Key Takeaways
- Spinning delivers, fabric lags: Spinning ran at full utilization with good margins, helped by trading gains from lower-cost cotton inventory. Fabric missed expectations as U.S. tariff uncertainty cost a sampling season and sharp yarn price increases were only 60–70% passed on.
- Cotton supply-demand turning supportive: After three years of surplus, production is expected to fall below consumption, creating a 3–4% annual gap that should sustain reasonably good cotton prices for the next 1–2 years.
- Synthetic fabric is the new growth bet: Two big brand approvals received, production starting in August, and a stated ambition to reach 70–80% utilization within six months from the current 15–20%. Management believes India has a huge capacity shortage in this product.
- Margins carry a trading tailwind that will fade: Current spinning margins include gains from cotton bought earlier at lower prices. As that inventory is consumed, margins will moderate, though management expects them to stay above the depressed levels of the last 2–3 years.
- What to watch next quarter: Whether the promised U.S. fabric order recovery materializes, the pace of synthetic fabric ramp-up from August, and how much spinning margins compress as lower-cost cotton inventory runs out.
Spinning: Full Utilization, Trading Gains, and a Margin Peak
- Demand strong, order book full: Export order book stands at 90–95 days, domestic at 45–50 days, with Chinese buying continuing since November–December last year. Management sees sales visibility for at least the next 3–4 months.
- Chinese demand structurally supported: Chinese cotton prices at $1+ mean domestic mills earn only USD 0.65–0.70 per kg conversion margin, making imported yarn economically attractive. Additionally, importing yarn from India or Vietnam eliminates Xinjiang cotton risk for Chinese garment exporters whose final shipments go to markets that ban Xinjiang-sourced goods.
- Supply-side discipline helps: 1.2–1.3 crore spindles have closed permanently in India with hardly any revival. New capacity additions remain very limited, with last year adding only ~0.05 crore spindles and this year not more than 700,000–800,000, much of that modernization rather than net-new.
- Global spindle capacity shrinking: China down from ~11.6–11.7 crore to ~8.4–8.5 crore spindles. Indonesia reduced, Vietnam near saturation, Turkey in very bad condition and reducing, Bangladesh not adding. Only India and Egypt are adding spindles.
- Margin moderation ahead: Current margins include trading gains from cotton bought earlier at lower prices. As that inventory is consumed and market-price cotton enters production, margins will moderate. Management declined to quantify the extent but expects conversion to settle in a range of about USD 0.85–0.90 per kg if demand-supply conditions hold, with overall margins around 13–14%.
Jain: "These numbers have some trading margins, which may not be available once we move to the market prices of cotton unless the yarn prices further increases."
Fabric: A Miss, a Recovery, and a New Synthetic Chapter
- Cotton fabric missed expectations for two reasons: U.S. tariff uncertainty caused the company to miss sampling for a particular season, so U.S. orders did not come to India. Separately, sharp yarn price increases created a lag in passing costs to customers, with only 60–70% passed on so far.
- Utilization depressed by new capacity: A new line was added in March that could not be fully utilized, pulling down the utilization percentage.
- Recovery signs emerging: The last one month has shown improvement. Management expects far better business from U.S. customers in the next 2–3 months. The current quarter looks definitely better than Q1, comparable to Q1 last year but 3–4% lower than Q4.
- Synthetic fabric: the new growth vector: The project started in February–March with products new to the company, aimed at replacing imported fabrics. Two big brand approvals were received in the last month, and production starts in August. First quality and acceptability parameters are "very, very good."
- Utilization ramp-up targeted: Currently at only 15–20% utilization, management wants to reach 70–80% within the next six months. Once near capacity utilization, expansion is on the table given India's stated capacity shortage in this product.
- Margin ambition: Management believes synthetic fabric margins as a percentage of sales and on capital employed could be better than the existing product line, with more certainty expected in the next six months.
Jain: "This is one business where I believe India has a huge capacity shortages on this product. Definitely, we'll look at it expanding as we are reaching near to the capacity utilization."
