Key Takeaways
- Volume guidance trimmed, margin recovery on track: FY24 volume guidance revised down to 0.62 crore MT from 0.64 crore MT, but H2 EBITDA per ton is guided at ₹800–₹850, more than doubling H1’s run-rate.
- Operating leverage is the H2 story: With major maintenance behind it, management expects ₹100–₹150/ton of cost relief from higher volumes alone, plus a tailwind from flat fuel costs and rising realisations.
- Prices are healing but not yet healthy: The recent price hike lifts the industry toward 15% EBITDA, but management says another 2%–3% gross increase is needed to reach a sustainable 18%+ return.
- Expansion gate still closed: Three plant expansions that would take capacity to 1.2 crore MT by end-FY25 are awaiting investment committee approval, expected within 15 days; only maintenance CapEx is committed for the next six months.
- What to watch next quarter: Whether the investment committee clears the expansion package, whether the Telangana and Madhya Pradesh elections create a visible demand dent, and whether the price hike holds through the quarter.
Volume & Demand
- Guidance trimmed on election caution: Full-year volume guidance moved to 0.62 crore MT, with Q3 pegged at 0.18 crore MT and Q4 at 0.20 crore MT, reflecting a small haircut for election-related labour disruption in Telangana and Madhya Pradesh.
- South demand resilient: Southern demand grew 12%–13% in H1 and is expected to close the full year at very high single-digit or very low double-digit growth, with the Telangana election notification flagged as a temporary labour-availability headwind rather than a demand shock.
- Odisha and MP recalibrated: Odisha demand seen at high single-digit; Madhya Pradesh outlook cut from double-digit to single-digit because of the election notification.
- Price-volume decoupling: Management’s multi-decade experience is that cement price increases do not contract demand, because cement is under 3% of low-cost housing cost, under 1% of luxury housing, and under 5% of infra project cost.
- Interregional risk still open: Most contiguous regions took similar price increases, so management does not expect large interregional volume shifts, but noted it had only two weeks of data and needed more time to assess.
Sreekanth Reddy: "Our experience from past 1, 1.5 decades, especially on this price to volume, there has never been a correlation."
Margins & Costs
- H1 to H2 margin bridge: Q2 EBITDA margin recovered to 10% from ~1% in Q2 FY23 and ~6% in Q1 FY24, driven by higher volumes, better realisations, and the end of the Mattampally maintenance shutdown. H2 EBITDA per ton is guided at ₹800–₹850 on a conservative basis.
- Operating leverage quantified: The jump from ~0.25 crore tons in H1 to 0.37–0.38 crore tons in H2 is expected to deliver ₹100–₹150/ton of cost reduction, with the balance of margin improvement coming from realisation increases.
- Fuel costs flat but watched: Power and fuel cost fell to ₹1,626/ton from ₹2,062/ton in Q2 FY23; pet coke and coal prices have returned to $140–$150 and inventory covers through mid-Q4, but Middle East geopolitical risk is being tracked.
- Freight cost rose: Freight cost per ton increased to ₹848 from ₹797 in Q2 FY23, a headwind that the operating leverage and realisation gains must absorb.
- Standalone margin anomaly: Mattampally’s standalone margin was depressed by a once-in-15-years deep maintenance shutdown; Andhra Cements’ margin was flattered by a one-off clinker sale that management could not cleanly split between clinker and cement EBITDA, deferring the breakdown.
Sreekanth Reddy: "We are talking of around ₹800 to ₹850 on a very conservative scale. Given the operating leverages that we have and the current fuel price trends, which we believe current fuel prices might remain more or less flat in our case, we are looking at around getting ₹800 only per ton on an average for ourselves."
Pricing & Realisations
- Price hike landed, but insufficient: The recent price increase takes the industry from low single-digit EBITDA margins to roughly 15%, but management believes 18%+ is the threshold for sustainable stakeholder returns, requiring a further 2%–3% gross price increase.
- Sustainability uncertain: Two weeks into the increase, prices are expected to hold in their present shape, but they are not at the highest levels seen historically, and management stopped short of calling the floor durable.
- Realisation contribution to H2 margin: Management did not split the H2 margin improvement precisely between cost and realisation, but confirmed that operating leverage contributes ₹100–₹150/ton and the rest must come from better pricing.
