Key Takeaways
- Volume-led beat with cost control: Revenue grew 12% YoY while operational cost fell 9% to INR4,345 per ton, driving EBITDA up 37% and EBITDA per ton up 17% to INR1,026.
- The cost reset is structural, not cyclical: A 20% reduction in total cost per ton since the Sep '22 takeover, with management targeting a further INR530 per ton reduction by FY28 and an end-state of INR3,650 per ton.
- Capacity doubling is fully funded and underway: Promoters infused INR8,339 crores in April, taking the war chest to INR20,000 crores; three new kilns and 35 grinding units are in the pipeline to reach 14 crore tons by FY28.
- Sanghi is turning the corner but not yet clean: Both kilns are now operational, the jetty draft has improved, and the Tuticorin grinding unit is receiving clinker by sea, though Q4 margins were flattered by one-off provision write-backs.
- What to watch next quarter: The pace of EC approvals for the three new kiln lines, stabilization of Sanghi kilns at full tilt in H2, and whether the promised INR90 per ton green power savings begin to materialize as solar capacity commissions.
Cost Leadership & Margin Trajectory
- The INR530 per ton roadmap: Management declined to break down the target by line item but pointed to green power (INR90 per ton by FY28), logistics optimization (primary lead distance target of ~100 km), and fuel management (80-90% coal from captive sources within 12 months) as the big levers.
- Power cost as a structural advantage: Power cost today is INR6.75 per unit; management expects this to fall to ~INR4.50 over five years, delivering INR150 per ton in cement cost savings alone. A 200 MW solar plant commissions this quarter, with 1,000 MW of renewable energy targeted by FY26 to meet 60% of power needs from green sources.
- Fuel management is already paying: Kiln-in-fuel cost dropped 17% to INR1.84 per 1,000 kcal, driven by better fuel mix, increased AFR share (to 10.6% from 8.7%), and higher WHRS contribution (to 13.5% from 9%). Management expects another INR0.04-0.05 per kcal improvement on the fuel side.
- Logistics reset is a multi-year story: Secondary lead distance reduced by 4 km to 48 km; direct dispatch maintained at 54%. The sea logistics model on the west coast will take ~18 months to transform once Sanghi's jetty infrastructure is fully upgraded, with sea freight expected to reach ~10% of the mix in 24 months.
- End-state ambition: Management is "110% confident" of reaching an end-state cost of INR3,650 per ton before the targeted timeline, which would support an EBITDA per ton of INR1,500+.
Kapur: "I'm 110 percent confident that that journey will be made before time."
Capacity Expansion: The 14 Crore Ton Roadmap
- Three new kiln lines await only EC approval: Management has identified locations in the West, North, and South for 0.4 crore ton clinker lines each, with land and leases already secured. Orders will be placed within a quarter or two of receiving environmental clearance.
- Grinding capacity is being pulled forward: Bhattapara clinker facility is at 67% civil work completion (target Q4 FY25); Sankarel and Farakka grinding units are at 52% and 40% respectively (target Q3 FY25). Maratha clinker line is contracted on an EPC basis (target Q2 FY26). Salai Banwa, Sindhari, Marwar, and Mundra grinding units are expected by end of FY26.
- FY25 exit capacity of 8.6 crore tons: This steps up toward a FY26 capacity of 10-12 crore tons, with the full 14 crore ton target by FY28. Clinker capacity is targeted at 8.2 crore tons by FY28, with readiness for 17.5 crore tons.
- Funding is not a constraint: Total growth capex for the current year is ~INR7,500 crores, to be funded largely through internal accruals and operating cash flows. The INR20,000 crore warrant infusion is earmarked for strategic initiatives, keeping the balance sheet debt-free.
Kapur: "Three locations, one in West, one in North and one in South, 0.4 crore, 3 kilns we are ready to place orders as soon as we have the EC. And this is not so far in distant future. I'm talking of only a quarter or two at the most."
