek level.
- Import duty advantage: Cell import duty is 5% versus approximately 10% on finished containers from China; the ~$5 duty difference on a $70 product flows into Pace's profit, making the company comparable with China prices on an apple-to-apple basis.
Venugopal Rao Maddisetty: "I can confidently say that we are comparable with China prices on apple-to-apple basis. The duty benefits are helping us."
Margins & Competitive Dynamics
- Margin compression explained: Gross margin fell to 26.3% from 32.9% YoY and EBITDA margin to 18.3% from 21.4%, driven by project mix as the energy segment, which carries slightly lower margins than telecom, scales up; telecom had a one-time benefit from a specific tower erection project.
- Energy margin structure: Energy margins are stable across years, unlike telecom margins which are project-specific; product EBITDA margin runs at 13-15% with EPC adding an additional 8-10%, though management did not provide a blended energy order book margin when asked.
- Aggressive bidding environment: Heavy competition emerged in the last three months; three orders were won before the intensity started and two were in applications where competition was less.
- Stabilization thesis: Management expects prices to stabilize from April onwards, arguing that competitors who bid aggressively are realizing difficulties in executing new sectoral projects and may not bid further.
- Margin floor argument: Margins have already shrunk for the sector; management does not expect a bigger shrink further, citing early-mover advantage that will allow Pace to stabilize product and efficiency by the time competitors arrive in 1-2 years.
- EBITDA margin outlook: Going forward, EBITDA margin is expected to stabilize at the level shown in Q3, as the energy order book becomes a significant contributor to the top line.
Rajavendhan P: "We don't expect a margin dip bigger way because margins are already shrunk for this particular sector of business. We don't see a bigger shrink further to this."
BOO Model & Platform Structure
- TransGreenX Energy incorporated: A new wholly-owned subsidiary, TransGreenX Energy Private Limited (TGX), will act as a platform company managing all SPVs under the Built-Own-Operate model, serving as a HoldCo to provide separate focus on asset-owned businesses.
- Asset migration underway: Assets are being moved under the TGX platform, with manufacturing and EPC kept separate; the MSEDCL project has already booked ₹167 crores as an asset in the consolidated balance sheet.
- BOO capex requirement: Asset creation for the BOO model in the next financial year is estimated at approximately ₹2,200 crores.
- Platform-level fundraising: For future projects, the company is working on raising money at the TGX platform level; as of now, TGX remains 100% owned by Pace Digitek.
- De-merger on the horizon: Management stated they will pursue a de-merger at an appropriate time once value is created in the TGX platform.
- Finance costs to normalize: Finance costs were lower this year due to reduced borrowing, but with the BOO model now kick-started and the first lot of funding secured, finance costs are expected to return to normal levels as term loans come into place.
Venugopal Rao Maddisetty: "The right way of looking at it is that the project cost will come down by netting off the internal profit and therefore IRR is far better."
Working Capital & Balance Sheet
- Comfortable leverage position: The balance sheet carries low leverage, providing flexibility to support growth particularly in the energy business; working capital is managed with continuous focus on milestone-based billing.
- Working capital by segment: Telecom working capital is stretched at 120-150 days due to retention monies inherent in tenders; BESS product working capital runs about 90 days, while EPC is at 90-120 days.
- IPO funds deployed: Higher other income of ₹10.2 crores was mainly due to IPO funds placed into fixed deposits generating steady income.
- Employee expense build-up: Employee expenses rose 44.5% YoY to ₹24.9 crores, reflecting capacity building across the energy sector for commissioned projects; these costs are forward-looking and align with the expanding order book.
- Subsidiary consolidation: Pace Digitek owns about 80% of Lineage Power, with the process to convert to 100% expected by next financial year; Pace Renewable Energies Private Limited (PREPL) is at final stages to convert to a 100% subsidiary, expected by end of March.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Energy order book | Reach ₹10,000 crores | By March 2026 |
| Additional BESS orders | ₹4,000 crores, mix of BOO and EPC at ~60:40 | Q4 FY26 |
| 5 GWh manufacturing facility | Equipment shipped, commissioning | By 10th April 2026 |
| 10 GWh capacity expansion | Doubling from 5 GWh, capex of ₹80-100 crores | By September 2026 |
| Container fabrication facility | Capex of ₹30-40 crores, in-house manufacturing | Ready by mid-April 2026 |
| FY27 consolidated top line | ~₹3,200 crores from current order book | FY27 |
| BOO asset creation capex | ~₹2,200 crores | FY27 |
| Non-BOO order realization | ₹6,300 crores added to top line | Q4 FY27 to H1 FY28 |
| EBITDA margin | Stabilize at Q3 FY26 level | Going forward |
| Price stabilization | Competitor-driven aggression to cool | From April 2026 onwards |
| L1 tender conversion | Awards expected, taking order book to ~6 GWh | Before March 2026 |
| PREPL subsidiary | Convert to 100% subsidiary | By end of March 2026 |
| Lineage Power subsidiary | Convert to 100% subsidiary | By next financial year |
| De-merger of TGX platform | Execute once value is created | At an appropriate time (undated) |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue from operations | ₹644.0 cr, +13.5% YoY and +20.7% QoQ |
| 9M revenue from operations | ₹1,544.5 cr, impacted vs previous year due to execution timing differences |
| Gross margin | 26.3%, vs 32.9% in Q3 FY25, decline due to project mix |
| EBITDA | ₹117.9 cr, margin 18.3% vs 21.4% in Q3 FY25 |
| PAT | ₹78.8 cr, +11.3% YoY, PAT margin 12.2% |
| Employee expenses | ₹24.9 cr, +44.5% YoY, reflecting capacity building for energy sector |
| Other income | ₹10.2 cr, higher YoY due to IPO funds placed in fixed deposits |
| Energy segment order book | ~₹6,000 cr as of call date, target ₹10,000 cr by March 2026 |
| Telecom segment order book | ~₹2,460 cr as of call date |
| Total order book | ₹8,468 cr, of which BOO model ₹3,250 cr and balance ~₹6,300 cr executable between Q4 FY27 and H1 FY28 |
| BOO asset creation during Q3 | ~₹167 cr against BOO order book of ₹3,250 cr |
| BESS delivered during quarter | 400 MWh, of which ~200 MWh commissioned in the field |
| BESS manufacturing capacity | 2.5 GWh operational, expanding to 5 GWh by March 2026 and 10 GWh by September 2026 |
| FY27 consolidated revenue target | ~₹3,200 cr from current order book |
| BOO model equity IRR | ~14%, with cost of borrowing around 9% ±0.2% |
| BESS product EBITDA margin | 13% to 15%, expected to improve with operational efficiency and container fabrication backward integration |