Key Takeaways
- Volume recovery underway, led by trade: Trade volume grew +8.6% Y-on-Y and trade share rose to 74%, while institutional business remained negative; management expects both segments to turn positive in H2.
- Cost trajectory improving, but fuel a near-term drag: Total cost was INR4,410/ton in Q2, with a target of INR4,150 by Q4 FY27; fuel costs are expected to rise ~INR100/ton given stock levels, offset by higher domestic coal usage and operational efficiencies.
- Acquired assets are the margin unlock story: Penna and Sanghi are running at only ~50% utilization, which management called "my pain"; a "complete turnaround" is promised for H2, with both Sanghi kilns now running and debottlenecking projects underway.
- Trade value accretion is a multi-quarter compounding bet: Management estimates an INR40/ton extra benefit already being realized from the trade focus, with another INR40/ton every 2–3 quarters, cumulating to ~INR150/ton by June.
- What to watch next quarter: Whether the promised H2 volume acceleration materializes despite drought headwinds in key states, the pace of Penna and Sanghi utilization ramp-up, and the trajectory of fuel cost pass-through to pricing.
Volume & Channel Mix
- Trade channel drove the quarter: Trade volume grew 8.6% Y-on-Y while B2B remained negative, pulling overall volumes to flattish; premium products rose 2% to 37% of trade sales, and blended cement share improved from 77% to 82%.
- Institutional recalibration is deliberate: Negative EBITDA institutional volumes were sacrificed; as costs come down, the institutional business becomes more viable for the value focus, and both trade and B2B are expected to turn positive in Q3 and Q4.
- October exceeded expectations: Trade volumes in October surpassed management's internal targets, prompting a higher bet on trade growth for Q3 and Q4.
- Regional breadth was strong: North led on EBITDA and total volume growth with trade up 13%; West recorded 14% trade volume growth and the most resilient overall EBITDA; South grew trade volumes 13% Y-on-Y with strong sequential recovery; East maintained trade volumes broadly in line with last year.
- Drought is a watchpoint: Maharashtra, Karnataka, Andhra, and Rajasthan have declared drought; repercussions are expected with some lag, and states may moderate construction cycles, though the company has not yet faced the impact.
Bahety: "In fact, I would say that to our management expectations, we have much more larger potential. And therefore, I would up my bet on a higher degree of trade growth in Q3 and Q4."
Cost Structure & Margin Levers
- Total cost and the path down: Q2 total cost was INR4,410/ton; excluding geopolitical conflict impact, the normalized figure was INR4,182/ton; the FY27 target is INR4,250/ton, with a Q4 FY27 ambition of ~INR4,150/ton.
- Fuel costs rose but mix improved: Blended fuel cost was INR1.87 per 1,000 kcal vs INR1.60 last year and INR1.66 in Q1; higher consumption of domestic coal mitigated escalation from the Middle East crisis.
- Fuel headwind incoming: Fuel costs are expected to rise ~INR100/ton given stock levels; offsets include higher domestic coal usage, kiln capability to handle high-ash domestic coal, and price improvements passed to customers.
- Power costs fell sharply: Net power cost was INR4.8/unit vs INR6.0 in Q2 FY26 and INR4.3 in Q1 FY27; green power share reached 61% (including both consumption and sales), with renewable share expected to increase in H2.
- Logistics costs mixed: Moderately higher Y-on-Y due to higher diesel costs, partly offset by primary lead reduction from 265 km to 254 km; further lead reduction expected as new facilities ramp up.
- Cost reduction drivers in H2: Green power consumption increasing, BCFC infrastructure adding value, WHRS (18 MW at Sanghi commissioning in Q3), and AFR contributing; management targets ~INR160/ton cost improvement through H2, factoring in the current inflationary environment.
- Working capital improved: Better receivables and inventory management improved the business working capital cycle by 10 days; improvement expected to sustain and help profitability.
Bahety: "My profitability projection improvement is more based on cost optimization. Prices will be there. It will be as per the market sentiments and forces."
Acquired Assets & Turnaround
- Penna and Sanghi utilization is the pain point: Both assets are operating at ~50% utilization, which management acknowledged as "my pain" and an opportunity to improve in Q3 and Q4.
- Sanghi kilns now fully operational: Both kilns are "absolutely up and running," and management promised a "very substantial improvement in Sanghi utilization as well as cost efficiencies" and a "complete turnaround."
- Penna turnaround equally confident: Management expressed similar confidence for Penna as for Sanghi, though specific utilization figures for H1 were deflected pending a "complete revamping" in Q3 and Q4.
- Debottlenecking underway: Four debottlenecking projects are progressing with Loesche, with completion expected in 4–5 months.
