Key Takeaways
- Strong quarter, early commissioning boost: Revenue doubled YoY to INR601 crores and EBITDA margin hit 89%, but the Sikar project is on temporary short-term open access, so full revenue potential awaits a December transmission line.
- Order book swells with storage-heavy wins: 720 MW of new wins this quarter, all bundled with battery storage, taking the under-construction portfolio firmly into FDRE and BESS territory.
- BESS is now a material, near-term earnings stream: 5.1 GWh of battery orders placed, with ~1 GWh set to trade on the merchant market from Q4, targeting an annual EBITDA upside of ~INR170 crores.
- Balance sheet levers are firing: A credit rating upgrade to AA- helped cut interest costs by ~75 bps on INR2,080 crores of debt, with a refinancing path toward 8% that management calls a "significant upside."
- What to watch next quarter: Whether the Narela K3 line goes live in December as CTU expects, the pace of PPA signings for the SJVN and other won-but-unsigned projects, and the first battery deliveries starting in January.
The Sikar Overhang: Early but Incomplete
- Early commissioning, temporary access: The 300 MWh Sikar project was commissioned a quarter early but the Narela K3 connectivity line is delayed, forcing it to operate under short-term open access (STOA) rather than long-term open access (LTOA), which caps revenue until the line is ready.
- December deadline: CTU assessments point to the line becoming operational in December, after which the plant shifts to LTOA and achieves its full revenue potential.
- Curtailment is transmission, not demand: Management clarified that curtailment is solely due to the line delay, and all PPAs carry a must-run clause giving a legal right to full evacuation or full payment for generated power.
- Domestic modules performing: The Sikar plant uses domestic modules and is doing "excellently well" adjusting for the curtailment impact.
Manoj Upadhyay: "We are pleased to say that we have been able to increase the efficiency. By efficiency, I mean reduce the capex and generate the same sort of energy."
Project Wins & BESS Build-Out
The pipeline shifted decisively toward storage: all 720 MW won this quarter are FDRE or solar-plus-BESS configurations, and total BESS orders now stand at 5.1 GWh with deliveries starting in phases from January.
| Win | Details |
|---|---|
| Tata Power (50 MW FDRE) | First PPA with a private discom, bundled with ~250 MWh battery storage. |
| RUMSL Morena (220 MW solar + BESS) | Won at INR2.764/unit, a tariff management calls equivalent to ~INR3.5/unit-plus for a solar-plus-2-hour-BESS configuration, delivering mid-to-high teen risk-adjusted returns. Benefits from non-applicability of ALCM, reduced GST, free nights charging, and bundled park infrastructure. |
| SJVN (450 MW solar + BESS) | Solar generation primarily charges the battery with surplus sold on the power exchange; expected to deliver stronger EBITDA-to-capex yield of ~14-15%. PPA not yet signed but under consideration with states including Punjab. |
- BESS merchant play: Management plans to operate ~1 GWh of BESS on the merchant market from Q4 FY26, targeting an annual EBITDA upside of ~INR170 crores assuming an INR5 price difference between charge and discharge.
- Pilot de-risked the build-out: The 10 MWh pilot BESS project delivered capex reduction, improved round-trip efficiency and discharge rates, reduced installation time, and a lower bill of materials for future projects by testing multiple configurations.
- Long-term service agreements signed: 15-year service agreements with BESS vendors include annual maintenance fees, on-ground personnel, and reserves to guarantee availability and round-trip efficiency.
PPA Risk: Unsigned but Not Unwanted
- Two projects await signatures: The SJVN project (under consideration with states) and an NTPC project where the pooling scheme was cancelled and is now under litigation with Bengal. Management did not give a direct yes/no on cancellation risk for either.
- Government urgency rising: Management noted increased urgency from the central government for states to sign pending PPAs, with new bids coming with pre-demand locked in. ACME has ongoing conversations with four counterparties and is "quite advanced in a couple."
- Storage is now the policy shield: Government guidelines now require storage on all central bids, which management argues makes older solar-only projects the primary cancellation target, not ACME's storage-heavy portfolio.
Nikhil Dhingra: "We are quite hopeful that this will find takers. It's a matter of time. And of course, it's a matter of government policy whether they -- I think each REIA will take their own decision in terms of each PPA. So, it will not be a very uniform that out of 40, 20 have been cancelled or something."
Balance Sheet & Financing
- Rating upgrade unlocks cheaper debt: ACME Solar upgraded to AA- by both CRISIL and ICRA, with 1,100 MW of operational projects also receiving AA- ratings. This drove a ~75 bps reduction on INR2,080 crores of operational debt.
- Refinancing in motion: One operational project refinanced with INR1,100 crores at ~8.4%, with management expecting that rate to come down further. All refinanced debt is floating-rate linked to MCLR plus a 10 bps spread, capturing any downside in the rate cycle.