Sreekanth Reddy: "This price increase just manages most of the cost from small single-digit EBITDA margin, I think we'd be reaching to 15%. But the real requirement is up of 18%, EBITDA requirement for all of us to survive and service the stakeholders."
Plant-Level Performance & Ramp-Up
- Jajpur and Jeerabad at breakeven: Jajpur achieved EBITDA breakeven during the middle of last quarter; Jeerabad is already more than breakeven and running at 80% utilisation.
- Dhar utilisation strong: Dhar is operating at 85% capacity utilisation with a very good run-rate, though the last couple of months have seen seasonal softening.
- Andhra Cements early-stage ramp: Andhra Cements operated at roughly 40% cement utilisation in Q2, with clinker utilisation higher; a forced shutdown was taken in September because excess clinker inventory could not be handled. Current-year volume outlook is 0.08 crore tons, doubling to 0.12–0.15 crore tons next year.
- Next-year volume drivers: Total volume next year around 0.75 crore tons on the higher side; existing assets are modelled for only 2.5%–3% growth given single-digit demand and small new supplies entering regions, so Andhra and Jajpur must deliver the incremental volume.
- Jeerabad second-half target: Jeerabad is expected to do 0.05 crore tons in H2, slightly more than H1, with the combined Jeerabad-plus-Dachepalli H2 contribution pegged at 0.10–0.11 crore tons.
Expansion, CapEx & Regulatory
- Three-plant expansion awaiting clearance: Plans to add capacity at Andhra (0.75 crore tons), Gudipadu (0.25 crore tons) and Jeerabad (0.50 crore tons) are pending investment committee approval, expected within 15 days; the target is 1.2 crore MT total capacity by end-FY25.
- Near-term CapEx limited: Only maintenance CapEx, estimated at roughly ₹50 crore per year on the current 1.2 crore ton base, is committed for the next six months; expansion CapEx will start with advances consuming only 10%–15% of the total in the initial quarter if approved.
- Andhra Cements dilution plan: Sagar must reduce its stake in Andhra Cements from 95% to 90% by April 2024 and to 75% within three years; management prefers a capital increase at Andhra Cements rather than selling Sagar shares, to fund CapEx while keeping leverage in check. Work on the first step will begin in the next 1–1.5 months.
- Andhra Phase 2 shutdown manageable: Building a new clinker line in parallel means only a ~30-day shutdown is expected roughly 15 months from now, which can be managed with inventory rather than disrupting dispatches, though it may create a cost impact at that time.
- Vizag land sale progressing slowly: Only one of four steps completed in an 18-month timeline; three months have elapsed; management believes a transaction can be concluded within the coming 15 months but declined to give a market value range, citing work-in-progress. The ready reckoner remains at ₹4 crore per acre.
Sreekanth Reddy: "I think on the debt, we would remain committed to not crossing on the gross side at ₹1,500 crore, and on the net side, somewhere around ₹1,250 crores to ₹1,300 crore, we would not cross those numbers either way. We are committed to keep that number stay there even with the growth plans."
Incentives & Strategic Items
- Madhya Pradesh incentive sanctioned: The MP government approved a ₹150 crore incentive (40% of certified CapEx, capped) to be paid over seven years at ~₹21.5 crore per year; it will flow through the P&L on receipt, not accrual, and is conditional on 70% capacity utilisation.
- Legacy incentive receivables: Andhra and Telangana governments owe ₹75–₹80 crore in incentives that have been due for over a decade; management will not book them until received.
- Green share held steady: Green power share remained close to last quarter’s 27% despite the Mattampally shutdown, because most inventory was used during the maintenance period.
- Strategic cost initiatives: Increasing green power share, electric trucks and wheel loaders, and higher alternative fuel usage are expected to rationalise operating costs over the medium to long term.
- AvH shareholders agreement: A formal shareholders agreement is being entered into with AvH Resources, a ~19.8% shareholder for over 15 years, providing for nominee director appointment rights similar to the previous Premji agreement.
