Key Takeaways
- Record year, record quarter: FY26 revenue hit INR 4,800 cr (up 40% YoY) on 3.3 GW of volumes, and Q4 alone delivered the highest-ever quarterly production, bookings, and revenue.
- Margins expanded with scale: EBITDA margin widened 500 bps to 19% for the full year as operating leverage kicked in, though Q4 saw a slight sequential dent from raw material cost movements.
- The DCR pivot is reshaping the order book: The shift to Domestic Content Requirement removed ~1 GW of distribution orders and paused C&I renegotiations, leaving a reported order book of 8.2 GW that management must now rebuild from grandfathered non-DCR demand and new DCR tenders.
- Backward integration is fully funded and on the clock: A 9 GW cell facility targets first cell by December 2026, a 6 GW wafer-ingot plant was approved at ₹3,700 cr, and debt is expected to peak at ₹6,500-6,600 cr by FY28 end.
- What to watch next quarter: The pace of DCR order book rebuild from C&I renegotiations and new tenders, the ramp of the 6 GW Gangaikondan module line, and whether per-unit EBITDA rationalization stabilizes as guided.
The DCR Transition & Order Book Reset
- Policy-driven reset: The June 2026 DCR enforcement deadline forced a structural shift in the order book. Distribution orders, previously non-DCR, moved to a spot-buying model, while a large C&I order book entered renegotiation to optimize margins under the new DCR regime. Both were removed from the reported backlog.
- What remains: The reported 8.2 GW order book includes 7.2 GW of domestic orders, of which 6 GW is tied to the removed distribution and C&I segments. This leaves 1.2 GW of firm domestic orders for FY27, with the remainder to be built from an 87 GW grandfathered non-DCR pool and ~28 GW of live utility-scale DCR tenders.
- DCR supply-demand gap: Existing domestic cell capacity is still in ramp-up and stabilization, so output runs below nameplate. Management expects utility DCR demand to exceed supply through FY27 and FY28 even as new capacities come online, creating a seller’s market for those with DCR-compliant cells.
- Procurement bridge: A 2 GW DCR cell procurement agreement is in place to serve demand until in-house cell production begins. Management declined to share pricing but stated the commercials maintain the company’s EBITDA per watt-peak expectation.
- Distribution channel ready: The distributor network has expanded to 110-plus partners and 550-plus exclusive dealers and system integrators. With DCR cells now available, the company plans to participate in PM Surya Ghar and expects distribution volumes to multiply.
Sameer Nagpal: “See, as the mandate moves to DCR, the large chunk of Non-DCR, or all of the Non-DCR distribution will move to DCR because of this policy shift.”
Backward Integration: Cell, Wafer & Ingot
- Three-stage roadmap: The integration plan moves sequentially from modules to cells to wafer and ingot. By the end of the roadmap, Vikram Solar will be fully integrated from ingot to module, a position management believes only a small group of serious full-stack players will hold in a sector it expects to consolidate around 80-100 GW of nameplate capacity.
- 9 GW cell facility (Gangaikondan): Civil and PEB works are well advanced, with cleanroom and MEP completion in October 2026. Equipment installation runs October-November, power infrastructure commissions in November, and utilities build-out finishes in December. First cell out is targeted for end-December or early January 2027, with sequential commissioning through March 2027 and production ramp-up during Q2 FY28.
- Technology choice: The first phase uses N-Type TOPCon Plus with incremental processes, including LECO, that give an efficiency leg up to 25.4-25.5% while reducing silver consumption through thinner silver fingers. Capex cost is in line with industry, and equipment orders are placed for the latest-generation tools with efficiency enablers built in from day one.
- 6 GW wafer-ingot facility: The board approved the first phase at Gangaikondan with an expected outlay of approximately ₹3,700 crores, commissioning in FY29. A further 6 GW will scale total wafer-ingot capacity to 12 GW by FY30, with board approval for the balance expected in the subsequent financial year.