Cotton: A Market Turning Supportive After Three Tough Years
- Supply-demand flip: After three years, this will be a year where production falls below consumption. Management expects a 2–3% annual drop in cotton crop and a 2–3% annual consumption increase, creating a 3–4% gap for the next 1–2 years. This should support reasonably good cotton prices.
- Indian prices now aligned with international: For the last two years, Indian cotton was much more expensive than the rest of the world, which crushed spinning margins. Over the last 4–5 months, Indian prices have aligned with international prices, removing that disadvantage.
- Price floor from MSP: Going by Minimum Support Price and CCI procurement, cotton will not fall below INR 65,000–66,000 even in the next season.
- Crop quality risks: Variation in rains across growing areas raises quality concerns and potential crop size reduction. Management says it is very early to call and the next 2–4 weeks need watching. U.S. West Texas also remains under drought conditions.
- China reducing cotton acreage: China has announced a designed reduction in cotton growing areas to concentrate more on food crops, which may increase its dependence on imported cotton and yarn.
- Cotton import window open: The company is evaluating imported cotton on a daily basis and taking decisions where possible within cost, with a duty-free window available only for the next 2–3 months.
Jain: "After 3 years, this will be a year where the production could be lower than the consumption. And this scenario may continue for next 2, 3 years where we might look at a 2%, 3% drop every year in the cotton crop and maybe 2%, 3% consumption on the cotton side, which means a gap of 3% to 4% for next 1 to 2 years, which should be good enough to have the reasonably good prices on the cotton."
Structural Tailwinds: FTAs, Speed, Scale, and Sustainability
- FTAs creating a genuine opportunity: Free trade agreements with the U.K. and EU are creating a natural advantage for Indian manufacturers. Management believes the next two years represent a genuine opportunity for Indian textile exporters.
- Fashion cycle compressing: Customers want yarn delivery in 20 days, fabric in 44–45 days, and garments in 60–70 days. The cycle continues to shorten, and whoever can deliver wins.
- Size becoming an advantage: Customers increasingly want all product types, peak management, and minimum delivery days from a single vendor. The company's scale positions it to meet these demands.
- Innovation rewarded: Even 5–10% new products in colors and variations are increasingly appreciated by customers.
- ESG and compliance as differentiator: Customers prefer reduced coal and fossil fuel usage. While a nice-to-have rather than a direct advantage, customers are more willing to work with green companies. Social compliances and fair practices are very important, and organized players are gaining advantage as brands prefer vendors who can deliver on all requirements.
- Recycling demand sustained: Recycled yarn and fabric remain in fashion, especially in European export markets. Mechanical recycling technology has improved dramatically in cost parameters, return on capital, and fiber availability over the last 2–3 years.
Jain: "The fashion cycle is reducing. Everyone wants to have a minimum inventory so that one, their capital — working capital comes down, also the risk of obsolescence comes down. So any customer who is dealing with you wants a delivery of yarn, let's say, in 20 days, delivery of fabrics in about 44 to 45 days, delivery of garment in 60 days, 70 days kind of a situation. So that cycle will continue to screw and whoever is in a position to deliver will be a winner."
Capex Pipeline: Power, Open-End, Garments, and Dhar
- Power cost reduction underway: A biomass boiler started in Baddi last week, with another in Madhya Pradesh expected in about a month. Solar and wind power investments have partially started delivering advantages, with more expected month after month over the next six months.
- Open-end project: Construction started last week with capacity of about 55–60 tons per day. Management hopes capacity will be available in about 10 months.
- Garment capacity doubling: Expansion from 7,000 shirts per day to double that, reaching ~0.45 crore pieces with peak revenue of ~₹300 crores. Expected fully operational by June 2027, with the one-year timeline driven by worker training requirements. Overhead costs will hardly increase, so margins are expected to improve on a stand-alone basis.
- Dhar (PM MITRA Park): Government still developing land, with physical progress suggesting availability by December. Once land is available, the company is ready to start first construction, possibly with a spinning project, and later add more products. Power is not expected before June 2027, and construction will start only after clear visibility. Project implementation timeline is ~10–12 months. Management has lots of projects in mind and intends to put up capacities over the next 3–4–5 years.
