Key Takeaways
- Copper scale-up masks lead pain: H1 FY27 revenue grew 33% YoY to ₹1,639 crores as copper revenue jumped ~4.5x, but lead, the legacy profit engine, saw volumes and margins compress sharply on supply chain disruptions and a mix shift away from value-added products.
- Lead EBITDA per ton fell off a cliff in Q2: Dropped to ~₹16,000 from ₹21,000 in Q1, driven by a value-added mix collapse from ~85% to 60–65% and cost inflation in fluxes, power, and freight that could not be fully passed on.
- Copper cathode is the next leg of the story: Phase I of the 36,000 MTPA facility is on track for trial runs in Q4 FY27, with Phase II by Q3 FY28; total capex of ~₹200 crores is fully funded internally, and raw material sourcing is already tied up in excess of requirement.
- Management is resetting lead expectations hard: The earlier FY27 lead volume guidance of 120,000–130,000 tons is withdrawn; management indicated they could be closer to ~75,000 tons for FY27, with a recovery to a 25,000 tons-per-quarter run rate (1 lakh tons+) promised for FY28.
- What to watch next quarter: Whether Q3 shows the "slightly better" conditions management flagged, whether cost pass-through negotiations with customers succeed in time for January–February contract resets, and whether the copper cathode project stays on its December 2026 commissioning timeline.
Lead: The Core Problem This Quarter
- Volume collapse: Lead production and sales volumes moderated during H1 as supply chain disruptions and production constraints bit; the expanded 72,000 MTPA capacity operated at just 40% utilization. Management disputes an analyst's claim that peers did not see muted volumes, asserting the industry reported standalone declines of 47% and in excess of 40%.
- Mix shift destroyed margin: Value-added product share dropped from ~85% in Q1 to 65% in Q2 because customers insisted on higher pure lead volumes due to their own requirements, whereas last quarter they were more flexible. This mix degradation is the main reason for the EBITDA per ton drop.
- Cost inflation compounded the hit: Fluxes, power, fuel, logistics, and shipping costs all ran up, and the maximum impact was felt in Q2. These costs sit in gross margin, so sourcing is the key element that needs to be passed on.
- Procurement strategy pivoting: The company is shifting procurement toward South America and Southeast Asia, ramping up domestic sourcing, and dropping Middle East volumes. It is tying up with larger yards on an exclusive basis rather than setting up its own overseas collection points, which management argues would not reduce cost.
- FY27 guidance withdrawn: The earlier 120,000–130,000 ton lead sales target "does not hold intact for this financial year" because the situation "drastically eroded." Management stated they could be closer to 75,000 tons but cannot commit exactly.
Ashish Bansal: "You are right, we did give that guidance earlier, but the situation drastically eroded, and there were a lot of changes in terms of supply chain and everything... Definitely, that guidance does not hold intact for this financial year."
Copper: The Growth Engine Scaling Up
- Revenue scale-up: Copper revenue grew ~4.5x YoY and contributed ~47% of the top line in H1 FY27. Production and sales volumes increased over 3x to 5,649 MT and 6,040 MT respectively, supported by the ramp-up of the incremental 6,000 MTPA recycling capacity commissioned in Q4 FY26.
- Recycling profitability normalizing: Copper recycling EBITDA per ton stood at ₹44,536 in H1 FY27, up 30% YoY, but Q1/Q2 elevated levels of ₹45,000–48,000 were one-off due to a market squeeze and higher realizations. The normal guided range is ₹35,000–40,000 per kg.
- Volume lumpiness: Sequential copper volume inconsistency arises from multi-stage processes where certain raw material is partially processed and gets faster processed in one quarter. Management expects this unevenness to go away once the cathode plant and melting facility are online.
