Key Takeaways
- Weather-hit quarter, recovery promised: India operations lost ~30,000 tons soda ash and ~40,000 tons salt to heavy rains, driving a ₹90 crore EBITDA drop. Management expects a much steadier H2 as expansion capacities stabilize and lost minor-product volumes are recouped.
- Pricing has found a floor: Management stated unequivocally that pricing across markets "has bottomed out" and "can't get worse from here," even as China demand shows early signs of moderation.
- The growth bet is on capacity, not price: ~0.1 crore tons of new soda ash capacity is moving through approvals and execution across India, the U.S., and Kenya over the next 30–36 months, plus 60,000 tons of tire-grade silica.
- UK remains a drag with a timeline: Negative spark spreads pushed the UK business into the red; management is "hopeful" of exiting the problem by the end of Q3.
- What to watch next quarter: Whether India throughput from new capacity becomes visible, the pace of UK spark-spread recovery, and any signal from the DGTR anti-dumping investigation on soda ash imports.
India Operations: The Weather Hole and the Recovery Path
- The rain damage: Heavy rains disrupted operations for ~10 days, costing ~30,000 tons of soda ash and ~40,000 tons of salt in lost production. Plant instability added a ₹40 crore cost impact, split between ₹25 crore in higher operating costs and a ₹15 crore insurance charge.
- The EBITDA bridge: The ₹90 crore QoQ decline in India EBITDA broke down into weather-related costs (₹40 crore), lower volume (₹7 crore), and a ₹21 crore hit on minor products. Management expects the minor-product impact to be fully made up later in the year.
- Expansion capacities now live: The boiler, soda ash, and bicarb expansions all came on stream in September and operations have stabilized. Throughput from these capacities should become visible from Q3 onward.
- Cost recovery underway: Management expects ₹1,500 per ton to recover, though a ₹500 per ton higher cost will persist for the next two quarters. New capacity placement is expected by the end of this quarter or early next, with no demand-side issues anticipated in India.
- Pharma salt milestone: The pharma salt plant was commissioned in October; first salt has been produced and will be delivered to the technical market while customer qualification proceeds during the current quarter.
Mukundan: "We all pay homage to him in this quarter and the best way of paying homage to him would be to deliver the outcomes which we have all spoken about."
Global Soda Ash: Pricing Floor, Shifting Demand
- Pricing has bottomed out: Management's central call is that pricing across all markets has reached a floor, with exports moving at or below cost. The view is that it "can't get worse from here," though the call was not accompanied by a demand-recovery forecast.
- China demand moderating: Demand was strong through August–September but showed some moderation as of October. New domestic capacity in China may reduce the room for imports, though management noted that higher demand was being met by U.S.-to-China imports in the recent period.
- Container glass soft, solar glass strong: Container glass demand is down in the U.S. and most markets, with Southern Europe the exception on higher beverage exports. Solar glass demand remains robust worldwide, offsetting softness in container and lithium markets.
- Lithium market softness: The lithium end-market remains weak, noted alongside container glass as a drag that solar glass is partly compensating for.
- Anti-dumping investigation: The DGTR has initiated a suo-moto investigation on soda ash imports from Iran, Russia, and other countries. Management will submit data and expressed hope that "unreasonable pricing" at or below cost will be addressed with safeguards, but declined to hazard any outcome.
Mukundan: "Our view is that the pricing, at least going forward, has bottomed out. So, it can't get worse from here."
International Operations: U.S. Strength, UK Wobble
- U.S. volumes robust: Both domestic and export markets were strong. A planned shutdown was postponed from September to October, and production is running better than in the past, a trend management expects to continue. One shutdown is expected this quarter and next.
- U.S. margins improved: Margins rose QoQ as production ran at peak load, lowering effective operating costs. Management expects overall U.S. volumes to finish ahead of last year.
- UK in the red: Lower volumes were partly offset by slightly better pricing, but the bottom line stayed negative because of negative spark spreads. High wind energy being wheeled into the grid at challenged margins was the root cause.
- Kenya higher on both counts: The Kenya business delivered higher volume and higher prices in the quarter.
- Rallis performing well: An above-normal monsoon supported double-digit growth in the domestic market, and positive momentum is expected to continue.
Mukundan: "Yes, UK had a bit of a wobble this quarter mainly because of negative spark spreads… we are hopeful that by the time we finish the third quarter, we should be out of this problem."
Capacity Expansion: The ~0.1 crore Ton Build-Out
- The aggregate picture: Approximately 0.1 crore tons of new soda ash capacity is planned across India, the U.S., and Kenya over roughly 30–36 months. Management framed the bulk of the opportunity as lying in natural soda ash in the U.S. and synthetic in India.