- Most modernization capex completed: Power projects to finish in the next three months.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Fabric demand recovery | Far better business from U.S. customers; utilization to start improving | Next 2–3 months |
| Synthetic fabric utilization | Reach 70–80% capacity utilization (from 15–20% currently) | Within next 6 months |
| Synthetic fabric margin clarity | Certainty on whether margins beat existing product lines | Next 6 months |
| Power cost reduction | Advantages from solar and wind to increase month after month | Next 6 months |
| Open-end project capacity | 55–60 tons per day available | ~10 months |
| Garment capacity doubling | Fully operational at ~₹300 crores peak revenue | By June 2027 |
| Dhar site land availability | Government-developed land ready for first construction | By December |
| Dhar site power availability | Power connection for the site | Not before June 2027 |
| Spinning margin range | Conversion of ~USD 0.85–0.90 per kg, overall margins ~13–14% | Ongoing, conditional on demand-supply |
| Cotton price floor | Not below INR 65,000–66,000 per candy | Next season |
| Cotton supply-demand gap | 3–4% annual deficit supporting prices | Next 1–2 years |
| ROCE improvement | Improve to reasonable level as trading stocks come down and investments mature | 5-year period |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | Improvement in percentage and absolute amounts, figures not stated |
| Fabric revenue | Comparable to Q1 FY26, about 3–4% lower than Q4 FY26 |
| Cotton yarn spread (market prices) | USD 0.90 per kg of yarn |
| Spinning margins (conversion available) | USD 0.85–0.90 expected range, up from USD 0.65–0.70 in prior years |
| Yarn price pass-through to fabric customers | 60–70% passed on, 20–30% not yet passed on |
| Cotton international price | USD 0.78–0.81 per pound, average ~USD 0.80 |
| Indian cotton price (CCI) | ~INR 64,000 per candy, up from ~INR 55,000 |
| Indian cotton price in US cents | ~USD 0.87–0.88; cotton at ~USD 0.91–0.92 |
| China reserve cotton selling price | ~USD 1.15–1.16 average; above $1 even after VAT reduction |
| India total yarn exports | ~11 crore kg per month, up from ~9.5–9.7 crore kg, net increase ~1.5 crore kg primarily from China |
| China share of India yarn exports | ~30% of total yarn exports; ~20–25% of Vardhman's yarn exports, ~7–8% of total production |
| International yarn rolling price (30s Combed) | $3.20–3.30; Indian prices aligned ex-mill, plus minus INR 2–3 |
| Industry spindle closures (last 3 years) | 1.2–1.3 crore spindles permanently closed |
| India new spindle capacity added last year | ~0.05 crore spindles |
| India new spindle capacity announced this year | Not more than 700,000–800,000 spindles |
| China spindle count | ~8.4–8.5 crore, down from peak of ~11.6–11.7 crore |
| Synthetic fabric capacity utilization | 15–20% of 15 lakh meters per month capacity; target 70–80% within 6 months |
| Garment capacity | 7,000 shirts per day existing; doubling from 0.22 crore to 0.45 crore pieces; peak revenue ~INR 300 crores at 100% utilization |
| Garment export/domestic mix | 30% export, 70% domestic brands |
| Yarn segment split | One-third each export, domestic, captive |
| Total capex plan | INR 3,600 crores; ~INR 800–900 crores to next year, rest completed or completing this year |
| Open-end project capacity | 55–60 tons per day; construction started, expected in ~10 months |
| Dhar (PM MITRA Park) project | No expenditure yet; land expected by December; power not before June '27; construction ~10–12 months after start |
| Government MSP increase for cotton | 6–7% increase; cotton likely not less than INR 65,000–66,000 next season |
| Australia cotton crop estimate | ~0.35 crore bales this year; next year maybe ~0.25 crore bales |
| Brazil cotton area reduction | ~5% |
| Crude oil price | Touched $100, came down to ~$87–88 |
| Recycled fiber capability | Up to 30–40% recycled fiber with virgin fibers on ring spinning |