Key Takeaways
- Sequential dip, seasonal pattern: Production and sales declined QoQ as calendar year-end holidays in foreign automotive markets delayed imports from mid-December; management calls this an industry trend that reverses in Q4, with January already seeing full-swing activity.
- Margin compression from domestic shift: EBITDA per ton fell as import concentration dropped 10%, forcing costlier domestic procurement; this is transitional and will be partially offset by EPR credits, with domestic and import pricing expected to level within 3–6 months.
- Plastics volumes surged 387% YoY to 2,984 tons in 9M, while copper grew 206% to 249 tons; both are small bases but signal the diversification thesis is gaining traction, even as the plastics subsidiary runs at negative EBITDA during gestation.
- Phase 1 lead expansion imminent: The 36,000 MTPA plant at Thervoy Kandigai begins trial production in March 2025, with 80–85% utilization targeted for Q1 FY26; Phase 2 follows in H2 FY26, making FY26 an exceptional volume year.
- What to watch next quarter: Whether Phase 1 trials proceed on schedule, the pace of domestic procurement cost normalization as EPR commercials roll out to brand owners, and any concrete aluminium re-entry plan beyond the stated FY26 top-line contribution.
Volume & Demand Environment
- Lead: the core engine accelerating: Lead capacity utilization improved to 68.7% from 51.5% YoY; full-year volume expected to cross 90,000 tons. Demand drivers include automobiles, telecom, data centers, EVs, railways, and industrialization, with double-digit growth projected for 2025 and 2026.
- Plastics: riding lead's coattails: Plastics supply is a byproduct of lead battery recycling, so growth is directly proportional to lead volumes. Capacity utilization is targeted to reach 75–80% next financial year, up from current levels.
- Copper: small base, steep trajectory: Volumes rose from 81 tons to 249 tons YoY; management expects 700–1,000 tons this year and 2,500–3,000 tons next year, though the estimate came only after analyst prompting. Copper utilization should reach double digits next year.
- Aluminium: dormancy, not death: The die cast alloy segment was paused because hedging the alloy (80–85% aluminium) proved impossible, hurting even larger players. Management is evaluating an alternative approach with hedging on both supply and demand sides and affirms aluminium will contribute to the top line in FY26.
- Q4 rebound expected: Leftover December tonnage transfers to Q4; January saw raw material inflows and sales in full swing, consistent with the seasonal pattern where Q3 softness reverses.
K. Kumaravel: "This quarter, again, because of the calendar year ending and since we are in the automotive industry, brings a certain amount of decline in terms of quantity because of the holiday season, which is not a decline on this particular quarter standalone, but then it gets kind of compensated in the upcoming quarter."
Margin Dynamics & Domestic Procurement Shift
- EBITDA per ton under pressure: The decline versus last year stems from a 10% drop in import concentration, which pushed procurement toward costlier domestic raw material. Management calls this transitional, with EPR credits expected to partially compensate in subsequent periods.
- Domestic mix rising structurally: Domestic procurement share increased to 25% from 15% last year, a positive long-term shift that brings the company closer to battery sources. The target is to move from the current 74:26 import-to-domestic ratio toward 60:40 or 55:45 as both grow in absolute terms.
- EPR as the equalizer: Implementation of Extended Producer Responsibility is expected to bring domestic and international pricing to a level playing field within 3–6 months, though near-term volatility will persist during the transition as EPR commercials are communicated to brand owners and OEMs.
- Blended EBITDA margin path: Management is targeting a transition from 6% to 8% over 3–4 years, with near-term improvement to "close to 6% plus levels" in upcoming quarters. The new Thervoy Kandigai plant's smarter, leaner design promises benefits in manpower, fuel efficiency, and operational batch time.
Piyush Dhawan: "It is not going to happen overnight, but it is also not going to happen over one year. It is going to happen within 3 to 6 months because that is how we see the overall market shaping up."
Expansion: Phase 1 & Phase 2 Lead Capacity
- Phase 1 (36,000 MTPA) at Thervoy Kandigai: Erection and commissioning are in final stages; trial production starts the first week of March 2025, with coal trials happening in February. Utilization is expected to reach 80–85% in Q1 FY26, with Q1 partial and Q2 full at 75–80%.
- Phase 2 timeline: Expected to commission in Q2 FY26 (September/October onwards), with capacity utilization around 70–75%. On a blended basis, the TKD plant should deliver 50–55 metric tons of output next year.
- Technology edge: Management describes the new plant as "first of its kind," "state-of-the-art," with smarter, leaner, more integrated engineering that will deliver savings in manpower, fuel efficiency, and operational batch time versus existing facilities.
- FY26 as an exceptional year: The expansion creates a "jerk" in volume growth, making FY26 an outlier above the 15–20% long-term CAGR target. Lead segment specifically is guided for 20% CAGR over 5–6 years.
