Key Takeaways
- Volume-led recovery, price lagging: 8% YoY volume growth and a raised FY26 target of 0.6 crore tonnes signal demand is returning, but price hikes are modest and Q4 carries a risk of year-end pressure.
- Andhra Cements nears breakeven: The new 6-stage preheater slashed fuel consumption from 850–880 Kcal to 720 Kcal, pulling the unit very close to breakeven in Q3; profitability is possible in Q4 if prices cooperate.
- Vizag land monetisation is an 18-month catalyst: One policy step remains; management expects to fully monetise the land over the next 18 months, with the bulk of proceeds earmarked for debt retirement.
- Cost tailwinds are structural but uneven: Power and fuel costs fell YoY, and new WHRS plus grinding capacity will add ₹100–₹200 per tonne in savings, though Andhra Cements still carries a higher landed fuel cost versus Mattampally.
- What to watch next quarter: Whether Andhra Cements actually breaks even or turns profitable, the realised extent of the ₹500–₹550 Q4 EBITDA per tonne target, and any concrete progress on the final Vizag land policy step.
Demand & Pricing
- Subdued start, late pickup: Demand was weak in the first half of Q3 due to extended monsoons and the festive season, but strengthened later; that momentum has continued into Q4. [2–3]
- Volume target raised: FY26 volume guidance moved up to 0.6 crore tonnes from 0.58 crore tonnes, implying ~9% YoY growth; FY27 outlook of 0.7 crore tonnes was maintained. [4–5]
- Price hikes are partial and fragile: Non-trade prices rose ₹15–20 from end-December and trade prices added ₹5–10 in January across south states, while Madhya Pradesh saw a ~₹10 increase at end-November. Management has pencilled in only part of the expected hikes for Q4, citing potential year-end pricing pressure in March.
Sreekanth Reddy: "We are looking at ₹ 500 to ₹ 550 because we did factor some amount of price hike, but not the full one, what probably is expected to because March is going to be end of the year, so there could be some kind of pricing pressure that has been pencilled in internally."
Andhra Cements Turnaround
- Step-change in fuel efficiency: The newly commissioned 6-stage preheater at Dachepalli reduced specific fuel consumption from 850–880 Kcal to 720 Kcal, and electrical units from 60–62 to 51, exceeding initial expectations.
- Near breakeven in Q3: The unit was very close to breakeven during the quarter; management expects it to break even in Q4 and potentially turn profitable if prices improve.
- Cost gap versus Mattampally persists: Andhra Cements still has a higher landed cost of fuels and energy because Mattampally sources ~90% of its power from green sources, while Andhra has only a 6 MW solar plant. On specific consumption metrics, however, Andhra is already better than Mattampally.
Sreekanth Reddy: "From 850 to 880 Kcal, yeah, we could straight away reduce it to ₹ 720. So that's the revenue translation. And from 60, 62 units up to clinker, we are already at 51 units. So with the CapEx and successful commissioning, yeah, we could achieve much more than what we initially thought we would achieve from there."
Costs & Fuel Mix
- Power and fuel costs declined YoY: Per-tonne cost fell to ₹1,408 from ₹1,456 a year ago; freight costs were marginally lower at ₹830 versus ₹835.
- Fuel mix shift explains the quarterly uptick: A 15% sequential increase in fuel cost was driven by a transition from pet coke to domestic and imported coal, partly because the ₹400 coal cess made those fuels cheaper than pet coke. The product mix at 55% OPC also makes costs appear higher relative to peers.
- Coal cess impact staggered: The benefit is flowing through at roughly ₹50–₹55 per tonne each quarter; the full-year impact should be visible by year-end.
- Inventory policy tightened: The company previously held two quarters of fuel inventory and has now reduced that to one quarter ahead.
- No further fuel cost increase this year: Management expects no major fuel price increase for the remainder of FY26; for FY27, a 2%–3% increase is pencilled in, with better confirmation expected by end of this quarter.
- Domestic coal pricing rebased: Domestic coal cost moved from ₹1.26 (as-fired) in Q2 to ₹1.72 in Q3 due to firing more Singareni coal at Mattampally and domestic coal at Jeerabad; management stated prior quarters are "all realigned with as fired basis."
Capacity Expansion & Cost Savings Pipeline
- Jeerabad grinding expansion: Capacity rising from 0.1 crore to 0.15 crore tonnes, expected to commission in early Q1 FY27; should save a minimum of ₹150–₹200 per tonne on fixed costs.
- WHRS at Gudipadu: A 4.35 MW waste heat recovery system is expected by end of FY26, saving ₹100–₹125 per tonne.
- Cement capacity at Dachepalli: Additional grinding capacity expected by August 2026, with half-year availability in FY27; saving estimated at ₹25–₹50 per tonne.
- Medium-term capacity target: Management aims to grow from 1.2 crore to 1.5 crore tonnes; CapEx for that phase should begin around end of FY28 to early FY29.
- No large CapEx for 2.5–3 years: Beyond the ongoing projects concluding by end of next year or mid-next year, only maintenance CapEx is planned, freeing cash flows for debt reduction.
Balance Sheet & Capital Allocation
- Vizag land monetisation is the deleveraging catalyst: Only one step remains, waiting for a final government policy specific to Andhra. Management expects to fully monetise the land over the next 18 months, split into 5–6 tranches because the Vizag market cannot absorb a single large lot. The bulk of proceeds is expected over the next 18 months, with nothing in FY26.
