Key Takeaways
- Orders explode on mega HVDC win: Orders surged 309.7% YoY to INR 3,054.6 crore, powered by a single 1000 MW Kudus-Mumbai HVDC link order, while revenue grew a more modest 24.4% YoY.
- Margins squeezed by four simultaneous headwinds: Product mix, semiconductor shortages, supply chain disruptions and commodity/forex swings all hit in the same quarter, with no one-off items to blame.
- Semiconductor pain is structural, not cyclical: Safety stocks are exhausted, inflows are reducing, and management does not expect normalization before calendar year 2023, forcing product redesigns and a shift toward less chip-dependent lines.
- India is being positioned as a global supply chain hub: A new high-tech bushing factory was inaugurated, export revenue hit 23% of the total, and a three-pronged export strategy is underway with factory expansions and greenfield projects lined up.
- What to watch next quarter: Whether the HVDC project pipeline materializes as promised (at least one project every 1–1.5 years), the pace of semiconductor normalization, and any stabilization in freight costs that management calls "unprecedented."
The Mega Order: Kudus-Mumbai HVDC Link
- Order book transformed: A single 1000 MW HVDC link order between Kudus and Mumbai drove the 309.7% YoY order surge, increasing Mumbai's power supply by nearly 50%.
- Execution underway: The 38-month timeline started in June 2022, with approximately 80% local manufacturing content.
- Technology dominance: Management stated that more than 50% of the global HVDC installed base, including new projects in India and worldwide, runs on Hitachi Energy's technology.
- Pipeline acceleration: Management expects at least one HVDC project every year or every 1.5 years going forward, a sharp acceleration from the historical pace of one every 3–4 years.
- Leh-Kaithal next in line: The company is keen and has been working with customers; the tender is expected "shortly," with a storage component likely planned after the HVDC portion.
- Order value undisclosed: Management declined to share the exact Adani HVDC order value, citing a customer request for confidentiality, and noted it was not a public tender so L2 bidder information is unavailable.
Nuguri: "More than 50% of our installed base, including the new projects around the world, including India, runs through our technologies."
Margin Headwinds: Four Simultaneous Hits
- Product mix drag: The revenue product mix shifted unfavorably this quarter, compressing margins relative to prior periods.
- Semiconductor shortages: Safety stocks have been exhausted while inflows were reducing; the issue evolved from high prices to delivery delays to outright non-availability, hitting grid automation and HVDC product lines hardest.
- Supply chain disruption: Increased freight and logistics costs, plus occasional non-availability of materials, created an additional layer of cost pressure.
- Exchange and commodity fluctuations: Currency moves and rising commodity prices compounded the three operational headwinds.
- Freight costs "unprecedented": Overseas freight costs are not up by a percentage but "in terms of X," and traditional escalation clauses do not cover increases of this magnitude.
- No one-offs: Management confirmed there were no unusual or one-off expenses beyond these four stated factors.
Nuguri: "So far, we were able to manage from our safety stocks. But while the safety stocks were there, we have exhausted those safety stocks and the inflows were actually reducing."
Semiconductor Strategy: Redesign, Reallocate, Wait
- Normalization distant: Management's best estimate is quarter-to-quarter improvement, but a return to pre-crisis levels will not happen before calendar year 2023.
- Product redesign underway: The company is reducing dependency on chips by redesigning products and increasing focus on lines not heavily semiconductor-dependent, including COMBILFLEX, RTU, enterprise software and network control.
- Global collaboration: Teams are working across geographies on stock-sharing and material allocation, while proactively stocking fast-moving electronic items.
- Price pressure ahead: Analysts predict material costs for semiconductors could rise another 10–15% in the near term due to inflationary pressures.
- Force majeure innovation: Semiconductor non-availability has been included as a force majeure clause in some contracts, described as a unique way to protect margins.
Nuguri: "The best estimate is that it will definitely improve, but to normalize it anywhere, it'll go into the 2023 or so in that. It will improve from quarter-to-quarter, but really to normalize to the level where we used to see, and that is not going to be before the year 2023."
