Vardhman Special Steels Ltd Q1 FY2025 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/61i3foc9gd3a7tlav7irkuoh.pdf

Key Takeaways


Volume & Demand Environment

R. K. Rewari: "we had a conference our team attended with Maruti, which they have shared that maybe in the things to come the EV penetration, which was envisaged at 30% or 25%, will be about 15%. So, that looks good for IC engine, that we see demand will remain the same."

Margins & Cost Structure

Sanjeev Singla: "for the full year we will be well within the range of this stated range of Rs.7,000 to Rs.10,000 a ton."

Green Steel & Sustainability

Sanjeev Singla: "We are into the electric arc furnace production facility as against our competitors who are mostly into the blast furnace. So, going forward because of the lower carbon emissions we are having an edge over our competitors that currently we are almost one- fourth in terms of CO2 emissions as against our competitors."

Strategic Partnerships & Competitive Position

R. K. Rewari: "I think we belong to a well-established group which is Vardhman group number one. Number two, we have association with Aichi with our stakeholders now in our company plus they are providing us technical knowhow. We have a very forward-looking Vice Chairman, Mr. Sachit Jain, who has intellectual ability to connect with the various stakeholders in time."

Capex & Capacity Expansion


Pricing & Raw Material Dynamics


Guidance & Commitments

CommitmentSpecificsTimeline
Annual volume2,10,000 tons (vs 1,95,000 tons in FY24)FY25
EBITDA per ton₹7,000 to ₹10,000 per tonFY25
EBITDA per ton (post-capex)₹8,000 to ₹11,000 per tonFY26 onwards
Solar power plant55 MW plant commissioned, CO2 emissions below 0.45By March 2025
Kocks block capacity addition~18,000 tons per annum addedOn plan, during FY25
Debt-equity ratioRemain close to 0.12Going forward
Planned shutdownsSeven days (July) and two to two-and-a-half weeks (Q3/Q4)FY25

Key Metrics

MetricQ1 FY25
Revenue₹415.78 cr, +1.32% YoY
EBITDA₹48 cr, +31.71% YoY
PAT₹26.08 cr, double-digit growth YoY
EBITDA per ton₹7,000–₹10,000 (FY25 guidance range); next year ₹8,000–₹11,000 after capex
Sales volume50,298 MT
Realization₹82,000 per ton
Annual volume target2,10,000 tons (FY25), vs 1,95,000 tons achieved in FY24
Billet capacity2,60,000 tons per annum, tested and achieved in Q4 FY24 and Q1 FY25
Rolling production (in-house + outsourced)55,000–57,000 tons in Q1, vs sales of 50,000 tons; balance built inventory
Outsourced rolling volume~4,000 tons per month, up from ~2,000 tons previously
Inventory increase₹62 cr in Q1, driven by pre-shutdown stock build
Debt-equity ratio0.12
Power and fuel cost₹44 cr in Q1; sustainable at current production level, subject to 3% annual tariff increase from 15-Jun-2024
CO2 emissions0.73 tons per ton of steel; expected below 0.45 after 55 MW solar plant commissioned by Mar-2025
Exports (incl. indirect via Aichi)~10% of total sales