- Capital allocation philosophy: Management emphasized that the cost of choosing the wrong vintage of equipment is paid for the entire operating life of the asset, a lesson drawn from 20 years of navigating technology pivots.
Sameer Nagpal: “20 years of execution through every meaningful technology pivot the industry has been through... has taught us that the cost of choosing the wrong vintage of equipment is paid for the entire operating life of the asset.”
FY27 Earnings Bridge & Margin Outlook
- Volume-led growth: FY27 production is planned at 8 GW (2 GW DCR, 6 GW non-DCR) from the expanded module base. Management guided to deliver approximately 7.5 to 8 GW, generating EBITDA of INR 1,500 to 1,600 crores, roughly 74% above FY26.
- Segment margin stack: Non-DCR execution, representing 75% of the mix, is expected to earn INR 1.75-2.0 per watt on average through FY27. The DCR segment, at 25% of the mix, benefits from the procurement deal and is expected to earn INR 2.0-2.5 per watt. At scale, this blended mix yields what management calls phenomenal growth over the previous fiscal.
- FY28 per-unit trajectory: Management expects per-unit EBITDA to rationalize further to about INR 5 per watt in FY28, trimming down by roughly one rupee from the current INR 6, as competitive intensity and scale economics play out.
- Utilization assumptions: Module utilization is modeled at 65-70% on a nameplate basis, with cell utilization at 70-75%, reflecting the ramp curve of new facilities.
- Raw material pass-through: Existing MSAs allow pass-through of cell cost and dollar appreciation to the extent of 80%. As backward integration brings cell and wafer-ingot in-house, the company will need to see how the overall market pans out rather than relying on contractual terms in isolation.
Ranjan Jindal: “That is too longshot. As on date, I briefed that the MSAs we sign with our customers do allow us to pass through the cost of cell and the dollar appreciation, which is to the extent of 80%. Going forward with cell coming in, with wafer-ingot coming in, we will have to see as to how the overall market pans out.”
Capex, Debt & Financing
- Cell capex: Total outlay of ₹5,400 crores for 12 GW, with deployment almost fully in the current year barring the last 10% installment spilling into FY28. A 10% cost increase resulted from switching machinery sourcing from Thailand to direct from China.
- Wafer-ingot capex: Initial spending for advances within ₹100 crores, with a thumb rule of ₹600 crores per GW. The ₹3,700 crore first phase will commission in FY29.
- BESS capex: Assembly capex of ₹150 crores was spent majorly in the current year. Cell manufacturing construction starts around October 2026 with a 24-month build period; this financial year sees land and initial expenses not exceeding ₹200 crores.
- Debt trajectory: Closing debt for 31 March 2027 is considered at ₹3,200 crores, rising to an expected ₹6,500-6,600 crores by FY28 end as the cell and wafer-ingot projects draw down.
- P&L impact managed: During the capex period, interest for a project is capitalized and not charged to the P&L. The P&L will carry the interest component only for debt tied to assets that have been capitalized, staggering the earnings impact.
Ranjan Jindal: “in the capex period, the interest for a project is capitalized and it's not charged to the P&L.”
US & Export Strategy
- US capacity decision deferred: Management assessed the US domestic manufacturing environment and concluded that the requirement for traceable supply down to the quartz level is extremely stringent, and skilled manpower availability is a challenge. India, as an opportunity, looks infinitely more attractive, so capital and management bandwidth remain focused on domestic backward integration.
- Existing US orders: Exports from India to the US have slimmed to negligible levels. The current export order book consists of orders from reputed IPPs the company has worked with in the past, and management believes it can execute them. A 0.6 GW US order was removed from the book after the IPP deemed it unviable due to the sunset of certain incentives.
- Traceable supply chain workaround: The company is working on a traceable, compliant supply chain from North Africa, where cell capacity does not attract high tariffs, to serve US export orders.
