Key Takeaways
- Volume collapsed 40% QoQ, but mix saved margins: IPP deferrals and a late ALMM List-II notification drove volumes to 591 MW, yet EBITDA per watt rose 37% to ₹1.71 as high-margin distribution surged to 44% of the mix.
- 1 GW of U.S. orders wiped from the book: The August 6 Section 232 circular made those export orders non-viable, resetting the closing order book to 8.2 GW.
- The cell fab is the entire margin story: Management says captive TOPCon Plus cells will almost double DCR margins once commissioned, with first cell-out expected December 2026.
- H2 volume recovery is promised, not yet proven: Management expects Q3 volume back around 1 GW and H2 substantially higher than H1, citing normalizing offtake, but declined to quantify margins growth.
- What to watch next quarter: Whether Q3 volume actually hits ~1 GW, the pace of C&I DCR order book build post the July notification, and progress on the cell fab toward the December first cell-out milestone.
Volume Shock: What Broke and What Is Recovering
- IPP offtake froze: The primary driver of the 40% QoQ volume decline was IPP customers deferring offtake of existing orders due to land acquisition and evacuation constraints, compounded by monsoon; India ground-mounted additions fell 31% sequentially in the same period.
- C&I decision-making stalled until mid-July: Clarity on the ALMM List-II extension for C&I came only on July 18, delaying customer decisions and pushing C&I offtake into Q3; post-notification, decision-making resumed fast and the company participated, with a 400 MW order book primarily from that segment.
- Distribution provided the floor: Distribution volume rose ~80% QoQ from 145 MW to 259 MW, backed by DCR growth extending from smaller C&I to residential rooftop under PM Surya Ghar; the network expanded to 133 distributors and 750+ dealers and system integrators.
- H1 tells the mix story: H1 FY27 revenue grew 18% YoY to ₹2,641 crores while volume rose only 3% to 1,596 MW; richer channel mix and higher DCR share raised average realization per watt by ~15% over H1 FY26.
- Normalization is underway: Management stated offtake is already normalizing in both IPP and C&I customers, with Q3 volume expected back to around 1 GW, which management called a fair estimate.
Nagpal: "See, this decline in volume we experienced in Q2, we consider it as a temporary decline. It was a combination of different factors, which I outlined in my remarks. We are already seeing that some of those issues have been addressed, and the offtake is normalizing, both in IPP customers and in C&I customers."
Order Book Reset and Composition
- U.S. export orders removed: The U.S. Section 232 circular of August 6 introduced a minimum import price and an additional 15% ad valorem duty with a December 4 enforcement deadline, making 1 GW of U.S. export orders non-viable; closing order book stands at 8.2 GW.
- Conversion visibility: 60% to 70% of the 8.2 GW order book is expected to execute over the next 12 to 18 months.
- DCR share is low but poised to rise: The Q2 order book was primarily non-DCR, with the DCR segment currently limited to channel and PM Surya Ghar due to procured DCR cell quantum and pricing constraints; if no change in C&I DCR exemption regulation, DCR demand from C&I will significantly ramp up next quarter and the order book will show a higher DCR percentage.
- IPP revenue nearly vanished: Only 1% contribution from IPP this quarter because IPPs on the order book had specific land availability and evacuation delays causing deferred offtake.
Nagpal: "The U.S. Section 232 circular of August 6 introduced a minimum import price and an additional 15% ad valorem duty with an enforcement deadline of 4th December. As a result, 1 GW of U.S. export orders, which we were carrying in our order book, is no longer viable. We have removed these orders, and our closing order book stands at 8.2 GW."
Margins: Mix Saved the Quarter, Cells Will Transform the Structure
- EBITDA per watt rose despite volume collapse: EBITDA per watt rose 37% sequentially from ₹1.25 to ₹1.71, driven by the higher-margin distribution segment rising to 44% of volume and high-efficiency product portfolio supporting better realizations across channels.
- Absolute EBITDA fell: PAT declined sequentially because absolute EBITDA fell from ₹126 crores in Q1 to ₹101 crores in Q2 as volume fell about 40%; finance costs fell 13% sequentially to ₹43 crores, and other expenses fell 25% partly because of lower volumes and partly because of the savings from cost optimization and value engineering.
- H1 margin compression reflects industry reality: H1 EBITDA was ₹227 crores against ₹477 crores in H1 FY26, reflecting industry-wide margin pressure from a large buildup of module manufacturing capacity and a narrowing module-only non-DCR market ahead of ALMM List-II transition.
- Four recovery levers identified: (1) mix deepening as distribution scales further; (2) cost optimization across sourcing, logistics, raw material yields, and tighter inventory cycles delivering larger savings as volume grows; (3) capacity utilization, the largest near-term lever, as the 8.2 GW order book and post-July C&I orders convert in H2, spreading fixed costs over a larger base; (4) integration, with progressive backward integration starting with own cells structurally improving margins for FY28.
- Cell margin capture is the structural unlock: Once the cell line is commissioned and ramped up, cells flowing into modules for DCR application will allow capturing cell margin; management stated margins will almost double from present DCR margins of procured cells, with uptick expected from Q1 of FY28.
- H2 margin outlook: EBITDA per watt peak expected to hold at around current levels, with volumes substantially higher than H1 as the order book converts and more penetration into the retail market occurs.
Jindal: "We see four levers for our margin recovery. One, the mix. This has started to deliver and will deepen as distribution scales further. Second, the cost. ... Third, the capacity utilization. This is the largest near-term lever. ... Fourth, the integration. Progressive backward integration, starting with our own cells, will structurally improve margins for FY28."