- Cathode facility on track: Phase I (18,000 MTPA) is targeted for commissioning by December 2026, with trial runs in Q4 FY27. Equipment installation starts December first week; most import equipment is already shipped. Phase II (18,000 MTPA) is targeted by Q3 FY28. Total investment is ~₹200 crores, with ~₹60 crores already incurred and Phase I spending of ~₹140 crores to complete in the next two to three months, with the balance ~₹60 crores for Phase II in the next financial year.
- Raw material secured: 60–70% of internally generated recycled copper material will feed the cathode facility; ~60% of current Andhra plant production goes to cathode, ~40% continues as sold product. External scrap procurement of ~13,000–13,500 tons is already tied up in excess of requirement, with supply chain routes redesigned for geopolitical issues.
- Demand tailwind: India's copper demand-supply gap remains at a very high level; even after POCL and other players expand capacity, a significant gap will persist and demand will remain robust over the next two to three years.
Ashish Bansal: "Even after the expansion of us or few other players who might be increasing their capacity in copper, there will still significantly be a gap, and the demand will still remain robust on copper side."
Margins & Cost Pass-Through
- Lead margin mechanics: Higher lead realizations do not necessarily mean higher EBITDA per ton because other costs go up accordingly. Certain expensive alloys were done, but the proportion of higher-value alloys sold decreased. The margin differential between value-added and commodity lead products is 0.75–1.25 percentage points.
- Cost pass-through in motion: International negotiations with customers have started; first-level quotations submitted, second round due. Contracts typically reset in January–February. Resistance from buyers is lower this time because they are also not getting raw materials, so they are "inclined also to renegotiate."
- Q3 still under pressure: Cost pressure persists in Q3, but renegotiation with customers is underway with variable clauses in fresh contracts. A full turnaround is expected from Q4.
- Copper cathode margin ambition: Copper cathode EBITDA guidance remains at ~₹65,000 per ton, with potential upside once the plant is up and efficiencies kick in. Management declined to guide on the EBIT margin percentage this translates into, stating they guide only in absolute numbers.
- Cash flow turned positive: Cash flow from operations turned positive during H1 FY27, and the company maintains a net cash and debt-free position. Trade receivables decreased from ~₹265 crores to ₹144 crores.
Ashish Bansal: "As any buyer or every buyer, they will first show the resistance, but here the resistance this time has been lower because at these levels, they are also not getting raw materials, so they are inclined also to renegotiate and increase the pricing in terms of all of these factors."
Strategic Bets: Cathode, BESS & the 2030 Roadmap
- Target 2030 roadmap: Over 15% volume growth, 20%+ CAGR in revenue and profitability, EBITDA margins over 8%, ROCE exceeding 20%, and over 60% revenue from value-added products. Management says the long-term volume growth target of 15% over the next four to five years remains intact and robust.
- BESS adjacency: The company is working on a couple of niche, higher-margin products that could go into the battery energy storage system supply chain. These products would carry conversion spreads at much higher levels than standard LME cathode spreads. Management noted that internationally, a shift from lead-acid batteries to lithium-ion BESS is not currently happening, and other battery makers have indicated no such shift they are expecting in the coming year.
- Lithium-ion recycling not yet viable: Management questioned whether lithium-ion batteries will continue at scale over the next four to five years, and said current volumes "still do not justify" entering lithium-ion battery recycling.
- LME registration is a 12-month process: LME registration for copper cathode will take at least 12 months, but management noted that LME registration "by itself is not a guarantee of sale" and that delivering into a warehouse is a last resort when there is no sale.
Ashish Bansal: "LME registration by itself is not a guarantee of sale. LME registration makes your product deliverable against warrants. But even technically, if you see even right now, we hardly deliver any metal into the warehouse because delivering into a warehouse is last of the sorts when you do not have sale."
Procurement & Supply Chain Reset
- Geopolitical disruption: Developments in West Asia led to considerable disruptions in global supply chains, affecting shipping routes and timely movement of raw materials. Signs of gradual easing are now visible.
