Key Takeaways
- Orders surge, revenue stalls on chips: Orders grew double digits for a second straight quarter, but a semiconductor shortage blocked dispatch of finished panels, costing an estimated ₹100 crores in lost revenue and compressing PBT margins by 2–3 percentage points.
- The energy-transition pipeline is hardening: Three HVDC projects are now visible versus a historical pace of one every five or six years, and the Leh Ladakh transmission grant of ₹8,300 crores in the Union Budget moves that project closer to bid stage.
- Chip pain is peaking, not permanent: Lead times remain six to 12 months and deliveries are still uncertain, but management sees signs of improvement and expects normalization progressively over the next couple of quarters.
- Revenue will lag orders by design: Robust revenue-recognition policies on imported items, project-specific constraints, and the natural conversion cycle mean the 100%+ cumulative order growth over nine months has not yet flowed through to the top line.
- What to watch next quarter: Whether the chip shortage actually eases enough to release the ₹100-crore stuck revenue pool, the pace of HVDC bid activity post-Budget, and any margin recovery as the supply-chain actions (alternative suppliers, design changes, advance orders) begin to bite.
The Quarter: Orders vs. Execution
- Order book strength: Second consecutive quarter of double-digit order growth, led by transportation and infrastructure, utilities, and industries; customers are grasping the urgency of the pace of change needed to reach Net Zero and carbon neutrality.
- Green corridor wins: A large order for 500 MVA 765/400 kV transformers and 110 MVAR 765 kV shunt reactors was secured for inter-state green energy corridors supporting renewable energy evacuation, alongside multiple air-insulated substation orders for wind and solar projects.
- Railways traction: Supplied transformers for the Vande Bharat initiative, including the first order for V Connected transformers; the accessible market across five railway projects (9,000 hp, 12,000 hp, EMU, Vande Bharat) is pegged at ₹4,000–₹4,500 crores, with OEM bids expected to finalize over the next year.
- Exports and services steady: Export orders grew 11% YoY for products, with deliveries to Chile, Congo, Bhutan, Africa and Asia; service orders held steady year-on-year, with lifecycle service partnerships gaining traction in traction transformer repairs, GCB overhauling, and grid automation.
- Revenue recognition lag: Revenue growth of 4–5% in Q3 (13% for nine months, with the ₹100-crore chip impact added back) trails order growth because of robust revenue-recognition policies on imported items, project-specific constraints, and the natural conversion cycle.
The Chip Shortage: Impact and Response
- The ₹100-crore hole: Manufacturing of panels was completed but dispatch was impossible because relays were missing; the cost was already incurred but revenue could not be recognized, creating a revenue loss of approximately ₹100 crores.
- Bottom-line damage: Per management, without the chip-related revenue loss, PBT margins would have been roughly 2–3% higher; the implied bottom-line impact was approximately ₹31 crores.
- Lead times still long, but improving: Lead times were six to 12 months and not guaranteed; management now sees definite signs of improvement, though deliveries remain uncertain.
- Four-pronged fix underway: The company is talking to existing manufacturers, looking at alternative suppliers, modifying product designs to use available chips, and placing advance orders at least one year ahead.
- Force majeure protection: All customers have been notified that the chip shortage constitutes force majeure under contract conditions, and management stated customers recognize this is not an organization-specific delay.
Venu: "While a lot of our manufacturing has completed in these panels, but because of some relays not there, so, we are unable to dispatch those things and able to gain revenue. While the cost has come in already, we were not able to gain."
Margin Walk and Cost Structure
- Three headwinds hit profitability: Commodity price increases, the semiconductor shortage, and rising interest expense all pulled on the bottom line during the quarter.
- Material and people costs steady: Material cost held at 62–63% of revenue and personnel cost was more or less steady; employee cost is mostly fixed, as are royalty and group charges, while freight, power and fuel, travel, third-party services, and exchange rate fluctuations are the variable portions.
- Interest expense spike: The increase in interest expense was primarily due to bank loans taken during the quarter, with interest rates having risen to around 7%; debt actually declined from ₹315 crores to ₹275 crores, but intra-quarter working capital movements drove the higher interest charge.
- Export freight rose YoY: Export freight costs increased substantially year-on-year because of time-bound shipments, while domestic transportation costs were at the same level or slightly lower than last year; an analyst noted this contradicts the broader industry trend of falling international cargo costs, and management did not reconcile the divergence.
