Key Takeaways
- Revenue nearly doubled, PAT surged 16x: Revenue grew 94% YoY to INR1,110 crores and PAT hit INR129 crores, driven by a 189% volume jump and strong capacity utilization.
- Order book swelled 36% to 11.15 GW: The mix shifted decisively toward higher-margin C&I and distribution segments, which now make up a third of the book, up from 10%.
- A massive capacity build is underway: Module capacity will hit 15.5 GW by fiscal year-end, and a 12 GW cell plant is on track, promising 75% backward integration by end of next fiscal.
- Margins held steady despite price softness: EBITDA margin stayed near 21% as a 4-5% QoQ price decline was offset by corresponding cost reductions and cost pass-through mechanisms.
- What to watch next quarter: The on-time commissioning of the 5 GW Vallam module facility, any clarity on the anti-dumping duty’s final scope and pass-through mechanics, and the company’s ability to convert its 38 GW active pipeline into firm orders.
Demand & Order Book
- Volume explosion: Sales volume hit 784 MW for the quarter, a 189% YoY increase, with half-year module sales reaching 1,548 MW. Effective capacity utilization stood at 84% for the quarter.
- Order book transformation: The 11.15 GW order book is not just larger but structurally different. The C&I segment surged from 4% to 20% of the book, and distribution from 6% to 13%, reflecting a strategic pivot toward higher-margin, non-IPP customers.
- Demand runway is long and multi-sourced: A 104 GW pipeline of already-tendered projects is expected to materialize over the next 24 to 36 months, while an additional 40-50 GW of demand from green hydrogen/ammonia and a data centre-led C&I boom remain outside the formal tendering pipeline.
- PM Surya Ghar/KUSUM underperformance is a supply problem, not a demand one: The programs require DCR modules, and the bottleneck is domestic cell availability, not a lack of end-customer appetite.
Rinal Shah: "There is a green hydrogen and green ammonia-led of 40-50 gigawatt of additional solar demand that will come in. There is a data centre-led demand that will come in, which will blow up the C&I portion and will not show up in your tendering process."
Capacity Expansion & Execution
- Vallam commissioning is imminent: The 5 GW module facility in Tamil Nadu will commission this quarter, with two 2.5 GW lines expected in November and the balance in December, taking total module capacity from 4.5 GW to 9.5 GW.
- Gangaikondan is the next leap: A greenfield 6 GW module and 12 GW cell project is underway on 186 acres. Module lines are planned for Q4 FY26, while the cell facility will be built in two phases: a 3 GW Phase 1 (part of the IPO object) by Q3 next fiscal, and a 9 GW Phase 2 by Q4 next fiscal.
- Installed module capacity will hit 15.5 GW by fiscal year-end, and the company expects to achieve 75% backward integration into cells by the end of the following fiscal year, unlocking the DCR market.
- Execution team is being institutionalized: Deloitte has been engaged for project management, L&T for civil works, KIDE as design engineer, and URECO (a veteran Taiwanese cell manufacturer) as owner’s engineer. Dr. C. V. Kannan, a material sciences PhD with two decades in PV manufacturing, has been appointed Head of Manufacturing Operations for the Gangaikondan project.
- Capex math is back-end loaded: Total capex for Vallam and Gangaikondan is INR6,100-6,200 crores, funded by INR3,500 crores of debt, INR1,500 crores of equity, and INR1,200 crores from internal accruals. Only INR200 crores had been spent by September 30, with INR800 crores expected by fiscal year-end and the bulk (~INR5,200 crores) hitting in FY27. Management targets a debt-to-equity ratio below 1 at the completion of all capex by March 2027.
- Imported cell lines lower the cost base: The 9 GW cell lines being imported from Thailand cost roughly 40% of the industry thumb rule of INR600-800 crores per GW, which is why the overall capex figure appears low for a 12 GW cell facility. Management states due diligence on the lines’ health and upgrade path within N-type technology has been completed.
Rinal Shah: "Before committing capital to acquiring an asset of this scale, the company has done its due diligence, enrobed the experts that assess the health of the asset, check the logs of utilization clocked for the limited period that the lines have run and also its usability for the coming five to seven years, how it will stand, how it will seamlessly upgrade to the upcoming technology within the N-Type branch."
Margins & Cost Structure
- Margin resilience in a falling price environment: EBITDA margin was virtually flat QoQ (21.48% to 21.12%) despite a 4-5% sequential price decline, because raw material costs fell in tandem. Overall cost remains in the INR10.5-11 per watt peak range, with fixed costs at just 5-6% of the total.
- Cost pass-through is a structural shield: Most MSAs include a cell cost pass-through clause, and management stated there have been no instances where it could not be exercised. The anti-dumping duty, if imposed, is also covered under change-in-law clauses, though the company did not clarify whether the pass-through is full or partial.