- Sourcing realignment underway: The company is being "very specific in choosing procurement locations" and is realigning and reorganizing sourcing as they speak. Middle East procurement volumes have been dropped.
- No owned overseas warehouses: Management's strategy is exclusive tie-ups with larger yards rather than spending capital and manpower on owned collection points in different locations. Setting up a warehouse to collect one metal "does not make a procurement feasibility, and definitely that is not going to reduce cost."
- Domestic sourcing ramp: Domestic procurement is being ramped up, and for copper cathode, domestic sourcing is expected to increase to about 20% over the next year or two.
Ashish Bansal: "Technically, trying to have a specific warehouse and just trying to collect one metal does not make a procurement feasibility, and definitely that is not going to reduce cost."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Lead volume recovery | Minimum 25,000 MT per quarter run rate | FY28 (starting Q4 FY27 turnaround) |
| Lead capacity utilization | Ramp to 70% of expanded 72,000 MTPA capacity | Coming quarters, as supply chain improves |
| Lead EBITDA per ton | Return to guided ₹18,000–₹20,000 per ton | As volumes improve in Q4 FY27 |
| Copper recycling utilization | ~90% of 12,000 MTPA capacity (~10,000 tons) | During FY27 |
| Copper recycling EBITDA | ₹35,000–₹40,000 per ton | Ongoing guidance |
| Copper cathode Phase I | 18,000 MTPA commissioning, trial runs | December 2026 / Q4 FY27 |
| Copper cathode Phase II | 18,000 MTPA commissioning | Q3 FY28 |
| Copper cathode EBITDA | ~₹65,000 per ton, with potential upside | Once plant is up and efficiencies kick in |
| Copper cathode volume | ~16,000 tons, near-full utilization of Phase I | FY28 |
| Total copper volume | In excess of 20,000 tons | FY28 |
| Lead FY27 volume | Closer to 75,000 tons (prior 120,000–130,000 withdrawn) | FY27 |
| Copper FY27 volume | Closer to 10,000 tons | FY27 |
| Cost pass-through | Renegotiated contracts with variable clauses | January–February contract resets; full turnaround Q4 |
| LME registration | Copper cathode LME registration | At least 12 months |
Key Metrics
| Metric | Q2 FY27 / H1 FY27 |
|---|---|
| Revenue (H1 FY27) | ₹1,639 cr, +33% YoY |
| Copper share of revenue (H1 FY27) | 47%, copper revenue grew ~4.5x YoY |
| PAT (H1 FY27) | ₹55.6 cr |
| Cash flow from operations (H1 FY27) | Turned positive; net cash and debt-free position maintained |
| Lead EBITDA per ton (H1 FY27) | ₹18,617, in line with guided range |
| Copper EBITDA per ton (H1 FY27) | ₹44,536, +30% YoY |
| Lead value-added product share (Q2 FY27) | 60%–65% of segment revenue, vs 85% in Q1 FY27 |
| Lead production volume (H1 FY27) | 30,000+ tons across first two quarters |
| Copper production volume (H1 FY27) | 5,649 metric tons, over 3x YoY |
| Copper sales volume (H1 FY27) | 6,040 metric tons, over 3x YoY |
| Lead capacity utilization (H1 FY27) | 40% of expanded 72,000 MTPA capacity; expected to ramp to 70% |
| Copper recycling capacity utilization (H1 FY27) | 100% of 12,000 MTPA capacity (6,000 tons produced) |
| Export share of revenue (H1 FY27) | 46% overall; 55% for lead, 39% for copper |
| Copper cathode project capex incurred | ~₹60 cr of ~₹200 cr total outlay; Phase I (18,000 MTPA) commissioning by Dec 2026 |
| Lead volume target (FY28) | Minimum 25,000 metric tons per quarter |
| Copper cathode EBITDA guidance | ~₹65,000 per ton; recycling guidance ₹35,000–₹40,000 per ton |