- Vintage asset recalibration: Some high-cost, less-efficient units will be run down; adequate clinker from eastern plants will sustain more efficient grinding units closer to market; 0.2–0.3 crore tons may be considered for mothballing after detailed engineering.
- Clinker vs grinding imbalance: Clinker utilization at 75% is higher than cement utilization at 67%, indicating existing excess grinding capacity; some high-cost grinding units were temporarily closed.
Bahety: "Jashandeep, you are absolutely right. That is also my pain as well as of now, and which we are addressing it."
Capacity Expansion & Capex
- Q2 commissioning: 0.46 crore tons commissioned across Dahej (Gujarat), Salai Banwa (UP), and Kalamboli (Maharashtra); 0.32 crore tons across Bathinda (Punjab) and Jodhpur/Penna (Rajasthan) has stabilized.
- H2 pipeline: Warisaliganj (Bihar) 0.24 crore tons to be commissioned in H2 FY27; Bathinda and Jodhpur capacities expected to ramp up in H2.
- Long-term capacity targets: 14.9 crore metric tons by FY29, 15.5 crore metric tons by FY30; FY28 target of 149 MTPA with INR4,000/ton operating cost (combined existing plus new).
- Capex program: ~INR14,500 crores for the 3 crore ton expansion, approximately INR7,500 crores per year; FY27 capex of INR6,500–7,000 crores, with FY28 and FY29 at ~INR7,500 crores each ballpark.
- Self-sustaining capex: The program is expected to be self-sustainable from business cash flows; any interim funding needs can be handled by the strong balance sheet.
- Expansion geography: Focused on West (1.5 crore tons), East (1.2 crore tons), and North (0.3 crore tons), all value-accretive, brownfield, with existing clinker availability.
- Equipment and execution: Equipment for the new 3 crore ton expansion already ordered; PMC consultant appointed; preparatory work completed, giving confidence for a 14–18 month execution timeline.
- Maratha Line-2: In advanced stages, expected up and running in the next couple of quarters.
Bahety: "Honestly, for example, if you ask me, this is like a completely self-sustainable capex program."
Trade Value Accretion & Pricing
- INR40/ton compounding benefit: Management estimates an INR40/ton extra benefit already being realized from the trade focus; this is expected to be INR40/ton extra every next 2–3 quarters, cumulating to ~INR150/ton by June.
- Pricing sustained in lean quarter: Price sustained at INR255/bag in the monsoon quarter; INR10/bag realized in October.
- Blended realization underwhelming vs peers: An analyst noted blended realization growth was underwhelming despite trade mix improvement; management said the journey has started and benefit will come with every passing quarter.
- Progressive price hikes expected: More progressive price hikes expected in coming months as the industry passes on fuel cost increases beyond reasonable levels.
- Market share with value focus: Management reiterated it will not lose market share but will pursue it in a "calibrated manner of value focus," calling both objectives achievable.
Bahety: "To my estimate, with this focus, for example, I'm almost getting like INR40 a ton, for example, extra, if I would not have done that. And this is going to be INR40 extra a ton every next 2, 3 quarters. And by, for example, June when it comes to, we should be getting almost INR150 a ton benefit from this value benefit coming from trade."
Operational Initiatives & Ecosystem
- Vendor partner ecosystem scaling: New grinding units at Kalamboli, Salai Banwa, Bathinda, Penna Jodhpur, and Dahej are now operationalized with vendor partners; logistics SLA started in 5 plants with positive feedback; the ecosystem will be a "defining part" of operations.
- BCFC for logistics savings: BCFC infrastructure is being used for fly ash movement (e.g., Kalamboli from Tiroda), providing logistics savings; the Government of India has a specific incentive scheme for BCFC.
- EV deployment beginning: Electric vehicles already stationed at Sanghi and Ambujanagar, set to begin operations; ~400 EVs targeted by March '27.
- Digital tools live: Digipin successfully mapped pan-India, with a master database revamped to surface inefficiencies in backloading and transporter negotiations; CINOC (Cement Intelligent Network Operating Center) is operational, helping on logistics.
- Fly ash strategy: Three-pronged approach: use in blended cement, sell in the market, and move into value-added products; a long-term supply agreement with group thermal power plants covers 2 crore tons, with opportunity to expand as group plants expand.
- Blended cement advantage: Current blended cement ratio is ~82%, with a target of 80-20 blended-to-OPC; fly ash is available in-house and governments are promoting blended/green cement.