Sanghi Turnaround: Progress & Caveats
- Both kilns now operational: After refurbishment, the two Sanghi kilns are targeting 17,500 TPD and are expected to run at full capacity in H2 FY25. The clinker benchmark for FY25 is ~0.5 crore tons, with post-refurbishment capacity of 0.7 crore+ tons.
- Q4 margin was flattered by one-offs: Sanghi's 20.5% EBITDA margin included a write-back of discount provisions and other provision reversals totaling ~INR33 crores. Underlying performance benefited from lower fuel costs and lower fixed costs, but the reported number is not clean.
- The Tuticorin link is now live: The first clinker ship carrying 50,000+ tons has sailed from Sanghi to the newly acquired Tuticorin grinding unit. A group power plant near Tuticorin is in advanced stages of acquisition, which will assure low-cost fly ash and make the unit highly competitive.
- Jetty upgrade unlocks the west coast: Draft has improved from 2 meters to 4.5 meters, enabling larger vessels. Management is targeting 10,000+ DWT vessels down the line, which will reshape the logistics model on the west coast with a sizable impact on freight cost over the next 18-24 months.
- Rating upgrade signals financial repair: Sanghi's credit rating has been upgraded from D to AA, with a stated target of reaching AAA.
Market Position & Premium Strategy
- Volume growth without price wars: ACC grew volumes ~17% last quarter, well above industry growth, while maintaining a blended cement mix of 86% and increasing premium products as a share of trade sales to 24%. Management says this premium positioning insulates the company from day-to-day commodity battles.
- Market share ambition is explicit: The target is to reach 20% market share from ~14% currently, backed by the 14 crore ton capacity program. Management is confident of staying ahead of the demand curve, with industry demand expected to grow at 8-9% over the next five years, faster than capacity expansion.
- South India is the next frontier: ACC is under-supplied in Tamil Nadu and carries a strong brand in the South. The Tuticorin grinding unit acquisition is the entry point, and management expects to ramp up quickly.
- The Adani cost DNA: Management frames the strategy as consistent with the group's playbook across sectors: lowest cost, highest productivity, highest EBITDA. The premium product mix provides a buffer, though management acknowledged that as more capacity comes online and if sentiment softens, even premium segments can feel pressure.
Kapur: "That's also the Adani DNA. You look at any of our Adani companies in each of the sector we are the lowest cost and highest productivity. And thereby it also renders us highest EBITDA."
Fuel, Power & Raw Material Security
- Captive coal is the next big unlock: Management targets securing 80-90% of coal requirements through own captive sources within 12 months. The company has won several domestic coal auctions for both kiln fuel and CPP fuel, with a large part of coal cost already locked in. Mines are selected for G5-G7 quality for kilns and lower grades for captive power plants, with a preference to avoid washing due to wastage.
- Green power ramp is imminent: 200 MW of solar is commissioning this quarter (Khavda phase 1), with the remaining 800 MW of wind and solar targeted for completion by mid-FY26. WHRS capacity has already increased to 134 MW from 40 MW at takeover, with a target of 186 MW by March '25.
- Limestone reserves de-risked: The company won bids for 15 new limestone mines in Q4 FY24, taking total reserves to 780 crore tons, sufficient to support the long-term capacity ambition.
- Logistics fleet expansion: 11 GPWIS rakes have been ordered (8 delivered, rest by Q1 FY25), and 26 DCFC rakes are ordered for fly ash transportation (10 expected in the current financial year). An additional 10 rakes are being brought in for fly ash movement.
Kapur: "Every coal mine that we win or we plan, it goes to the asset test of what quality, what grade. And generally by rule we don't like to wash because we believe lot of wastage happens there. We try straight away work on good quality coal."
Corporate Structure & Reporting
- Management pushes consolidated view: The CEO explicitly encouraged investors to evaluate performance on a consolidated Ambuja basis rather than at the individual entity level, arguing that his mandate is to optimize across the entire portfolio for maximum shareholder benefit. A question about potential consolidation of the three listed cement companies was raised but not substantively answered.
