Key Takeaways
- Record disbursements and profit, overshadowed by RBI draft: Disbursements surged 67% YoY and PAT grew 27%, but the call was dominated by the RBI's draft project-finance circular, which management insists will not touch P&L, net worth, or book value.
- The RBI circular is a Tier 1 capital story, not a P&L story: For Ind-AS NBFCs like REC, the additional provisioning flows through an impairment reserve, hitting only Tier 1 capital in a phased manner, with 40% of the loan book (state-guaranteed) entirely out of scope.
- A doubling of ambition, powered by renewables and logistics: Management targets a $125 bn AUM by 2030, driven by a 10x renewable portfolio and a 4x non-power infra book, while also capturing 35-40% of the government's 94 GW coal capacity addition.
- Spread widened 41 bps and is guided higher still: NIM improved to 3.57% as cost of funds fell 15 bps; management expects the spread to climb from 2.8% toward 3.0%, helped by better-rated borrowers and high-margin new segments.
- What to watch next quarter: The final RBI guidelines (comments due June 15), any calculation of the Tier 1 capital impact, and whether the promised infrastructure push materializes in the June/July budget.
The RBI Draft Circular: Accounting, Scope & Competitive Fallout
- P&L and net worth shielded: REC follows Ind-AS, so any additional provisioning required by the final circular will be routed through an impairment reserve as an appropriation of profit, not a P&L charge. Management was explicit that profits, net worth, and book value are unaffected.
- Tier 1 capital is the sole pressure point: The impairment reserve is not a free reserve, so it will reduce Tier 1 capital. Management has not yet quantified the impact, waiting for the final guidelines, but argues that profits generated over the next 1-2 years will offset any subsequent hit.
- 40% of the book is state-guaranteed and out of scope: Based on prior discussions with the RBI, loans backed by state government guarantees are excluded from exposure norms. Only 5-10% of this guaranteed portion is for project funding; the rest is non-CapEx lending (LPS, LIS, RBPF) that does not attract the new provisioning.
- Only under-construction CapEx is caught: Of REC's ~$62 bn AUM, most assets are already commissioned. Only about $12 bn of projects are under construction and would be impacted. For the renewable book of $4.2 bn, 80% is already commissioned, leaving only $840 mn exposed.
- Conventional generation carries the largest absolute hit: Approximately $7.2 bn of conventional generation projects fall under the draft norms. Distribution CapEx, which is only 35% of the distribution portfolio, also attracts provisioning.
- A competitive moat may widen: Management argued that banks, which already largely avoid direct infra lending, may pull back further if the circular forces them to raise lending rates. REC, with its stable cost structure and specialized appraisal capability, expects to face less competition, not more.
Dewangan: "Our profits are not going to be affected by this stipulation. Our net worth is also not going to be affected. We have done a detailed analysis. Book value is not going to be changed. Only if it would be on our Tier 1 capital."
Growth Engine: The $125 bn AUM Ambition
- AUM doubling by 2030, possibly sooner: The formal target is ~$125 bn by FY30, but if the current 17% loan-book growth holds, management says the milestone could be reached by FY29. The tone was confident but deliberately conservative.
- Renewables: a 10x portfolio target: The renewable energy book, currently ~$4 bn (7% of AUM), is slated to grow to ~$40 bn (30% of AUM) by 2030. Approvals in the segment already jumped 533% YoY, spanning green hydrogen, pump storage, solar manufacturing, wind, and electric mobility.
- Non-power infra: a $25 bn fourth engine: Since being allowed into non-power infra logistics in October 2022, REC has sanctioned $5 bn and built a $6 bn AUM. The 2030 target is ~$25 bn, or 15-20% of the projected portfolio. Management has hired domain experts and built dedicated appraisal teams.
- Coal: a 94 GW opportunity: The government has identified 94 GW of additional coal-based capacity by 2032, with approvals expected in the next 2-3 years. REC expects to finance 35-40% of this, a space where it faces limited competition from banks and private-sector lenders.
- Disbursement momentum is set to accelerate: FY25 disbursements are targeted at a minimum of $21 bn, with a deliberate shift toward CapEx-heavy disbursements after a year where non-CapEx (LPS, LIS) dominated. Renewable projects, with their 2-3 year gestation, will begin converting sanctions into disbursements.
Dewangan: "If this 17% growth is continued, then we'll be able to reach this INR10 lakh crores by the year 2029 itself, in next 5 years, not 6 years. So it is more likely actually, but I'm slightly conservative. I'm not giving this bullish figure."
Margin & Spread: The Path to 3%
- Spread widened 41 bps to 2.86%: The improvement was driven by a 15 bps reduction in the cost of funds, which fell to 7.13% through a deliberate shift toward cheaper foreign-currency borrowing and 54 EC bonds.
- Cost of funds has further room to fall: Management expects the cost of borrowing to decline after Q2/Q3. Foreign borrowing, now 29% of the mix (up from 24%), carries an all-in hedged cost of 6.6-6.7%, roughly 100 bps cheaper than domestic sources. The 54 EC bond book is targeted to grow from $4.8 bn to over $6 bn.
- Spread is guided to 3%: As utility ratings improve, interest rates for better-rated borrowers may compress the spread, but management expects this to be more than offset by volume growth and higher-margin segments like coal-based generation, large hydro, pump storage, and non-power infra.
- Green bonds provide a pricing edge: A green bond raised in April at an all-in hedged cost of 7.01% allows REC to pass lower rates to renewable projects, partially insulating them from any pass-through of the RBI circular's cost.