- Ready-mix concrete: Quarterly volume of 0.11 crore cubic meters, up 19% Y-on-Y, with a network of almost 125 plants; pace of growth expected to accelerate.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | Grow ahead of industry; both trade and B2B turn positive | H2 FY27 |
| Total cost | INR4,250/ton (FY27 target); ~INR4,150/ton (Q4 exit) | FY27; Q4 FY27 |
| Cost improvement | ~INR160/ton through H2, factoring in current inflation | H2 FY27 |
| Trade value accretion | INR40/ton extra every 2–3 quarters, cumulating to ~INR150/ton | By June |
| Sanghi turnaround | "Very substantial improvement" in utilization and cost efficiencies; "complete turnaround" | H2 FY27 |
| Penna turnaround | Similar confidence to Sanghi; "complete revamping" in Q3 and Q4 | H2 FY27 |
| Capacity commissioning | Warisaliganj (Bihar) 0.24 crore tons | H2 FY27 |
| Capacity ramp-up | Bathinda and Jodhpur capacities ramp up | H2 FY27 |
| Maratha Line-2 | Up and running | Next couple of quarters |
| Debottlenecking | 4 projects with Loesche completed | 4–5 months |
| EV deployment | ~400 EVs operating across locations including Sanghi and Ambujanagar | By March '27 |
| Merger (ACC + Orient into Ambuja) | Complete, subject to regulatory, statutory and NCLT approvals | Within FY27 |
| Capex | INR6,500–7,000 cr (FY27); ~INR7,500 cr each (FY28, FY29) | FY27–FY29 |
| FY28 cost target | INR4,000/ton operating cost (combined existing + new) | FY28 |
| Capacity target | 14.9 crore metric tons (FY29); 15.5 crore metric tons (FY30) | FY29; FY30 |
| Vintage asset recalibration | 0.2–0.3 crore tons may be mothballed/reduced after detailed engineering | Undated |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹9,197 cr |
| Operating EBITDA | ₹1,271 cr |
| EBITDA margin | ~14% |
| EBITDA per metric ton | ₹770 |
| Profit after tax | ₹236 cr |
| Net worth | ₹72,238 cr |
| Cash and cash equivalents | ₹1,070 cr |
| Cement sales volume | 1.65 crore metric tons |
| Trade volume growth | 8.6% YoY |
| Trade share of total sales | 74%, up 6 percentage points YoY |
| Premium product share of trade sales | 37%, up from 35% last year |
| Blended cement share | 82%, up from 77% last year |
| Price per bag | ₹255 sustained in the lean monsoon quarter |
| Total cost per metric ton | ₹4,410; ₹4,182 normalized excluding geopolitical impact |
| Fuel cost per 1,000 kcal | ₹1.87 vs ₹1.60 in Q2 FY26 and ₹1.66 in Q1 FY27 |
| Net power cost per unit | ₹4.8 vs ₹6.0 in Q2 FY26 and ₹4.3 in Q1 FY27 |
| Green power share | 61% at company level, including consumption and sales |
| Primary lead distance | 254 km, reduced from 265 km |
| Ready-mix concrete volume | 0.11 crore cubic meters, up 19% YoY |
| Ready-mix concrete plants | ~125 |
| Capacity utilization (Q2 exit) | ~61–62% |
| Clinker utilization (FY26) | ~75% (analyst estimate, not confirmed by management) |
| Cement utilization (FY26) | ~67% (analyst estimate, not confirmed by management) |
| Consolidated clinker capacity | 6.9 crore tons |
| Clinker ratio | ~66% |
| Green power sales revenue | ₹136 cr |
| Fly ash sales revenue | ~₹25 cr |
| Combined fly ash and RE contribution per ton | ~₹97 |
| Working capital cycle improvement | 10 days |
| Spot imported fuel cost per 1,000 kcal | ₹2.80–₹2.85 currently |
| Fuel mix: domestic | >60% |
| Fuel mix: imported | <40% |
| Pet coke share of fuel mix | ~10–12% |
| FY27 cost target | ₹4,250 per metric ton |
| FY28 cost target | ₹4,000 per metric ton for combined capacity at 149 MTPA |
| FY27 capex guidance | ₹6,500–7,000 cr; ₹3,500 cr incurred in H1, balance in H2 |
| New expansion capex (3 crore tons) | ~₹14,500 cr over FY27–FY29, ~₹7,500 cr per year |
| Capacity target by FY29 | 14.9 crore metric tons |
| Capacity target by FY30 | 15.5 crore metric tons |
| Current total capacity | 113.5 MTPA |
| Penna and Sanghi utilization | ~50% ballpark |
| H2 volume growth guidance | Higher single digit, effort to move above double digit |
| Cost improvement guidance through H2 | ~₹160 per ton (analyst's characterization, unconfirmed) |
| October price realization increase | ₹10 per bag already realized |
| Trade mix benefit expected | ₹40 per ton extra currently; cumulative ~₹150 per ton by June |
| Electric vehicles expected by March '27 | ~400 |
| Fly ash tied up with group thermal plants | 2 crore tons |
| RMC EBITDA margin | ~7% |