Key Takeaways
- CapEx surge, revenue dip: Capital expenditure more than doubled YoY to ₹7,649 crores in Q3, while revenue from operations declined 3% YoY, a structural feature of regulated tariffs where interest income falls as depreciation is recovered.
- Works in hand swells to ~₹1,47,000 crores: Seven TBCB wins in Q3 plus a new ₹3,500 crore Karnataka project pushed the order book higher, with a ₹52,000 crore bidding pipeline still to convert.
- Capitalisation inflection ahead: Management guided capitalisation of ~₹18,000 crores for FY25, stepping up to ~₹25,000 crores next year and ~₹35,000 crores the year after, setting the stage for a material revenue and profit lift.
- Execution bottlenecks are real: Procurement of transformers and GIS, plus right-of-way issues, are stretching project timelines; management acknowledged it is challenging to complete projects within two years.
- What to watch next quarter: The pace of March capitalisation (target ~₹10,000 crores), the Pang-Kaithal HVDC award, and any further dividend trajectory signals as equity needs rise with CapEx.
The Revenue Decline Mechanics
Regulated transmission income is structurally designed to decline each year. As depreciation is recovered, the loan component in the tariff base shrinks, reducing the interest portion of revenue. Management quantified the drag: depreciation recovery of ~₹12,000-₹13,000 crores at ~7.5%-8% interest translates to a ~₹700-₹900 crore annual reduction in transmission income. Profit after tax stays flat because it is computed on return on equity, not on the total tariff.
Ravisankar: "The transmission income of the regulated business is bound to come down. This is what the structure, the one-time expenditure will increase, whereas the interest on loan will come down, but the PAT will remain same."
- Q3 consolidated profit fell despite rising capitalisation because dividends taken from SPVs exceeded their consolidated quarterly profits, the JV EESL contributed a ₹140 crore loss, a CERC order shaved ~₹140 crores, and prior-year one-offs did not repeat.
- EESL drag: Power Grid has not infused equity into EESL for almost a year; the cumulative nine-month loss from its 39% stake was ₹140 crores, with the Q3 portion at ~₹40 crores.
- CERC O&M impact: The tariff regulation order had a ₹140 crore negative impact in Q3 versus Q3 FY24; management approximated the nine-month impact at ~₹450 crores.
CapEx & Capitalisation Trajectory
| Metric | FY25 (current) | FY26 (next) | FY27 (following) |
|---|---|---|---|
| CapEx plan | ₹23,000 crores | ₹28,000–₹30,000 crores | ₹35,000 crores (may go higher) |
| Capitalisation target | ~₹18,000 crores | ~₹25,000 crores | ~₹35,000 crores |
| Equity requirement | — | ~₹5,000–₹6,000 crores | — |
- Execution to date: CapEx reached ₹19,480 crores by 31 January; capitalisation stood at ₹7,906 crores. Management expects ~₹10,000 crores of assets to be completed by March, with all projects in an advanced stage.
- Works in hand: ₹1,43,749 crores at quarter-end, rising to ~₹1,47,000 crores after the Karnataka project win. With a ₹52,000 crore bidding pipeline and a 50% strike rate, the total could reach ~₹1,70,000 crores.
- Commissioning timeline: AC section projects worth ~₹1,08,000 crores are to be commissioned over the next three years; management is trying to hit two-year timelines but acknowledged right-of-way issues cause delays.
R.K. Tyagi: "Let me accept that there are challenges in completion of these transmission projects within two years."
- Regulated business additions: ~₹40,000-₹45,000 crores of RTM projects are expected to be added.
TBCB Wins & Competitive Dynamics
Power Grid won seven ISTS TBCB projects in Q3 with a levelized tariff of ₹2,077 crores, maintaining a 50% share of annual tariff, 58% of NCT cost, and 57% of project count won up to Q3.
| Project | Details |
|---|---|
| Rajasthan REZ Phase IV (Parts 3, A, B) | Three separate wins in the Rajasthan renewable energy zone |
| Kudankulam Units 3&4 evacuation | Evacuation system for the nuclear plant expansion |
| Koppal-II / Gadag-II strengthening | Karnataka transmission strengthening |
| Khavda area augmentation Phase V (Parts B1, B2) | Augmentation in the Khavda renewable zone |
| Bidar substation augmentation | Karnataka substation work |
| Karnataka transmission project | ~₹3,500 crores, won after quarter-end |
- Fatehpur-Bhadla bid discipline: Power Grid's earlier win at ₹12,700 crores was annulled; the rebid was won by Adani at ~₹25,000 crores. Power Grid's revised bid was ₹3,700 crores versus the winner's ₹3,500 crores, and management chose not to go beyond the L1 limit because it was not in their range.