- Greenfield financing secured: INR7,000 crores for 680 MW of FDRE projects from SBI and REC, structured with buyers credit and LC mechanisms to reduce costs.
- Leverage improving: Net operational debt to EBITDA at 4.3x, net debt to net worth at 1.9x, and DSO dropped to a record low of 27 days as the proportion of central offtake increased.
Nikhil Dhingra: "8% is the typical rate for all the refinances and we are hopeful that we will get all of our portfolios, whichever can be refinanced closer to that rate. And that is a significant upside for us."
Capex, Equity & the Build Plan
- FY26 capex target: INR12,000 crores, with the bulk committed once letters of credit are opened. Battery deliveries starting in January will cause capex to "double/increase" as goods arrive and hit the balance sheet.
- FY27 capex plan: INR12,000 to INR13,000 crores, with management noting that effective rates for both battery and solar have fallen, and a shift to a solar-heavy configuration means the same capex buys "fairly higher capacity than earlier."
- Equity runway: Current cash of INR3,000 crores covers current capex needs, with only a small portion consumed by current projects and the rest reserved for next year. Additional sources include ~INR1,000 crores in undrawn securitization proceeds and 8-10% EPC margin cash flows.
- Battery cash flow to ease equity needs: The 1 GWh merchant BESS operation is expected to generate ~INR170 crores in early revenue, improving profitability and reducing pressure on equity.
Tariffs, Returns & the Bidding Philosophy
- ROCE is the anchor, not tariffs: Management declined to discuss weighted-average tariff trends, calling the metric "misleading unless you adjust for capex," and instead pointed investors to ROCE or EBITDA-to-revenue as the right lens.
- The 14-15% floor: ACME will "always bid for projects with 14%, 15% ROCE," a line management says it "really want[s] to stick to."
- RUMSL illustrates the math: The headline INR2.764/unit tariff is effectively equivalent to ~INR3.5/unit-plus for a solar-plus-2-hour-BESS configuration once the project-specific benefits (no ALCM, reduced GST, free nights charging, bundled infrastructure) are factored in, delivering mid-to-high teen risk-adjusted returns.
- GST reduction is a demand tailwind, not a margin one: The 5% GST regime gives renewables an edge over thermal, but for existing PPAs the benefit passes through to DISCOMs via change-in-law applications. ACME is in touch with DISCOMs on the process.
Nikhil Dhingra: "What guidance we can give you is we will always bid for projects with the 14%, 15% ROCE. That is something we really want to stick to."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY26 commissioning | 450 MW total; 378 MW done, balance 72 MW in advanced stages | Early January |
| Sikar LTOA shift | Narela K3 connectivity line operational, plant moves from STOA to full revenue | December (per CTU) |
| BESS merchant operations | ~1 GWh operating on merchant market, ~INR170 crores annual EBITDA upside at INR5 price spread | Q4 FY26 onwards |
| BESS installation | 5.1 GWh of battery orders installed in phases | Starting Q4 FY26 |
| Operational portfolio EBITDA | Steady-state project-level EBITDA of INR2,025-2,075 crores, 14-15% EBITDA yield | Annual run-rate |
| Refinancing rate target | All refinanceable portfolios brought closer to 8% | No date (ongoing) |
| FY26 capex | INR12,000 crores | FY26 |
| FY27 capex | INR12,000-13,000 crores | FY27 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹601 cr, +104% YoY |
| EBITDA | ₹534 cr, +108% YoY |
| EBITDA margin | 89%, vs 87% last year |
| PAT | ₹115 cr, PAT margin of 19% |
| Net operational debt to EBITDA | 4.3x |
| Net debt to net worth | 1.9x |
| Days sales outstanding | 27 days, record low |
| Operational portfolio | 2,918 MW, capable of annual steady state project level EBITDA of ₹2,025–₹2,075 cr |
| Capacity utilization factor | 24.1%, improved from 22.2% last year |
| Plant and grid availability | Above 99% |
| Generation | 153.9 cr units, +134% YoY |
| Under-construction portfolio | 4.5 GW, including signed PPA capacity of 2.3 GW |
| Total portfolio | 7,390 MW, including 13.5 GWh of BESS capacity and 5,180 MW of PPA signed capacity |
| New project wins during quarter | 720 MW, comprising 50 MW FDRE and 670 MW solar plus BESS |
| Total BESS orders placed till date | 5.1 GWh, expected to be installed in phased manner starting Q4 FY26 |
| Credit rating | AA- by both CRISIL and ICRA |
| Interest rate reduction on existing debt | ~75 bps on ₹2,080 cr debt for operational projects |
| Refinancing of one operational project | ₹1,100 cr at optimized interest rate of ~8.4% |
| Financing secured for greenfield projects | ~₹7,000 cr for 680 MW FDRE projects from SBI and REC |