- BORM is the absorption risk: Unlike cell costs, any increase or additional levy on Balance of Raw Materials (BORM) must be absorbed and is not always a pass-through.
- Finance costs are falling fast: Weighted average cost of debt dropped from 9.75% in FY25 to about 7% in H1 FY26, and a INR88 crore term loan prepaid in September will further reduce H2 costs. H1 finance cost was INR60-65 crores versus INR150+ crores for all of FY25.
- Management declined to quantify margin expansion from backward integration, calling any guidance on the topic premature.
Ranjan Jindal: "the MSA signed by us do have the cost -- the cell cost pass-through majorly, and also with the levies on account of taxation. So, we could also see that the last two quarters, with the current pricing, we were able to deliver an EBITDA of 21%. So, going forward, in spite of the fact that some pricing pressure is expected, the corresponding increase in scales will help us reduce the cost."
Policy & Regulatory Landscape
- Anti-dumping duty on Chinese cells recommended: The DGTR recommended a 23-30% levy on cells imported from China. Vikram Solar and other companies made representations to the Tax Research Unit citing capacity gaps and cost concerns, so the final scope and rate remain uncertain.
- ALMM-III extends the domestic manufacturing roadmap: A draft order proposes making ALMM mandatory for wafers from June 1, 2028, conditional on at least three independent wafer manufacturers with 15 GW of cumulative capacity being operational. The company is evaluating wafer manufacturing viability but will take a disciplined, phased approach.
- GST cut is a tailwind: The GST Council reduced the rate on renewable energy components, including solar modules, from 12% to 5%, effective September 22, 2025.
- US order book supply chain is being de-risked: The company is exploring alternative supply chains from countries with significant cell capacity that face lower levies than India, and is confident of committing to supplies in the coming quarter.
Rinal Shah: "what happens is there is a country of origin concept for the levy of duties, which means that the tariff will be levied on the country of origin where the cell's PN junction was formed. And hence, as a company, we are exploring alternative supply chains for countries with significant cell capacities that has lesser levies than what India does."
Balance Sheet & Financial Health
- Credit rating upgraded to A+: The upgrade from A reflects steady financial performance, a strong liquidity profile, and prudent leverage management.
- Board strengthened with two independent directors: Mr. J. P. Dua, former CMD of Allahabad Bank, and Mr. Suresh Menon, former Senior Vice President at TCS, joined the board, adding banking and large-scale operations expertise.
- Distribution network is scaling rapidly: The authorized distributor network expanded from 41 to 102 in twelve months, and the dealer network now exceeds 375, supporting the strategic pivot toward the higher-margin distribution segment.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Vallam module facility commissioning | 5 GW total; two 2.5 GW lines in November, balance in December | Current quarter (Q3 FY26) |
| Gangaikondan module facility commissioning | 6 GW | Q4 FY26 |
| Gangaikondan cell facility, Phase 1 | 3 GW | Q3 next fiscal (FY27) |
| Gangaikondan cell facility, Phase 2 | 9 GW | Q4 next fiscal (FY27) |
| Installed module capacity | 15.5 GW | End of FY26 |
| Backward integration into cells | ~75% of module plan | End of next fiscal (FY27) |
| Capex spend | ~INR800 crores cumulative | End of FY26 |
| Total capex outlay | INR6,100-6,200 crores for Vallam + Gangaikondan | Completion by early FY28 |
| Debt-to-equity ratio | Below 1 | At completion of all capex (March 2027) |
| FY27 volume delivery | ~10.5 GW (65% utilization of 15.5 GW capacity) | FY27 |
| US order book supply | Confident of committing to supplies via alternative supply chains | Coming quarter |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹1,110 cr, +94% YoY |
| EBITDA | ₹235 cr, +3x YoY |
| EBITDA margin | 21.1%, improved from 12.59% YoY |
| Profit after tax | ₹129 cr, +16x YoY |
| PAT margin | 11.58%, compared to 1.29% YoY |
| H1 FY26 revenue | ₹2,244 cr, +86% YoY |
| H1 FY26 EBITDA margin | 21.27%, sustained |
| H1 FY26 PAT | ₹262 cr, +9x YoY |
| H1 FY26 EPS | ₹8.02 per share, fully diluted, up from ₹0.95 YoY |
| Order book | 11.15 GW, +36% YoY; 85% domestic, 15% export |
| Order pipeline | ~38 GW, largely domestic |
| Sales volume | 784 MW, +189% YoY |
| H1 FY26 sales volume | 1,548 MW, +159% YoY |
| Effective capacity utilization | 84% for Q2, 87% for H1 |
| Gross debt | ₹80 cr, net debt-free; net worth ₹2,950 cr |
| Weighted average cost of debt | ~7% for H1 FY26, down from 9.75% in FY25 |
| Headcount | 1,920 as of Sep '25, up from 1,557 YoY |
| Credit rating | Upgraded to A+ from A |