Sreekanth Reddy: "We are also very happy to announce that the Madhya Pradesh government approved the incentives. So it was 40% of the certified CapEx, which should have been ₹150 crore whichever is lower. So it should have been ₹180 crores. But since the cap is at ₹150 crore, so we got a sanction for ₹150 crores incentive to be paid over seven years."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY24 volume | 0.62 crore MT (Q3: 0.18 cr, Q4: 0.20 cr) | FY24 |
| H2 EBITDA per ton | ₹800–₹850 on conservative basis | H2 FY24 |
| Full-year EBITDA | ~₹400 crore achievable | FY24 |
| Gross debt ceiling | Not to exceed ₹1,500 crore | Ongoing, even with growth plans |
| Net debt ceiling | Not to exceed ₹1,250–₹1,300 crore | Ongoing, even with growth plans |
| Capacity target | 1.2 crore MT | End-FY25, subject to investment committee approval within 15 days |
| Andhra Cements stake reduction | Reduce from 95% to 90% | Before April 2024 |
| Andhra Cements stake reduction | Reduce to 75% | Within three years |
| Andhra Cements next-year volume | 0.12–0.15 crore tons | FY25 |
| Jajpur utilisation | 40% | FY24 |
| Vizag land sale | Transaction concluded | Within coming 15 months |
| MP incentive recognition | ₹21.5 crore/year through P&L on receipt, conditional on 70% utilisation | Over seven years from sanction |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Revenue | ₹587 cr, +24% YoY and +9% QoQ |
| EBITDA | ₹60 cr, +955% YoY and +97% QoQ |
| EBITDA margin | 10%, vs ~1% in Q2 FY23 and ~6% in Q1 FY24 |
| Loss after tax | ₹11 cr, vs loss of ₹44 cr in Q2 FY23 |
| Average power and fuel cost | ₹1,626 per ton, vs ₹2,062 per ton in Q2 FY23 |
| Freight cost | ₹848 per ton, vs ₹797 per ton in Q2 FY23 |
| Volume guidance FY24 | 0.62 crore MT, revised from 0.64 crore MT |
| H2 EBITDA per ton target | ₹800 to ₹850, conservative estimate |
| Full-year EBITDA target | ~₹400 cr |
| Gross debt | ₹1,533 cr, long-term debt ₹1,305 cr, rest working capital |
| Net worth | ₹1,628 cr |
| Debt-to-equity ratio | 0.80:1 |
| Cash and bank balances | ₹152 cr |
| Consolidated clinker utilisation | ~65% at group level |
| Trade sales share | ~65% |
| Green power share | ~27%, close to Q1 FY24 level |
| Plant utilisation: Mattampally | 62% |
| Plant utilisation: Gudipadu | 87% |
| Plant utilisation: Bayyavaram | 60% |
| Plant utilisation: Jeerabad | 65% |
| Plant utilisation: Jajpur | 26% |
| Plant utilisation: Dachepalli | 22% |
| Jajpur capacity utilisation (current) | near 50% |
| Dhar capacity utilisation | up of 85% |
| MP government incentive sanctioned | ₹150 cr, to be paid over seven years at ~₹21.5 cr per year |
| Andhra Cements FY24 volume target | 0.08 crore MT |
| Andhra Cements FY25 volume target | 0.12 crore to 0.15 crore MT |
| Next year total volume expectation | ~0.75 crore MT on the higher side |
| Maintenance capex at 1.2 crore MT capacity | ₹50 cr per year on average |
| H1 capex | ~₹130 cr |
| Gross debt ceiling commitment | ₹1,500 cr |
| Net debt ceiling commitment | ₹1,250 cr to ₹1,300 cr |
| Price increase: Hyderabad | +₹35 per bag from mid-October |
| Price increase: Vizag | +₹35 to ₹45 per bag |
| Price increase: Bangalore | +₹20 to ₹25 per bag |
| Price increase: Chennai | +₹40 to ₹45 per bag |
| Price increase: Sholapur | +₹20 per bag |
| Price increase: East | +₹30 per bag from September, additional ₹5 in October |
| Price increase: Indore | +₹15 per bag |
| South demand growth H1 FY24 | 12% to 13% |
| South demand growth FY24 expectation | very high single digit to very low double digit |
| Odisha demand growth expectation | high single digit |
| MP demand growth expectation | single digit, recalibrated from double digit |
| Andhra Cements promoter holding | 95%, must reduce to 90% by April 2024 and 75% within three years |
| Andhra and Telangana incentive receivables | ₹75 cr to ₹80 cr, due for more than a decade |