- New export markets: Exploration is underway in the EU, non-Chinese supply tenders, Australia, and the Middle East, with management describing early conversations as encouraging.
Rinal Shah: “the ongoing high requirement of traceable supply down to the quartz level is so stringent, as well as the availability of skilled manpower in US domestic front is a challenge, which is why India as an opportunity looks infinitely more attractive”
BESS & Adjacent Bets
- Integrated platform ambition: Vikram Solar targets 15 GWh of BESS capacity by FY30, positioning as one of the leading integrated solar platforms. The roadmap spans cell-to-pack assembly and battery cell manufacturing.
- Assembly first: A 5 GWh cell-to-pack facility is commissioning by March 2027, providing nearer-term BESS revenue.
- Cell manufacturing to follow: The first phase of 7.5 GWh of battery cell manufacturing commissions in FY29, with a second phase in FY30. Construction begins around October 2026.
- Policy tailwind expected: Management expects the next two to three years to bring extremely positive policy movement for BESS, with the economics of cell and upstream components panning out accordingly.
- Storage demand hard to size: Tenders currently specify 2 to 6 hours of storage, while C&I and data centre applications could require round-the-clock storage. Management declined to put a firm multiplier on solar-to-storage ratios, offering an illustrative example of 80 GW solar with 4 hours of storage equating to roughly 320 GWh.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Module capacity expansion | 6 GW Gangaikondan module facility, first module output | June 2026 |
| Cell capacity commissioning | 9 GW TOPCon cell facility, first cell out | End-December 2026 / early January 2027 |
| Cell production ramp | Sequential commissioning through March 2027, ramp-up during Q2 FY28 | Q2 FY28 |
| BESS assembly | 5 GWh cell-to-pack facility commissioning | March 2027 |
| FY27 EBITDA | Deliver approx. 7.5-8 GW, EBITDA of INR 1,500-1,600 crores (~74% above FY26) | FY27 |
| FY27 non-DCR per-unit EBITDA | INR 1.75-2.0 per watt on average basis | FY27 |
| FY28 per-unit EBITDA | About INR 5 per watt, trimming down by ~1 rupee from current INR 6 | FY28 |
| Wafer-ingot facility | First phase 6 GW commissioning at ~₹3,700 cr outlay | FY29 |
| BESS cell manufacturing | First phase 7.5 GWh commissioning | FY29 |
| Debt peak | Expected at ₹6,500-6,600 crores | FY28 end |
| Cell capex deployment | ₹5,400 cr total, almost fully deployed in current year barring last 10% installment | FY28 spill |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹1,450 cr, up 31% sequentially, highest-ever quarterly revenue |
| Full-year revenue | ₹4,800 cr, up 40% YoY |
| EBITDA | ₹235 cr, 16% margin |
| Full-year EBITDA | ₹917 cr, 19% margin, up 500 bps from 14% in FY25 |
| PAT | ₹110 cr |
| Full-year PAT | ₹470 cr, 10% PAT margin |
| Quarterly production | ~1 GW, highest-ever quarterly production |
| Quarterly order booking | ~1.9 GW, highest-ever order booking |
| Full-year sales volume | 3.3 GW, up 76% from 1.9 GW in FY25 |
| Order book | 8.2 GW as on 31st March 2026, mix: IPPs 69%, C&I 13%, Government and EPC 18% |
| EBITDA per watt-peak | ₹2.35 in Q4; non-DCR volume expected at ₹1.75 to ₹2 for FY27 |
| Net working capital cycle | 44 days, compressed from 82 days in FY25 |
| Net debt-to-equity | 0.03; no long-term debt, working capital net debt at ₹64 cr |
| Module capacity | 9.5 GW operational, scaling to 15.5 GW once Gangaikondan's 6 GW module plant commissions |
| Cell price pass-through coverage | ~80% of order book carries cell price pass-through clauses |
| Per-watt overhead reduction | 16% on a full-year basis |