- No unfavorable mix to work through: Management pushed back on the idea of an unfavorable project mix, stating only a couple of fixed-term projects are in the portfolio with execution ongoing; the bulk of the order backlog carries variable contracts.
A Singh: "If you would have not had this, probably there would be roughly in the range of 2% to 3% margin would be on the upside compared to what we are having."
Energy Transition: The Pipeline Is Real
- ISTS transmission plan: The government has prioritized integration and transmission of 500 GW-plus of renewable energy, with projects expected to come to full fruition looking ahead toward 2030.
- HVDC inflection: India historically saw one HVDC project every five or six years; management now envisages one per year, with three projects currently visible: Leh Ladakh, Khavda, and a third project now coming up clearly.
- Leh Ladakh catalyst: The Union Budget provided a ₹8,300-crore grant for the Leh Ladakh transmission project; consultancy bids have been submitted and main bids are expected to accelerate following the grant.
- Kudus Mumbai corridor: Deliveries are in the range of 40 to 45 months; the first 15 months are for design, power system studies, approvals, engineering, and simulations; construction is set to start soon, with revenue expected to begin by the middle of the next financial year.
- Railways and metros: Indian Railways has committed to net zero emissions by 2030 and is modernizing with electrification projects such as 2 x 25 kV electrification of High-Density Corridors; eight to ten metro projects are planned for award over the next 12 months.
- Datacenter and 5G tailwind: Data localization regulations are supporting datacenter operators to build and expand their footprint, while the 5G launch is further strengthening digital infrastructure demand.
Venu: "Previously, India is to have one HVDC project for every five or six years, and we said that, we envisage one per year, which is in line with our envision, in line with our thought process is coming out."
Growth Strategy and Capacity Build-Out
- Grow faster than the market: Management’s stated strategy is that if the market grows at x, Hitachi aims to grow higher than x; orders have grown more than 100% cumulatively over nine months, and revenues will follow with a lag.
- Export ambition: The target is for exports to contribute around a quarter of total orders; export orders grew 11% YoY for products.
- Service scale-up: Service is currently high single digit on a low base, with the ambition to move to double digits over time; lifecycle service partnerships are gaining traction across traction transformers, GCB overhauling, SCADA and controls replacement, and grid automation.
- Capacity expansion underway: Factories are being continuously expanded; management is specifically looking at expanding traction transformer facilities to cater to new demand from the large number of locomotives announced by railways.
- CAPEX to continue: CAPEX spend is expected to continue in coming quarters to support the expansion.
- IT independence from ABB: A transformation project is underway to upgrade the STP system and build own IT infrastructure; the transactional services agreement with ABB for IT services is targeted to end in 2023, as early as possible.
- Digital and Lumada pilots: The company is running multiple pilots with major industrial customers and securing a couple of wins every quarter; the base remains low but growth is in high single digits.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Chip shortage normalization | Lead times improving; actions include alternative suppliers, design changes, advance orders | Progressively over the next couple of quarters |
| Kudus Mumbai revenue start | Revenue recognition to begin after design, studies, approvals and engineering phase | Middle of next financial year |
| IT independence from ABB | Transactional services agreement with ABB for IT services to end | 2023 |
| Railway OEM bids finalization | Five projects with ₹4,000–₹4,500 cr accessible market; OEMs bidding | Next one year or so |
| Analyst meet at Vadodara facility | Physical meet to showcase power systems evolution and energy transition readiness; global CTO attending | March 3, 2023 |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Revenue | ₹1,041 cr |
| Revenue growth (9M YoY) | 13% |
| Orders received | ₹1,222.1 cr, up 31.3% YoY |
| Order backlog | ₹7,231.3 cr, providing ~20 months revenue visibility |
| Operational EBITA | ₹29.9 cr |
| Profit before tax | ₹13.4 cr |
| Profit after tax | ₹4.6 cr |
| Material cost | 62–63% of revenue, QoQ |
| Revenue loss from chip shortage | ~₹100 cr in the quarter |
| Bottom-line impact from chip shortage | ~₹31 cr |
| Margin upside absent chip shortage | 2–3% higher at PBT level |
| Debt level | ₹275 cr gross, net debt ~₹150 cr |
| Export order share | 20–25% of quarterly orders |
| Service revenue share | high single digit percentage, plan to reach double digit |
| Datacenter orders growth | >300% YoY |
| Royalty expenses | 3.5% of revenue, range 3.5–4% |