- Asset quality is non-negotiable: Management stated a clear willingness to sacrifice margin before compromising on asset quality, a stance it linked directly to the company's underwriting culture.
Dewangan: "So we do hope that our spread is going to improve further, not going to come down. It may go up to 3% actually, from 2.8% it may increase to 3% actually."
Asset Quality & Resolutions
- Gross NPA stands at ~$1.66 bn: Of this, 7 projects worth ~$267 mn are heading toward liquidation and are already 100% provisioned, so they carry no further P&L risk.
- Resolutions are unlocking value: Projects worth ~$600 mn have already been resolved (Lanco Amarkantak, Dans Energy, Bhadreshwar, Nagai). The remaining ~$840 mn in stressed assets carries good resolution prospects, with Mahanadi described as the best operating asset under NCLT and KSK Mahanadi attracting over 30 expressions of interest, raising hope for 100% recovery.
- Provisioning is already conservative: REC's Ind-AS provisioning is higher than IRAC norms, so no separate impairment reserve exists today. ECL provisioning applies only to Stage 3 assets, using LGD and PD based on borrower ratings.
- The operating environment is improving: AT&C losses have fallen from 22% to 15.5% over two years, driven by the RDSS scheme. Government subsidies are now paid quarterly in advance, and the late payment surcharge rules have improved DISCOM payment discipline, which in turn strengthens state gencos and transcos.
The Power Sector Tailwind
- Demand is on a structural upswing: Power demand grew 8% last year and 11% in April, with management expecting an upward trajectory for at least the next five years. This underpins the entire lending opportunity across generation, transmission, and distribution.
- DISCOM health is a virtuous cycle: The combination of RDSS (revamped distribution scheme) and the late payment surcharge scheme is improving DISCOM financials. Legacy dues under LPS are expected to clear in 2-3 years, and a modernization scheme is being planned to follow RDSS, ensuring continued CapEx.
- Storage is the missing piece: Management acknowledged that renewable energy's intermittency requires commercially viable storage. A breakthrough in fuel cell technology could reduce the need for aggressive coal capacity additions, while green hydrogen and green ammonia are expected to scale significantly.
- The budget is the next catalyst: A major infrastructure push is anticipated in the June/July budget, which management expects will further accelerate sanctions and disbursements across both power and non-power infra.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| AUM target | Double to ~$125 bn (INR 10 lakh crores) | By FY30, possibly FY29 if 17% growth holds |
| Renewable portfolio share | Grow from 7% to 30% of AUM (~$40 bn) | By FY30 |
| Non-power infra AUM | Grow ~4x to ~$25 bn (15-20% of portfolio) | By FY30 |
| Coal capacity financing share | Capture 35-40% of the 94 GW addition | Over next 8 years (by 2032) |
| Spread target | Improve from 2.8% to 3.0% | Not dated |
| FY25 disbursements | Minimum $21 bn (INR 175,000 crores), CapEx-heavy | FY25 |
| 54 EC bond book | Increase from ~$4.8 bn to over $6 bn | Not dated |
| Cost of borrowing | Expected to decline, partially offsetting RBI circular pass-through | After Q2/Q3 FY25 |
| Tier 1 capital impact from RBI circular | No impact for 1-2 years; thereafter offset by profits | Next 1-2 years and beyond |
Key Metrics
| Metric | Q4 FY24 |
|---|---|
| Sanctions | $43 billion in FY24, +34% YoY |
| Disbursements | $19.3 billion in FY24, +67% YoY |
| Total AUM | $62 billion, +17% YoY |
| Interest income on loan asset | $5.5 billion in FY24, +19% YoY |
| Total income | +20% YoY |
| Profit before tax | $2.12 billion in FY24, +29% YoY |
| Net profit | $1.68 billion in FY24, +27% YoY |
| Cost of funds | 7.13%, down 15 bps from 7.28% in FY23 |
| Spread | 2.86%, improved 41 bps from 2.45% in FY23 |
| Net interest margin | 3.57%, increased 19 bps from 3.38% in FY23 |
| Return on net worth | 22.17% |
| Capital adequacy ratio | 25.82%, with Tier 1 capital at 23.32% |
| Gross NPA | ₹13,800 crores |
| Renewable energy portfolio share of AUM | 7%, approximately $4 billion |
| AUM growth target | $125 billion by 2030, or by 2029 if 17% growth sustained |
| Renewable energy portfolio target | $40 billion by end 2030, 10x current |
| Non-power infra logistics AUM | $6 billion, targeting $25 billion by end 2030 |
| Power demand growth | +8% in FY24, +11% in April FY25 |
| AT&C losses | 15.5%, down from 16.5% and 22% two years prior |
| Disbursement target for FY25 | ₹170,000–180,000 crores minimum |
| Renewable energy sanctions pipeline for FY25 | >₹175,000 crores |
| Loan book under construction impacted by RBI draft norms | ₹1 lakh crore out of ₹5 lakh crore AUM |
| Loan book supported by state government guarantees | ~40% |
| Provisioning on 7 projects heading to liquidation | 100% on ₹2,222 crores |
| Provisioning on KSK Mahanadi NCLT account | 52.4% |
| Green bond all-hedge cost (April issuance) | 7.01% for ₹75 crores raised |
| Foreign currency borrowing all-in cost | 6.6%–6.7% |
| Share of external commercial borrowing | 29%, up from 24% |