- India next phase: The next phase of soda ash expansion (0.03 crore tons of soda ash plus 230,000 tons of salt) is going for formal approval; no specific date was given.
- U.S. expansion on schedule: The 400,000-ton expansion is progressing, with regulatory clearances expected by March next year. Design engineering and logistics and input tie-ups are already underway.
- Kenya electric calcination: The 300,000-ton Kenya expansion will use electric calcination for lower carbon intensity. Implementation is modular: testing first, then full expansion over ~36 months.
- Silica pivot to tire-grade: The food-grade silica line has been shut down to convert it entirely to tire-grade silica. A 60,000-ton expansion will get formal approval this quarter, with the first 20,000-ton module in ~24 months and each subsequent module six months apart, reaching full capacity in 36 months. Approximately 80% of the contribution is expected to flow to the bottom line.
- Long-term demand thesis: Management tied the positive long-term soda ash outlook to the sustainability theme, arguing that customers will increasingly demand lower-carbon soda ash, which plays to the Kenya electric-calcination and U.S. natural-ash expansions.
Pushback & Unanswered
- U.S. contract pricing: An analyst asked about annual contract discussions and export pricing. Management declined to give specifics, saying only "let them settle… I would not want to say anything more."
- Global capacity rationalization: Asked about deferments or rationalization by major producers, management gave a general answer citing a ~100,000-ton pullback in the U.S. and a ~100,000-ton addition elsewhere, but did not name specific producers or confirm any formal rationalization moves.
- China capacity risk: An analyst pressed on the impact of further Chinese capacity increases on pricing. Management reiterated that pricing has bottomed out and exports are at or below cost, but did not directly address the scenario of additional capacity creating further downside.
- Mongolia capacity: Asked about quality issues and utilization at the Mongolia capacity, management answered that China imports would moderate when that capacity stabilizes, but provided no specific utilization numbers or confirmation of whether quality issues persist.
- Net debt maturities: An analyst asked about net debt maturity for the current year. Management answered "not much" and deferred to 2026 and 2027, without providing a specific figure for current-year maturities.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| India volume recovery | Throughput from new expansion capacities becomes visible; H2 "much steadier" than weather-hit H1 | From Q3 onward |
| India cost recovery | ₹1,500 per ton to recover; ₹500 per ton higher cost persists for two quarters | Next two quarters |
| New India capacity placement | Product placed in market with no demand-side issues expected | End of this quarter or early next |
| UK spark-spread exit | Out of negative spark spread problem | By end of Q3 |
| U.S. expansion regulatory clearance | Clearances received, execution begins | By March next year |
| Silica expansion first module | 20,000-ton stream operational | ~24 months from formal approval (this quarter) |
| Silica expansion full capacity | Full 60,000 tons operational | ~36 months from formal approval |
| Kenya expansion full capacity | 300,000 tons via electric calcination | ~36 months |
| U.S. full-year volumes | Ahead of last year in overall volume | FY25 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Revenue | Up 6% sequentially, driven by higher U.S. volumes |
| India EBITDA decline QoQ | ~₹90 cr, comprising ₹7 cr from lower volumes, ₹37 cr from cost, and ₹21 cr from other minor products |
| Weather-related cost impact (India) | ~₹40 cr, of which ₹25 cr from unstable operations and ₹15 cr from insurance claim charged to EBITDA |
| India volume loss (weather) | ~30,000 tons of soda ash and ~40,000 tons of salt |
| Additional cost per ton (India) | ~₹2,000, with ₹1,500 expected to recover and ₹500 to persist for two quarters |
| Net debt | ₹5,190 cr, up ₹843 cr YoY |
| Soda ash pricing outlook | Bottomed out across markets; no headroom for further reduction |
| India expansion capacity | 2.25 lakh tons soda ash, 140,000 tons bicarb, and salt, fully ramped up as of October |
| U.S. expansion plan | 400,000 tons, regulatory clearances expected by March 2025 |
| Kenya expansion plan | 300,000 tons, modular electric calcination, over ~36 months |
| Total capacity expansion pipeline | ~0.1 crore tons across India, U.S., and Kenya, over 30–36 months |
| Silica expansion plan | 60,000 tons (three 20,000-ton modules), run rate revenue of ~₹500 cr, execution over 24–36 months |
| Next phase India soda ash expansion | 0.316 MT soda ash and 2.3 lakh tons salt |
| Freight and forwarding charges | Almost flat sequentially |