Key Takeaways
- Demand soft, pricing steady: A seasonally weak monsoon quarter saw volumes supported by new capacity, but realizations were flat and EBITDA collapsed 91% YoY on stubborn input costs.
- Costs are the story: Power and fuel cost spiked to ₹2,066/ton (vs ₹1,263/ton YoY), driving a ~1,500 bps margin squeeze; a conscious CPP shutdown and fuel mix shift promise ₹250/ton relief in Q3.
- Volume guidance held, EBITDA slashed: The 0.5 crore ton full-year target is maintained, but management now expects EBITDA "a lot lower" than the ~₹400 crore originally indicated, with no revised number yet.
- Andhra Cement acquisition is the binary catalyst: The NCLT process is ongoing with a stay only on voting; management is "more than hopeful" of a resolution before end of Q3, and the deal is fully funded via structured debt and equity.
- What to watch next quarter: Whether the ₹200–250/ton Q3 realization uptick holds and widens, the pace of power and fuel cost savings, and the Andhra Cement NCLT outcome.
Cost Structure & Margin Pressure
- Power and fuel spike: Average fuel cost jumped to ₹2,066/ton from ₹1,263/ton YoY, driven by elevated coal and pet coke prices; the CPP consumed expensive coal at ~₹12/unit, prompting a conscious decision to switch it off and return to grid power.
- Fuel mix shift underway: The mix moved from 50:50 domestic coal:pet coke to 60:40, which management expects to deliver a minimum ₹250/ton saving on power and fuel in Q3; Q4 savings are uncertain as pet coke prices briefly dipped but are trending up again.
- Raw material stubbornness: Key raw material prices remained fairly stubborn during Q2, contributing to the margin compression; some softening has been witnessed but whether the trend continues is uncertain.
- Freight flat but poised to fall: Freight cost was nearly flat YoY at ₹797/ton; a small increase was purely due to lead distance, but as Jajpur and Jeerabad ramp up, freight is expected to trend down toward a ~275 km lead distance target.
- Blended cement ratio as a cost lever: The blended cement portfolio increased, raising raw material cost but with an offsetting power and fuel benefit; management targets a 70:30 blended:OPC mix over the next couple of years, which it says will make its power and fuel cost "look a lot lower" versus peers.
Sreekanth Reddy: "I think the minute we get aligned, which is not very far that once we get aligned with most of our peers in terms of same blended cement ratios as they would, our power and fuel cost also would be looking at a lot lower than the other sir."
Volume & Realization Outlook
- Volume guidance intact: Full-year volume target of 0.5 crore tons maintained as high probability, with a worst-case floor of 0.48 crore tons; Satguru (MP) held at ~0.06 crore tons, while Jajpur is trimmed to ~0.03 crore tons from ~0.04 crore tons.
- New units contributing: Jajpur and Jeerabad together contributed ~0.03 crore tons in H1; Q2 saw MP at 77k tons and Jajpur at 35k tons, with ramp-up expected to accelerate.
- Utilization split tells the story: Group utilization was 49%, but with extreme variation: Gudipadu at 93%, Bayyavaram at 64%, Mattampally at 50%, Jeerabad at 30%, and Jajpur at just 10%, highlighting the early-stage ramp of new assets.
- Q3 realization uptick, but insufficient: The first 15 days of Q3 saw a ₹15–20/bag increase on average across markets, translating to ₹200–250/ton if the trend holds; management explicitly states "this is not enough, a lot more has to happen."
- Trade mix normalization expected: Trade share dipped to 55–57% during the monsoon (vs a normal 65:35) due to higher non-trade sales; management expects a reversion to the 65:35 norm going forward.
- Central region demand-supply favorable: UP demand is expected to be far higher than potential supply, and incremental volume from the Jajpur ramp-up should be absorbed quickly; even with new supply from Amethi and JK likely next year, old favorable trends are expected to continue.
Sreekanth Reddy: "The realizations have been in range of anywhere between ₹15 to ₹20 on an average per bag. So ₹200 to ₹250 per ton can be expected if it remains in a similar kind of a thing, but this is not enough. Yeah, a lot more has to happen."
Andhra Cement Acquisition
- The binary catalyst: The NCLT resolution process for Andhra Cement is ongoing; Dalmia has filed something but there is no PIL and no stay on the process, only a stay on voting; management is "more than hopeful" the transaction concludes before end of Q3 FY23.
- Fully funded: The acquisition is backed by ₹500 crore in structured debt and ₹350 crore in equity from Premji Invest; management says debt levels are "more or less at peak" and the balance sheet position remains similar to past guidance.
- Capacity addition: If the acquisition fructifies in Sagar's favor, it would add 0.26 crore tons of capacity, moving the company closer to its stated 1 crore ton target.
- Inorganic pipeline contingent on Andhra: Management disclosed having "at least another asset" on its radar but stated that the outcome of Andhra would determine how it progresses on that option; the target remains to reach 1 crore tons.
- Pushback on financial details: When asked about cash outflow for the acquisition and subsequent capex, and about equity upside if the deal falls through, management declined to comment, citing the ongoing bidding process.
Sreekanth Reddy: "We are more than hopeful that, at an NCLT, the Andhra transaction should get concluded or there is a possibility that it should get concluded before end of Q3 is what is the impression that we have."
Capacity Expansion & Optionality
- Capex cycle largely complete: Capex for both Odisha and Madhya Pradesh assets is done; only small operational capex remains, with ~₹20 crore to be spent over the next six months on a large shade at Mattampally; full-year maintenance capex is capped at ₹30 crore.