- MSA volumes are growing fast: Master Supply Agreement volumes rose 42% to 0.34 crore tons in Q4, with additional flows from Sanghi to both Ambuja (4.2 lakh tons) and ACC (2.5 lakh tons), reflecting increasing integration across group entities.
Kapur: "I would encourage all of you to look at Ambuja results as a console only because my job as a CEO for the entire outfit is to get the best out of all. And when I squeeze the juice of each of the entities and get the maximum benefit for my shareholders is when you see the console results of Ambuja and not necessarily individual entities."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity expansion | Exit at 8.6 crore tons cement capacity | FY25 end |
| Capacity expansion | Reach 10-12 crore tons cement capacity | FY26 end |
| Capacity expansion | Reach 14 crore tons cement capacity, 8.2 crore tons clinker | FY28 end |
| New kiln lines | Place orders for 3 new kiln lines (West, North, South, 0.4 crore tons each) | Within 1-2 quarters of receiving EC |
| Bhattapara clinker facility | Commission | Q4 FY25 |
| Sankarel & Farakka grinding units | Commission | Q3 FY25 |
| Maratha clinker line | Commission | Q2 FY26 |
| Salai Banwa, Sindhari, Marwar, Mundra grinding units | Commission | FY26 end |
| WHRS capacity | Increase to 186 MW | March '25 |
| Renewable energy | Commission 1,000 MW (60% of power from green sources) | FY26 |
| Green power cost savings | INR90 per ton reduction | FY28 |
| Coal security | Secure 80-90% of coal from captive sources | Within 12 months |
| Cost reduction | Further INR530 per ton reduction to reach INR3,650 per ton end-state | FY28 |
| Sanghi clinker production | ~0.5 crore tons; both kilns at 100% in H2 | FY25 |
| Sanghi credit rating | Upgrade to AAA | No date |
| Market share | Reach 20% | No date |
Key Metrics
| Metric | Q4 FY24 |
|---|---|
| Consolidated revenue | ₹8,894 cr, +12% YoY |
| Full-year FY24 revenue | ₹33,160 cr, +7% YoY |
| Operational cost per ton | ₹4,345, -9% YoY |
| EBITDA | ₹1,699 cr, +37% YoY |
| EBITDA per ton | ₹1,026, +17% YoY |
| EBITDA margin | 19.1%, expanded 3.5 ppt YoY |
| Full-year FY24 EBITDA | ₹6,400 cr, +73% YoY |
| Full-year FY24 EBITDA per ton | ₹1,081, +60% YoY |
| Full-year FY24 EBITDA margin | 19.3%, expanded 7.4 ppt YoY |
| Power and fuel cost per ton | ₹1,219, -13% YoY from ₹1,404 |
| Kiln-in-fuel cost | ₹1.84 per 1000 kcal, -17% from ₹2.21 |
| Logistics cost per ton | ₹1,280, -8% YoY from ₹1,389 |
| Master Supply Agreement volume | 0.34 cr tons, +42% YoY from 0.24 cr tons |
| Premium products as % of trade sales | 24%, up from prior levels |
| Share of AFR in fuel mix | 10.6%, up from 8.7% |
| Share of WHRS in power mix | 13.5%, up from 9% |
| Consolidated cash and cash equivalents | ₹15,999 cr as of Mar 31, 2024; ₹24,338 cr including warrant proceeds received in April |
| Grinding capacity | 7.89 cr tons, after Tuticorin acquisition of 0.15 cr tons |
| WHRS capacity | 134 MW currently, targeting 186 MW by Mar '25 |
| Sanghi Q4 clinker production | 0.07 cr tons; cement 0.08 cr tons |
| Sanghi Q4 EBITDA margin | 20.5%, includes ~₹33 cr of one-off provision write-backs and lower fuel cost |
| Full-year FY24 PAT (Ambuja standalone) | ₹4,738 cr, highest ever |
| Net worth | ~₹51,000 cr; ~₹60,000 cr including April warrant proceeds |