Export & Manufacturing: Building a Global Supply Hub
- Export corridor held: Exports reached 23% of total orders this quarter, already within the 20–25% mid-term target corridor, with orders from Uganda, Saudi Arabia and Azerbaijan.
- Three-pronged export strategy: (1) direct product exports from global feeder factories, (2) component sales to global factories, (3) direct sales to customers in Africa, Middle East and South Asia.
- New high-tech factory: A factory for resin cast, resin integrated polymer bushing for 400kV transformers was inaugurated last quarter, described as first-time, high-technology-intensive manufacturing in India.
- Capacity expansion lined up: Several factories are planned for expansion and new greenfield projects to support the export push.
- India as alternative supply chain: Management sees potential for India to become a resilient partner offering high-quality products globally, as customers look for alternative supply chain routes.
Segment Growth & Pipeline
- Transmission and renewables lead: These segments are expected to grow higher than the normal market average, and company strategy is to grow above the market.
- Industrial CapEx robust: The pipeline is described as very robust across steel, cement, aluminum and data centers, though some decision-making delays are possible due to the current macro situation.
- Rail and metro active: Orders won for traction transformers from Indian Railways and a private rail equipment manufacturer, with high-speed rail tendering assessed to begin in Q4 FY23.
- Service portfolio growing: The service business delivered 10% YoY growth, adding new customers including PSTCL, Vardhman and ST Telemedia, and booking the first order for Modular Switchgear Monitoring from Hitachi Japan.
- Order acceptance discipline: Management reiterated a multi-quarter strategy of refusing any project or order without escalation clauses, especially those with long gestation periods.
Nuguri: "We never take any order to sacrifice our margin to get an order. We don't want to book an order for the sake of booking order."
Sustainability & Operational Milestones
- Carbon neutral by 2030: The company has identified potential to reduce 62% of CO2 emissions by the end of this fiscal year and is maintaining 100% fossil-free electricity consumption.
- First non-financial disclosure: Published its inaugural Business Responsibility and Sustainability Report for the FY21-22 period.
- Smart grid education: Inaugurated a smart electric lab at NIT Warangal for smart electric grid technology education, skills development and research.
- Diversity progress: Added 30% more female employees in the last year, with a "Diversity 360" initiative to leverage innovation through collaboration.
- Energy assessments: Conducted energy assessments across all manufacturing locations and nominated location leads for the BEE Certified Energy Manager course.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| HVDC project pipeline | At least one HVDC project every year or every 1.5 years | Ongoing, starting from current cycle |
| Kudus-Mumbai HVDC execution | 1000 MW link, ~80% local manufacturing | 38 months from June 2022 |
| Semiconductor normalization | Return to pre-crisis availability levels | Not before calendar year 2023 |
| Export revenue corridor | 20–25% of total orders and revenue | Mid-term target; already at 23% |
| High-speed rail tendering | Tendering activity to begin | Q4 FY23 |
| Carbon neutral operations | 62% CO2 reduction identified this fiscal year; full carbon neutrality | 2030 |
| Leh-Kaithal HVDC tender | Tender expected; company keen and engaged with customers | "Shortly" (no specific date) |
Key Metrics
| Metric | Q1 FY23 |
|---|---|
| Orders received | ₹3,054.6 cr, up 309.7% YoY |
| Revenue | ₹991.3 cr, up 24.4% YoY |
| Operational EBITA | ₹15.3 cr |
| Profit before tax | ₹2.1 cr |
| Profit after tax | ₹1.3 cr |
| Order backlog | ₹6,777 cr, providing ~20 months of revenue visibility |
| Exports share of orders | ~23% of total orders in the quarter |
| Service portfolio growth | 10% YoY |
| Industry segment order growth | 100% YoY |
| Forex and commodity price fluctuation impact | ₹13 cr total impact for the quarter |
| Royalty fees | ~4% of sales, same level as earlier periods |
| Portfolio with escalation clause | Over 65% of the portfolio |
| Manufacturing localization | More than 80% of globally manufactured portfolio manufactured locally |
| HVDC Mumbai project local manufacturing | 80% of the project will be manufactured in India locally |
| CO2 emission reduction potential identified | 62% by end of this fiscal year |