- Proceeds earmarked for debt retirement: With no large CapEx planned for the next 2–3 years, most of the land sale money will be used to retire debt. Ongoing CapEx concluding will provide additional cash flows for the same purpose.
- Depreciation increased: The spike is attributable to capitalisation of recently concluded CapEx.
- No incentives accrued in Q3: Incentives were received in Q1 and Q2; nothing was due for Q3 and nothing is due for the coming quarter.
Sreekanth Reddy: "Our plan is to have a balanced and optimised debt. So for the next two to three years, we do not have large CapEx plans. So most of the money should be utilised to retire the debt."
M&A & Industry
- M&A activity muted: Management noted no major intensity in M&A activity over the last six months and assumes a similar environment for the next few quarters. When asked about south-based opportunities, management declined to speculate, stating it had nothing to add beyond what is already in the public domain.
Sreekanth Reddy: "I have absolutely no idea about the activity about M&A because most of these M&A are very specific between a buyer and a seller. I think it's in public domain. I have nothing to add on what is already in the public domain."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY26 volume | 0.6 crore tonnes (revised up from 0.58 crore tonnes) | FY26 full year [4–5] |
| FY27 volume | 0.7 crore tonnes | FY27 |
| Q4 FY26 EBITDA per tonne | ₹500–₹550 (not fully factoring all expected price hikes) | Q4 FY26 |
| Full-year FY26 EBITDA per tonne | ₹500–₹525 including incentives | FY26 [5–6] |
| Andhra Cements breakeven | Break even in Q4; potentially profitable with better prices | Q4 FY26 |
| Vizag land monetisation | Fully monetised; bulk of proceeds received | Over next 18 months |
| Jeerabad grinding expansion | Commissioned; saving ₹150–₹200 per tonne on fixed cost | Early Q1 FY27 |
| WHRS at Gudipadu | Commissioned; saving ₹100–₹125 per tonne | End of FY26 |
| Dachepalli cement capacity | Commissioned; saving ₹25–₹50 per tonne | August 2026 |
| Next capacity expansion phase | CapEx start for 1.2 to 1.5 crore tonne expansion | End of FY28 to early FY29 |
| Fuel cost (FY27) | 2%–3% increase expected; better confirmation | End of current quarter |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | ₹591 cr, +5% YoY |
| Volume growth | 8% YoY |
| EBITDA | ₹38 cr, flat YoY |
| EBITDA per tonne | ₹254 |
| Loss after tax | ₹64 cr |
| Power and fuel cost per tonne | ₹1,408, down from ₹1,456 in Q3 FY25 |
| Freight cost per tonne | ₹830, down from ₹835 in Q3 FY25 |
| Full-year FY26 EBITDA per tonne guidance | ₹500 to ₹525, including incentives |
| Q4 FY26 EBITDA per tonne target | ~₹550 |
| FY26 volume guidance | ~0.6 cr tonnes |
| FY27 volume outlook | 0.7 cr tonnes |
| Gross debt | ₹1,627 cr as of 31 Dec 2025, long-term debt ₹1,320 cr |
| Net worth (consolidated) | ₹1,694 cr as of 31 Dec 2025 |
| Debt-to-equity ratio | 0.78:1 |
| Cash and bank balances | ₹83 cr as of 31 Dec 2025 |
| Net debt expected by end of FY26 | ~₹1,450 cr |
| Plant utilisation – Mattampally | 57% |
| Plant utilisation – Gudipadu | 82% |
| Plant utilisation – Bayyavaram | 66% |
| Plant utilisation – Jeerabad | 95% |
| Plant utilisation – Jajpur | 40% |
| Plant utilisation – Dachepalli | 39% |
| State mix – Telangana | 28% of sales |
| State mix – Andhra Pradesh | 28% of sales |
| State mix – Odisha | 10% of sales |
| State mix – Maharashtra | 9% of sales |
| State mix – Madhya Pradesh | 8% of sales |
| State mix – Karnataka | 7% of sales |
| State mix – Tamil Nadu | 6% of sales |
| State mix – Gujarat | 3% of sales |
| Product mix – OPC | 55% OPC, 45% blended |
| Non-trade price increase (Jan) | ₹15 to ₹20 per bag across south states |
| Trade price increase realised (Jan) | ₹5 to ₹10 per bag across south states |
| Madhya Pradesh price increase (end-Nov) | ~₹10 per bag, mostly non-trade |
| Andhra Cements expected cost reduction | ~₹250 per tonne YoY |
| Mattampally specific power consumption | 725 to 730 Kcal per kg of clinker |
| Andhra Cements specific power consumption | sub 720 Kcal per kg of clinker |
| Vizag land monetisation expected net proceeds | ~₹350 cr net of expenses, over next 18 months |
| FY26 total CapEx budgeted | ₹489 cr, ₹303 cr spent in 9M, ₹186 cr budgeted for Q4 |
| FY27 CapEx budgeted | ₹291 cr |
| WHRS at Gudipadu expected saving | ₹100 to ₹125 per tonne on clinkerisation |
| Jeerabad grinding mill expected fixed cost saving | ₹150 to ₹200 per tonne minimum |
| Andhra grinding plant expected saving | ₹25 to ₹50 per tonne, commissioning by Aug 2026 |
| Expected fuel price increase for FY27 | 2% to 3% |