Key Takeaways
- Portfolio reset masks flat revenue: Revenue grew just 7.6% YoY as the exit from ~₹150–200 cr/quarter of low-margin businesses offset underlying growth; PBT jumped 20% on the mix shift.
- Margin expansion is the real story: PBT margin reached 4.4%, driven by vacating water EPC, solar EPC and retail, and replacing that revenue with higher-margin PEB, hydraulics and engineering services.
- U.S. PEB is the margin engine: Ascent's U.S. metal buildings business earns a 28% contribution margin vs India's 15%, and management believes it can beat U.S. market leaders because engineering is done in India.
- Working capital is the drag: Elevated working capital from stuck assets in exited businesses pushed the near-term target to 75 days by March '24, not the 60 days an analyst had modeled.
- What to watch next quarter: Whether the Raebareli plant ramp and new U.S. capacity translate into the promised revenue acceleration, and if collections from exited water and solar EPC businesses actually release working capital.
The Portfolio Reset: Exiting Low Margin, Adding High Margin
- What they exited: Water EPC, solar EPC and retail businesses over the last 1.5 years, which together contributed ~₹150–200 cr per quarter in revenue but at unattractive margins.
- What they kept and are scaling: Five growth verticals: PEB India, PEB U.S. (Ascent), hydraulics, process equipment and boilers, and engineering services. Management says these alone are enough to sustain high double-digit growth without needing new markets.
- The revenue optics: Because they are simultaneously exiting low-margin revenue and adding high-margin revenue, top-line growth looks moderate (5–15%) for the next quarter or two, but the bottom-line impact is amplified by both net revenue increase and margin expansion on the remainder.
- Exiting good markets deliberately: Railways and solar are not bad businesses, but management made a conscious decision to focus; they cannot grow everything.
- Stuck assets from the exit: Receivables in water EPC and solar EPC are taking time to collect due to retention periods, customer sites not being ready, and liability evaluation periods. These stuck assets are the primary reason working capital remains elevated.
- Asset redeployment: Fixed assets and people from exited businesses are being converted to the growth verticals where possible; technical talent in water can move into process equipment, solar talent can move into PEB. Some pool of assets and resources will be unusable and require tough decisions.
Aditya Rao: "We will have to, some markets which are good also, we will not be growing. It's a conscious decision we have taken. Doesn't mean there is anything wrong with it. I think it's a good space, but not the space we have chosen."
U.S. PEB: The Margin Differentiator
- Contribution margin gap: U.S. PEB (Ascent) earns a contribution margin of about 28% versus approximately 15% for India PEB. Management believes even 28% is on the lower side and they can do better.
- Why they can beat U.S. market leaders: Five structural advantages: (1) at a ₹8 cr revenue run rate vs competitors' billion-plus, they have significant room to grow; (2) all engineering is done in India; (3) ability to backward-integrate into other metal products; (4) more diverse steel buying experience gives additional margin; (5) option to produce in India for long-lead items and ship to the U.S. for much higher operating margin.
- Revenue trajectory: U.S. revenue in 2023 was higher than 2022, and 2024 will be higher still; management projects very healthy growth in both revenue and profitability for this financial year.
- Capacity expansion delayed: U.S. capacity expansion is taking longer than planned because the U.S. economy is doing well and adding capacity is off by a quarter or two.
- EBIT advantage: At the EBIT level, U.S. PEB is much higher than India PEB; EBITDA-wise, Ascent would also be higher than India PEB.
Aditya Rao: "I believe that we will be able to get better numbers than those than the market leader in the U.S. I mean, you could either be talking about Cornerstone or UCOR. The reason we would have better margins is because at our current revenue run rate of 8 crore to their revenue of about over a billion, I think there is a significant difference there. And our engineering is all done in India for that."
Order Book & Capacity Build-Out
- Order book snapshot: PEB at ₹580 cr, Railways at ₹90 cr, Boiler increased significantly to ₹140 cr, Ascent USD at $37 million.
- India PEB running hot: Capacity utilization at 80–90% in India; the business is already outsourcing production. A new plant at Raebareli in North India opens in the next few weeks, which will allow much higher capacity utilization.
- India PEB order book growing fast: Management expects the India PEB order book to be a substantially higher number by March, as they pick and choose orders.
- Hydraulics order book up but conversion is slow: The order book has grown significantly, but revenue conversion takes 2–3 quarters because the product development cycle exceeds nine months. Capacity is also being expanded.
- Tubes project phased: Phase 1 of the large-diameter tubes project is complete; phases 2 and 3 will be completed in the next financial year.
- Capacity timeline: By the middle of the calendar year (Q1 next financial year), both India and U.S. new capacities will be up.
Engineering Services: Small Base, High Margin, High Attrition
- The growth ambition: Engineering services is expected to be a ₹100 cr business next financial year, with bottom-line margins of about 20%.
- Body in White is the big bet: Currently serving one large customer (a $300 billion company) in the BIW space; new programs come online in the next two to three months, and by June, quite significant growth is expected. Management targets high double-digit growth and plans to add another customer.