The Cell Fab and Backward Integration Timeline
- 9 GW TOPCon Plus cell facility on schedule: First cell out expected in December; lines commissioned sequentially over the following three months; project COD in March 2027; full 9 GW line expected operational by Q2 FY28, with production starting much earlier and converting into sales earlier.
- Competitive positioning: TOPCon Plus cells expected to offer efficiency few manufacturers can match at scale; aim to turn technology lead into market share and expand margins as captive cells replace purchased ones.
- Ramp-up risk mitigated: A technical consultant (non-Chinese) has been appointed a layer above the supplier's Chinese technical manpower to ensure that any risk related to the ramp-up is mitigated.
- ALMM List-II enlistment: Inspection planned in Q4 of FY27 once sequential commissioning of lines begins; result takes 30 to 40 days after inspection.
- Wafer and ingot integration: 9 GW wafer and ingot project is board-approved; Phase 1 infrastructure plan underway; intended commissioning mid of FY29, matching ALMM List-III date; move into wafers and ingots will let the company capture value across more of the chain.
- 12 GW plan intact: Overall plan for 12 GW across the entire value chain remains; Phase 1 is 9 GW cell backed by 9 GW wafer ingot; provision for balance 3 GW already made at the same site; updates on balance 3 GW to come at the right time with new technology.
- BESS assembly and cell manufacturing: BESS assembly equipment undergoing factory acceptance tests at OEM premises, to be shipped to Chennai plant this quarter (Q3 FY27); Q4 FY27 will stabilize the assembly plant, roll out the first container, and complete certifications; Q1 FY28 will start commercial operations for 7.5 GWh BESS assembly; 7.5 GWh battery cell manufacturing to go live by 2029, 2030, with commissioning in two phases to add up to 15 GWh.
Jindal: "Things will drastically change in FY28 with captive cells coming in. We will be penetrating into the DCR market more with our own cells. Let's wait and watch."
Capital Allocation and Balance Sheet
- Capex concentrated on the cell project in FY27: Spending for wafer ingot and BESS projects being paced so capital stays concentrated mainly on the cell project in FY27; another ₹3,800 crores planned to be infused in H2, mostly for the cell project.
- FY28 and FY29 spending: Major spending in FY28 towards cell plant capex for about ₹3,800 crores; FY28 and FY29 will see spending for wafer ingot and BESS; serious investment will start from next fiscal to catch up with timelines stipulated by the ministry for ALMM List-III.
- Other current assets spike: Sharp increase from ~₹360 crores to ~₹620 crores due to advances paid for ongoing capex vendors and deposits/advances to DCR suppliers; expected to convert into recovery in Q3 and Q4.
- Safeguard duty resolution: Consultants and advisors are hopeful of closing the ₹150 crores safeguard duty issue sooner; management will keep posted on positive progress.
- Logistics costs: Crude oil affected freight and logistics movement in Q2 to some extent, but inventory from previous quarters meant no production issue; crude has since come down to sub-90 levels, and a fall in overall logistics cost is expected going forward.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cell fab first cell-out | First cell out from 9 GW TOPCon Plus facility | December 2026 |
| Cell fab full commissioning | All lines sequentially commissioned, project COD | March 2027 |
| Cell margin capture begins | Uptick in margins as captive cells flow into DCR modules | FY28 |
| Full cell line operational | 9 GW cell line fully ramped | Q2 FY28 |
| BESS assembly commercial operations | 7.5 GWh BESS assembly plant starts commercial ops | Q1 FY28 |
| Wafer ingot commissioning | 9 GW wafer and ingot facility commissioned | Mid FY29 |
| BESS cell manufacturing | 7.5 GWh battery cell manufacturing live, commissioning in two phases to 15 GWh | 2029–2030 |
| Order book conversion | 60%–70% of 8.2 GW order book executed | Next 12–18 months |
| H2 EBITDA per watt | Peak maintained at around Q2 levels (₹1.71) | H2 FY27 |
| H2 volumes | Substantially higher than H1 | H2 FY27 |
| Q3 volume | Back to around 1 GW (fair estimate) | Q3 FY27 |
| H2 capex | ₹3,800 crores infused, mostly for cell project | H2 FY27 |
| FY28 capex | ~₹3,800 crores towards cell plant capex | FY28 |
| ALMM List-II enlistment inspection | Inspection at cell fab, result 30–40 days after | Q4 FY27 |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹1,077 crores, down 40% sequentially on lower volumes |
| EBITDA | ₹101 crores, down from ₹126 crores in Q1 FY27 |
| EBITDA margin | 9.4%, compared to 12.8% in Q1 FY27 |
| Profit after tax | ₹6 crores |
| EBITDA per watt | ₹1.71, up 37% sequentially from ₹1.25 per watt in Q1 |
| H1 FY27 revenue | ₹2,641 crores, up 18% YoY |
| H1 FY27 EBITDA | ₹227 crores, compared to ₹477 crores in H1 FY26 |
| Volume sold | 591 MW, down ~40% sequentially |
| Distribution volume | 259 MW, up ~80% from 145 MW in Q1; 44% of total volume |
| DCR volume growth | 71% QoQ |
| Order inflow | 1.7 GW, more than double the previous quarter |
| Closing order book | 8.2 GW, after removing 1 GW of unviable U.S. export orders |
| Order book execution visibility | 60%–70% over the next 12–18 months |
| Gross debt | ₹632 crores |
| Net debt-to-equity ratio | 0.17 |
| Distribution network | 133 distributors, up from 119 last quarter; 750+ dealers and system integrators |