R.K. Tyagi: "We have revised our bids, and for us the parameters what we decided that we will not go beyond the L1 limit. So that was our stand on the project because it was not coming in our range."
- Procurement strategy: High-value items like transformers and GIS are a real challenge; Power Grid mitigates this through bulk procurement of transformers irrespective of projects, and is discussing with GIS suppliers to start manufacturing in India.
HVDC Pipeline
| Project | Status | NCT / Cost |
|---|---|---|
| Khavda to Nagpur | Ordered on Hitachi; design engineering ongoing; Bhoomi Puja done; execution starting shortly | NCT ₹24,000 crores; actual ~₹35,000 crores |
| Pang to Kaithal (Leh) | Under bidding; queries still being raised by Hitachi and Siemens; award expected Q1 FY26 | >₹20,000 crores |
| KPS3 Khavda to South Olpad | Coming under bidding | NCT ~₹12,000 crores |
| Rajasthan to Maharashtra | Visible in pipeline | Not disclosed |
| Andhra Pradesh HVDC | Visible in pipeline | Not disclosed |
| Andaman HVDC (RTM) | Not in mature stage; no concrete development | Not applicable |
- Technology confirmed: The Leh-Kaithal project will use VSC (Voltage Source Converter), not LCC.
- Total industry CapEx: Management confirmed that ~₹3 lakh crore CapEx over the next two years per NEP plans is a fair assumption.
Subsidiaries & Adjacent Businesses
- PowerTel (telecom): Nine-month income rose 22% YoY from ₹594 crores to ₹722 crores; added 12 new customers; backbone availability at 100%; received its first International Long Distance business order in Q3; enabled fibre-to-home broadband in Tura, Meghalaya.
- Smart meters: Focus remains on completing the Gujarat contract (67 lakh meters); not considering any other state until experience is gained.
- Rajasthan intrastate JV: Joint venture company formed; MDs have joined; projects being identified by the Government of Rajasthan.
- Data centre: Land procured from SIPCOT in Chennai for a Disaster Recovery Zone-2 Data Centre.
Capital Structure & Dividend
- Dividend reduction: Interim dividend per share was reduced because CapEx jumped from ₹12,500 crores last year to ₹23,000 crores this year, requiring more equity infusion. Management signalled it may go further down as CapEx rises.
R.K. Tyagi: "We require more and more equity to be infused for our CapEx requirements. So that is the reason we are slowly, slowly, we may go further down."
- But not a collapse: Management stated the dividend will not fall very steeply to ₹2 or ₹3 per share, and such a drop is not even permitted under DIPAM guidance. The plan is to balance cash retention for CapEx with shareholder returns, and as more projects are commissioned, rising revenue and PAT will help maintain the dividend.
Ravisankar: "It's not going to fall very steeply to like ₹2 or ₹3 something like that. It's not even permitted as per the DIPAM guidance also."
- PG InvIT monetisation on hold: No plan in the near future to disinvest assets into PG InvIT because NMP guidelines from August 2021 treat revenue rights transfer as a lease charge attracting 18% GST on NPV, making it not value-accretive. Power Grid has instead adopted securitisation of SPV cash flows, raised bonds, and opened a TRA account for debt servicing.
- Green Loan: Secured a first Green Loan Agreement of $200 million with Sumitomo Mitsui Banking Corporation, Japan, for funding RE projects; management expects a benefit of at least a few basis points in rate.
- Foreign debt strategy: With TONA at a competitive rate, Power Grid is exploring other markets instead of domestic sources and aims to maintain a currency mix.