K. Kumaravel: "This is far more smart, lean and integrated. So there is a certain amount of benefit in manpower, a certain amount of benefit in terms of the efficiency in fuel and in terms of the entire operational batch time, there is going to be a lot of savings."
Diversification: Beyond Lead
- Lead dependency reduction roadmap: Target to reduce lead revenue share from 95%+ to 90% by end of this financial year, then to 80% in FY26, and 70% thereafter — a 10-percentage-point reduction each year.
- Plastics subsidiary (POCL Future Tech): Material margin and operating margins are positive, but EBITDA is negative due to gestation-period investments. A complete turnaround is expected next financial year, with capacity utilization rising to an ideal 75–80%.
- Copper as the second pillar: Management calls copper a "very important portfolio after lead" and expects significant growth in upcoming quarters, with utilization reaching double digits next year. The secondary route benefits as nonferrous metals decline from the primary route.
- Aluminium re-entry: After pausing the die cast series due to hedging impossibility, the company is evaluating an alternative product portfolio approach with hedging on both sides. Aluminium is "affirmatively going to be contributing to the top line in FY26" and will be part of the journey for the next three years.
- Lithium-ion: preparing, not committing: A feasibility study is underway; the procurement cycle is expected to begin in FY27 (calendar 2027), at which point the company aims to be "plug and play prepared." Implementation requires Board approval and is still at the feasibility stage.
- R&D and value-added products: The company is setting up R&D facilities for value-added products across the nonferrous portfolio, including lead alloys, pure lead improvements, plastic compounds, and rubber. Target: 60%+ revenue from value-added products under the 2030 vision.
Regulatory Tailwinds & Industry Structure
- Government initiatives are net positive: BWMR, PWMR, EPR, and GST all help transition volumes from the unorganized to the organized segment and create a level playing field. RCM is expected to be notified shortly.
- Unorganized players: integration, not elimination: Management expects unorganized players to become part of the organized ecosystem, complementing the value chain for procurement rather than being eliminated. This is framed as positive for the entire recycling economy.
Piyush Dhawan: "Elimination is not something which is the positive approach forward. I mean bringing them aligned with an ecosystem, which is good for the entire economy of India and also in recycling is what we foresee."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Phase 1 lead plant trial production | Trial production begins at Thervoy Kandigai | First week of March 2025 |
| Phase 1 utilization ramp | Reach 80–85% utilization | Q1 FY26 (April–June 2025) |
| Phase 2 lead expansion commissioning | Phase 2 capacity online | Q2 FY26 (September/October 2025) |
| Phase 2 utilization | 70–75% capacity utilization | From September/October 2025 onwards |
| Lead full-year volume (FY25) | Cross 90,000 tons | Current financial year |
| Copper volume (FY26) | 2,500–3,000 metric tons | Next financial year |
| Plastics subsidiary turnaround | Complete turnaround to positive EBITDA | Next financial year |
| Lead revenue dependency reduction | 90% by FY25-end, 80% in FY26, 70% thereafter | Annual milestones through FY27 |
| Aluminium top-line contribution | Aluminium contributes to top line | FY26 |
| Domestic procurement mix target | Move from 74:26 to 60:40 or 55:45 (import:domestic) | Over time, as both grow in absolute terms |
| Blended EBITDA margin | Transition from 6% to 8% | Over next 3–4 years |
| 2030 vision targets | 15%+ volume growth, 20%+ revenue CAGR, EBITDA margin >8%, ROCE >20%, 60%+ revenue from value-added products, 20% reduction in energy consumption | By 2030 |
| ROCE | 15–18% this year, 20%+ next year | FY25 / FY26 |
| Lithium-ion procurement cycle readiness | Plug-and-play prepared when procurement cycle begins | FY27 (calendar 2027) |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Consolidated revenue | ₹509 cr, up 11% YoY |
| Consolidated EBITDA | ₹26 cr, up 11% YoY |
| Consolidated EBITDA margin | 5.2%, flat YoY |
| Consolidated PAT | ₹13 cr, up 31% YoY |
| Consolidated PAT margin | 2.6% |
| Lead production volume | 21,186 metric tons, up 6% YoY |
| Lead sales volume | 21,618 metric tons, up 9% YoY |
| Lead EBITDA per ton | ₹12,569, up 2% QoQ, down 24% YoY |
| Lead capacity utilization | 68.7%, up from 51.5% a year ago |
| Plastics production volume (9M) | 2,984 metric tons, up 387% YoY |
| Copper production volume (9M) | 249 metric tons, up 206% YoY |
| Domestic procurement share | 25% of total procurement, up from 15% a year ago |
| Phase 1 lead expansion capex | ₹70 cr, funded via QIP and internal accruals |
| QIP funds raised | ~₹175 cr |
| ROCE guidance | 20% plus for FY26, 15–18% for FY25 |