Key Takeaways
- Revenue rebounded sharply, but margins lag: Q2 revenue of INR392 crores jumped 22% QoQ on 18% volume growth, yet H1 EBITDA fell to INR32 crores from INR38 crores a year ago as Aluminum realizations and operational costs bit.
- Lead is the steady anchor, Aluminum is the wildcard: Lead margins held at 5.8% while the Aluminum division struggles with OEM-driven pricing that cannot be hedged, making profitability inconsistent and forcing a trader-like inventory model.
- A capacity doubling bet on compliance tailwinds: Management is spending ~INR100 crores to double lead capacity to 200,000 tonnes, banking on Battery Waste Management Rules and EPR credits to shift volumes from unorganized players to larger organized recyclers.
- New verticals are a story of patience, not pace: Plastics stabilization is still one to two quarters away, Aluminum margin stability is pushed to Q1 FY25, and lithium-ion recycling is postponed indefinitely until battery technology matures and end-of-life volumes appear.
- What to watch next quarter: Whether the Harsha Exito plant stays on its October revenue-start timeline, any breakthrough on EPR credit commercialization in Q1 FY25, and if the promised H2 margin and topline improvement actually materializes.
Lead: The Core Engine and Its Doubling Bet
- Volume-led recovery: After a Q1 rotary breakdown that reduced smelting utilization and piled up inventory, smelting resumed in Q2, driving an 18% QoQ volume increase and pulling revenue to INR392 crores.
- Margins held steady despite cost pressure: Lead vertical EBITDA margin was 5.8% in H1 FY24, nearly flat with 5.7% a year ago, even as furnace oil and ancillary smelting costs rose and hit other expenses rather than raw material cost.
- Capacity utilization is a choice, not a constraint: The company operates at 70-75% capacity not because of oversupply but because selling plain vanilla products at full capacity would not yield sufficient profit margin; the focus is on value-added products that deliver additional EBITDA margin.
- The compliance catalyst: Management sees the Battery Waste Management Rules 2022 and proposed EPR credits from R3-level organized recyclers as a game-changer that will shift demand from unorganized and fragmented players to larger organized players like POCL, increasing addressable demand without adding market supply.
- Doubling down on lead: A ~INR100 crore capex program over the next one to one-and-a-half years will double smelting and refining capacity to close to 200,000 tonnes, with the new Harsha Exito plant designed to be more automated, more efficient, and greener than any existing Indian lead plant.
- International ambitions attached: Alongside domestic capacity doubling, the company is conducting feasibility studies for international plants in the MENA region and African continent within the next two years, aiming to penetrate new geographies and increase share in existing Southeast Asian markets.
Ashish Bansal: "The focus will start moving into more organized players and sizable larger players in the country rather than going down to those unfragmented markets."
Aluminum: The Margin Problem Without a Hedge
- Pricing is the structural headache: Aluminum pricing is driven by OEMs and is not LME-linked, so it cannot be directly hedged. Raw material must be mostly imported since domestic aluminum scrap availability is insignificant, and product prices are market-driven based on supply-demand without translating back to OEM finished product pricing.
- No structured hedge exists: The company uses a buffer stock approach: monthly sale of 100 tonnes with 15-day travel time, about 50 tonnes kept as buffer, product sold based on raw material price at time of sale and replaced with material sold. Time risk on arrival timelines is inherent.
- Profitability is inconsistent by design: Management acknowledged that globally, aluminum recycling profitability is inconsistent because no structured hedging or pricing mechanism exists. The company is still new to the industry and is trying to understand cross-hedging or other models.
- Stabilization deferred: Stable margins and growth for Aluminum are now expected only from Q1 FY25 onwards, with turnover uniformity also targeted from FY25. Until a price stability model is developed, the company may have to replace raw material against sales like traders do.
- BIS certification in motion: Execution for BIS certification for the aluminum unit has begun, with certifications expected from December 1, which may support the OEM empanelment and customer base expansion already underway.
Plastics and New Verticals: Stabilization, Not Acceleration
- Plastics is finding its footing: With increased lead capacities, internal generation of plastics will help stabilize plastic plant volumes. Talks with OEMs for contract tolling and creating specific grades of plastics are ongoing, and the operation should stabilize in another one or two quarters.
- Pricing is simpler than Aluminum: Plastic pricing is determined by primary resin price minus a percentage for scrap, with mostly domestic sourcing keeping logistics timelines to a day or two, making the model workable.
- EPR credits: the next unlock: Management expects a breakthrough in commercialization of plastics EPR credits in Q1 FY25, calling it a very exciting opportunity. Lead EPR credits under battery management handling rules are also evolving, with a breakthrough expected next year.
- Lithium-ion recycling is on indefinite hold: Battery technology and construction is still evolving daily, and recycling technology needs the battery technology itself to mature and have sustainable end-of-life volumes. The company has technology partners and has done pilots, but interest became low due to insufficient raw material volumes available in the market.
- Paper recycling under evaluation, ferrous ruled out: A team has been working on paper recycling for over six months, but no confirmation on entering the business; it remains in evaluation with senior management and the Board. The company is definitively not entering ferrous (iron and steel) recycling.