Ravisankar: "Now since the TONA is almost at a very competitive rate, we are exploring the other markets."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY25 CapEx | ₹23,000 crores | FY25 |
| FY25 capitalisation | ~₹18,000 crores | FY25 |
| March quarter capitalisation | ~₹10,000 crores of assets to be completed | By March 2025 |
| FY26 CapEx | ₹28,000–₹30,000 crores | FY26 |
| FY26 capitalisation | ~₹25,000 crores | FY26 |
| FY27 CapEx | ₹35,000 crores (may go higher) | FY27 |
| FY27 capitalisation | ~₹35,000 crores | FY27 |
| Equity requirement | ~₹5,000–₹6,000 crores | FY26 |
| Pang-Kaithal HVDC award | Expected to be awarded | Q1 FY26 |
| AC project commissioning | ~₹1,08,000 crores of projects | Next three years |
| Smart meter expansion | No new states until Gujarat contract experience gained | Indefinite |
| Dividend floor | Will not fall to ₹2–₹3 per share; DIPAM guidance prohibits | Ongoing |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Consolidated total income | ₹11,743 cr, declined 3% YoY |
| Consolidated PAT | ₹3,862 cr, lower YoY due to one-time CERC impact and JV losses |
| Standalone total income | ₹11,609 cr |
| Standalone PAT | ₹3,894 cr |
| Nine-month consolidated total income | ₹34,869 cr |
| Nine-month consolidated PAT | ₹11,379 cr |
| Nine-month consolidated EBITDA | ₹30,148 cr |
| Nine-month EPS | ₹12.23 per share |
| Book value per share | ₹98.51 |
| Debt-equity ratio | 59:41 |
| Return on net worth (nine months) | 12.42% |
| Average cost of borrowing | 7.54% in Q3 FY25 |
| Q3 CapEx | ₹7,649 cr, vs ₹3,444 cr in Q3 FY24 |
| Nine-month CapEx | ₹17,651 cr, vs ₹7,690 cr last year |
| FY25 CapEx plan | ₹23,000 cr, revised upward from ₹12,500 cr last year |
| Q3 capitalisation | ₹3,417 cr, vs ₹1,784 cr in Q3 FY24 |
| Nine-month capitalisation | ₹7,423 cr, vs ₹5,780 cr last year |
| FY25 capitalisation target | ~₹18,000 cr |
| Works in hand | ₹1,43,749 cr, plus ₹3,500 cr Karnataka win, becoming ~₹1,47,000 cr |
| Projects won in nine months (cost basis) | ₹63,909 cr; Q3: ₹19,828 cr |
| Levelized tariff of projects won in nine months | ₹8,027 cr; Q3: ₹2,077 cr |
| TBCB market share (up to Q3) | 50% of annual tariff, 58% of NCT cost, 57% of number of projects |
| Transmission system availability | 99.81% for nine months |
| Trippings per line | 0.24 during nine months |
| Q3 transmission lines commissioned | 1,399 circuit kilometre |
| Q3 transformation capacity commissioned | 9,185 MVA |
| Billing realisation efficiency | 101.48%, with realisation of ₹28,404 cr against billing of ₹27,989 cr |
| Outstanding dues | ₹4,380 cr, down from ₹4,735 cr in Q2 and ₹6,633 cr in Q3 FY24 |
| CERC tariff regulation O&M impact | ~₹140 cr in Q3; ~₹450 cr for nine months |
| EESL JV share of loss (nine months) | ₹140 cr (Power Grid's 39% stake) |
| Telecom subsidiary nine-month income | ₹722 cr, up 22% YoY |
| First interim dividend | ₹4.5 per share; second interim: ₹3.25; total ₹7.75; full year expected ~₹9 |
| FY26 CapEx guidance | ₹28,000 cr to ₹30,000 cr |
| FY26 capitalisation guidance | ~₹25,000 cr |
| FY27 CapEx guidance | ₹35,000 cr, may go higher |
| Projects under bidding | ₹52,000 cr worth, with traditional 50% strike rate expected to add ~₹25,000–₹27,000 cr |
| Green loan secured | $200 million from Sumitomo Mitsui Banking Corporation, Japan, at ~1% interest rate |
| Smart meter order | ~67 lakh meters to be installed in Uttar Gujarat and Madhya Gujarat |