- Gudipadu as first expansion priority: The plant can comfortably triple from 0.1 crore tons to close to 0.4 crore tons and is the first priority for any capacity addition.
- Mattampally deferred by choice: Despite huge scope (42 crore tons of limestone, potential up to 80 crore tons), management has taken a conscious call to defer any brownfield or greenfield expansion in the South to avoid putting pressure on itself and the market.
- Satguru limited: Only a small cement increase of ~0.05 crore tons is possible; clinker scope is very limited because the deposit life needs to be 40–50 years.
- Brownfield cost elevated: Current brownfield capex cost is running at $80–100/ton, which management flagged as elevated.
Sreekanth Reddy: "In Mattampally, scope is huge, but we have taken a conscious call that we would only do it after some time because given the South adding a Brownfield or a Greenfield in South not only would put pressure on us, but also on the market."
Regional Demand Dynamics
- South: demand growing but supply caught up: Contrary to the perception that the South is stagnant, demand did grow; however, supply also caught up, keeping utilization in the 45–65% range; management says 80% utilization is "near 100% near impossible in South at any given point of time."
- South election tailwind: Demand is expected to cross pre-COVID levels (8.1 crore tons) by H1 next year, if not this year; historically, demand peaks two years before elections, and most states performed 20% higher than last year but for rain.
- Central region promising: The supply-demand equation has always favored more demand and less supply; even with new capacity coming, UP demand is shaping up such that old trends may continue, and things look "more promising than ever before."
- Infrastructure and affordable housing: Demand revival toward quarter-end was aided by a pickup in infrastructure and low-cost affordable housing segments.
Sreekanth Reddy: "...contrary to what most of the people think South did grow sir, it's not that it remains stagnant, but supply also had caught up with it."
Logistics & Operational Efficiency
- Lead distance improving: The lead distance target is 275 km, down from ~300 km earlier; current assets with the road mix should help reach that number.
- Turnaround times slashed: Turnaround times have reduced heavily, e.g., from 15 hours to under 5 hours for a 200 km trip; carrying capacity has increased from sub-20/25 tons to 50–60 tons.
- Tollages negate near-term savings: Most infrastructure improvements come with tollages, creating a net negative effect on cost in the short term; management expects medium-to-long-term savings once the infrastructure is fully operational.
- Rail not a priority: Rail dispatch has no target and is not a big option for current markets and assets; road typically gives the best freight rates.
- Delhi-Mumbai expressway benefit: The expressway near Dahod will definitely help the Satguru plant supply Indore, Baroda, and Ahmedabad, though the extent of realization improvement is uncertain.
Sreekanth Reddy: "...most of this infrastructure is happening with tollages sir. So, there is a net negative effect on the overall kind of cost even on that... this could be a short term, but medium to long-term, we definitely think it will save quite a bit."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year volume | 0.5 crore tons (worst case not below 0.48 crore tons) | FY23 |
| Power and fuel cost saving | Minimum ₹250/ton reduction | Q3 FY23 |
| Andhra Cement NCLT resolution | Transaction concluded in Sagar's favor | Before end of Q3 FY23 |
| Maintenance capex | Not exceeding ₹30 crore | Full-year FY23 |
| Trade mix normalization | Revert to 65:35 trade:non-trade | Going forward |
| Blended cement mix | 70% blended, 30% OPC | Over next couple of years |
| Lead distance | 275 km | No date (target stated) |
| Full-year EBITDA | "A lot lower" than ~₹400 crore indicated at start of year; quantum to be determined later | FY23 |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ₹475 cr, up 29% YoY from ₹369 cr |
| EBITDA | ₹6 cr, down 91% YoY from ₹61 cr |
| EBITDA margin | 1%, vs ~16% in Q2 FY22; raw material surge compressed margin by ~1,500 bps |
| Loss after tax | ₹49 cr, vs profit of ₹20 cr in Q2 FY22 |
| Average fuel cost | ₹2,066 per ton, vs ₹1,263 per ton in Q2 FY22 |
| Freight cost | ₹797 per ton, vs ₹795 per ton in Q2 FY22 |
| Overall capacity utilization | ~49% |
| Mattampally utilization | 50% |
| Gudipadu utilization | 93% |
| Bayyavaram utilization | 64% |
| Jeerabad utilization | 30% |
| Jajpur utilization | 10% |
| Trade share | 55–57%, expected to revert to 65:35 trade:non-trade mix |
| Lead distance | 271 km |
| Gross debt | ₹1,486 cr, of which ₹1,275 cr long-term, remainder working capital |
| Net worth (consolidated) | ₹1,581 cr |
| Debt-equity ratio | 0.81:1 |
| Cash and bank balances | ₹308 cr |
| Full-year volume guidance | 0.5 cr tons maintained, worst case not below 0.48 cr tons; H1 achieved 0.22 cr tons |
| Full-year EBITDA guidance | Revised downward from earlier ~₹400 cr; quantum to be determined |
| Expected fuel cost saving in Q3 | Minimum ₹250 per ton on power and fuel |
| Price increase observed (exit Sep–mid Oct) | ₹15–₹25 per bag across most markets; Hyderabad +₹18–20, Vizag +₹15, Bangalore +₹25, Tamil Nadu +₹25, Maharashtra +₹20, Odisha +₹10 |
| Blended cement mix target | 70:30 blended to OPC over next couple of years; historically sub-40% blended |
| Andhra Cement acquisition capacity | 0.26 cr tons (per diligence) |
| Andhra Cement limestone reserves | ~16.5 crore tons |
| Market share (India) | ~0.9% to 1%, on ~42.5 cr ton base |