- Rubber waits its turn: Rubber work is just starting but will only be pursued after lead expansion is completed and aluminum and plastics are stabilized; management does not want to take multiple projects simultaneously and keep multiple verticals unstable.
Ashish Bansal: "We'd like to stabilize the lead project, which is our key vertical and then enter into one more new vertical. And by then also the aluminum and plastics should be stabilized. So it's very important to stabilize the existing new verticals and then jump into another new vertical instead of going on adding new verticals and keeping multiple verticals unstable."
Margins and Costs: Pressure With a Promise
- Gross margin took a 1-1.5% hit over the last two quarters, driven by the Q1 rotary breakdown in one unit that reduced smelting capacity utilization and by low Aluminum realizations in H1.
- Furnace oil and ancillary costs are the silent drag: These smelting costs for both lead and aluminum have been higher and flow through other expenses, not raw material cost. Management expects them to stabilize over the next few quarters as operational efficiency improvements kick in.
- Cost mitigation is active but incremental: The company is testing material mix combinations to offset increased chemical and flux costs, including substituting materials, reducing process time, and investing in energy-efficient equipment.
- H2 is promised to be better: Management stated that Q3 and Q4 will deliver better margins and better top lines than Q1 and Q2 of the current financial year, with exports likely coming back a little higher in H2.
- Finance costs to stay elevated: Finance cost is expected at a similar level for the second half, with the rate of interest not coming down in the near future.
Demand Environment and Export Mix
- Conscious shift toward domestic: Export share reduced from ~65% last quarter because management took a deliberate call to increase domestic sales where realizations offered slightly better margins. Demand is still available internationally but realizations are a little lower on exports.
- Contract renewals are challenging: The company is currently in negotiation and resetting contracts for the next calendar year and with some companies for the next financial year, which management described as a little challenging because of the general international market environment.
- Inventory overhang is clearing: Maximum inventory is on the lead side; in Q1, supply contracts were kept intact despite the furnace breakdown, so inventories piled up. These are now slowly coming back into stream, and by the December quarter quite a bit should be realigned to managed levels.
- Aluminum and plastics exports are future options: As markets open up, the company will look at some export sales in aluminum. For plastics, the initial focus is domestic given the unit's location in an automobile hub, with international markets to be explored later depending on EPR terms and norms.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Lead capacity doubling | Smelting and refining capacity to reach close to 200,000 tonnes via ~INR100 crores capex in plant and machinery | Next two years |
| Harsha Exito plant revenue start | Machine installation by July end, trials in September, revenues from October | H2 FY25 (October) |
| Aluminum and plastics margin stability | Stable margins and growth for both verticals | Q1 FY25 onwards |
| Aluminum and plastics turnover uniformity | Uniform turnover from both verticals | FY25 onwards |
| Plastics EPR credit commercialization | Breakthrough in commercialization expected | Q1 FY25 |
| Lead EPR credit breakthrough | Breakthrough under battery management handling rules expected | Next year (FY25) |
| Plastics operation stabilization | Volumes to stabilize with internal generation from increased lead capacities and OEM tolling contracts | One to two quarters |
| H2 performance improvement | Better margins and better top lines vs H1 FY24 | Q3 and Q4 FY24 |
| FY25 top line target | INR1,800 crores to INR2,000 crores | FY25 |
| FY26 top line target | In excess of INR2,700 crores | FY26 |
| Volume target | 2 lakh tonnes (200,000 MTPA) | Next two years |
| International plant feasibility | Feasibility study in MENA region and African continent | Next two years |
| Lithium-ion recycling entry | Postponed until battery technology matures and sufficient end-of-life raw material volumes are available | No timeline (wait and watch) |
| Rubber vertical entry | Only after lead expansion completed and aluminum and plastics stabilized | No timeline (post-lead expansion) |
| Paper recycling entry | Under evaluation for over six months; no confirmation yet | No timeline (evaluation stage) |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Revenue | ₹392 cr, +22% QoQ and +31% YoY |
| Volume growth | +18% QoQ and +20% YoY |
| H1 FY24 revenue | ₹714 cr, +7.4% YoY |
| H1 FY24 EBITDA | ₹32 cr, down from ₹38 cr in H1 FY23 |
| Lead vertical EBITDA margin | 5.8% in H1 FY24, at par with 5.7% in H1 FY23 |
| Sales mix | 45% domestic, 55% exports |
| Lead division revenue share | 93% of total revenue |
| Current ratio | 1.56 |
| Debt-to-equity ratio | 0.71 |
| Return on capital employed | 24% for H1 FY24 |
| Lead recycling market share | ~10% in India |
| Lead capacity utilization | 70–75% |
| Aluminum and plastics capacity utilization | 25–30% |
| FY25 targeted revenue | ₹1,800–₹2,000 cr |
| FY26 targeted revenue | in excess of ₹2,700 cr |
| Lead capacity target | 200,000 tonnes per annum in the next two years |
| Capex planned (next 1–1.5 years) | ~₹100 cr in plant and machinery for lead capacity doubling |