- BIW asset economics: CAPEX in BIW typically gets a 6–8x asset flip, so ₹700–800 cr; while the asset flip is lower than other businesses, payback periods and IRRs are quite decent.
- Attrition is a structural headwind: Engineering services is experiencing high attrition, specifically in building information modeling, structural engineering, and BIW design teams. Management notes this is an industry-wide feature, all competitors face it, and they are monitoring retention rates while scaling up as quickly as possible. They do not believe it will impact revenue.
Working Capital & Finance Costs: The Near-Term Overhang
- Working capital elevated by stuck assets: High working capital is driven by receivables from exited water EPC and solar EPC businesses that are slow to collect due to retention periods, completion of existing order books, and customer sites not being ready.
- Target moderated: Management corrected an analyst's assumption of 60 days by March '24, stating 75 days is the target by March '24. From there, as revenue from growth businesses scales up, working capital should moderate further.
- Finance cost up on multiple fronts: Interest cost is higher due to increased interest rates from last year, stuck assets from low-margin businesses being cut, and investments for growth. Additionally, bank guarantee costs for the PEB business run close to 5–10% of job value and form a large portion of finance costs.
- Finance cost moderation expected: As a percentage of sales, finance costs should moderate once stuck assets are collected and new vertical revenue expands. BG costs should also come down over time with better collections and better advances from the PEB business.
- No factoring of receivables: The company does not substantially factor receivables; any factoring is just discounting and for 15 days or so.
- ROCE healthy despite the drag: On an EBIT of ₹235 cr, with total assets of ₹2,500 cr minus current liabilities of ₹1,500 cr, capital employed is ₹1,050 cr, yielding a consolidated ROC well above 21%.
Margin Trajectory & Profitability Targets
- PBT margin at 4.4% and improving: The improvement came from evolving revenue composition toward higher-margin businesses and vacating low-margin ones; further margin enhancements are anticipated.
- The 5% PAT goal: Management's stated goal is to reach 5% PAT. Getting from the current ~4.4% PBT to the ~7% PBT implied for 5% PAT would take about a year and a half to two years.
- Bottom-line growth to outpace revenue: Sustained double-digit growth and profitability is expected for the next few quarters, with the bottom line growing faster than the top line as the mix shift continues.
- Revenue growth aspiration is higher than 20%: Once the exit from low-margin businesses is complete and all five growth verticals are contributing, management aspires to more than 20% revenue growth. Double-digit growth is expected next financial year.
- Doubling revenue is not a hard challenge: On a gross sales base near ₹4,000 cr, management believes doubling revenue over the next few years is achievable by focusing solely on the five chosen verticals.
Aditya Rao: "Getting from where we are right now, which is around 5 to around 7, would take us about a year and a half, two years, but we will give you better clarity on that, but you will see sustained growth increase and as you had mentioned that is our growth. Our goal is to get to 5% PAT."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Working capital days | Reduce to 75 days | By March '24 |
| Working capital further moderation | Moderate down from 75 days as growth vertical revenue scales | A quarter or two beyond March '24 |
| Revenue growth rate | Moderate growth of 5–15% | Next few quarters |
| Revenue growth acceleration | Double-digit revenue growth | Next financial year |
| PAT margin | Reach 5% PAT (from current ~4.4% PBT to ~7% PBT) | 1.5 to 2 years |
| Engineering services revenue | Reach ₹100 cr at ~20% bottom-line margin | Next financial year |
| India and U.S. capacity | New capacities in both markets operational | By middle of calendar year (Q1 next financial year) |
| Low-margin business exit | Completely exit low-margin businesses | Next 2 to 4 quarters |
| Tubes project | Phase 2 and Phase 3 completed | Next financial year |
| Body in White | Add another customer; new programs online driving significant growth | By June |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Net sales | ₹744.75 cr, up 7.6% from ₹692.22 cr |
| PBT | ₹33.07 cr, growth of 20.08% |
| Cash profit | ₹42.92 cr |
| EBITDA margin | 11.02%, up 149 bps |
| PBT margin | 4.44%, up 49 bps |
| PAT | ₹25.37 cr, up 20% from ₹21.12 cr |
| PAT margin | 3.41%, up 36 bps |
| Working capital cycle days | 77 days as of Dec 31, target of 75 days by March '24 |
| Debt-to-equity ratio | 0.85 |
| Order book – PEB | ₹580 cr |
| Order book – Railway | ₹90 cr |
| Order book – Boiler | ₹140 cr |
| Order book – Ascent (U.S. PEB) | $37 million |
| India PEB order book (current) | ~₹550 cr, expected substantially higher by March |
| Contribution margin – U.S. PEB | ~28% |
| Contribution margin – India PEB | ~15% |
| India PEB capacity utilization | 80–90% |
| ROCE | Well above 21%, on capital employed of ₹1,050 cr and EBIT of ₹235 cr |
| Revenue from exited low-margin businesses | ~₹150–200 cr per quarter exited over last 1.5 years |
| Revenue growth outlook (near term) | 5% to 15% moderate growth as low-margin revenue is replaced |
| Engineering services revenue target (next FY) | ₹100 cr business, with bottom-line margins of about 20% |