Key Takeaways
- Capacity-led revenue surge, but below potential: Energy sales rose 37% YoY on 48% capacity growth to 17.2 GW, yet revenue was dampened by seasonal wind dips, grid curtailment, and subdued merchant tariffs.
- Grid evacuation is the binding constraint: Delays in promised 2–3 GW of grid augmentation shifted revenue out of the quarter; management expects relief in coming weeks but the timing remains outside its control.
- Battery storage is the next differentiator: A 3.5 GWh BESS commissions this quarter, with plans to more than double that next year, positioning the company for peak-power arbitrage and the industry shift toward round-the-clock power.
- Conservative bidding insulates returns: Management prices projects assuming commodity costs well above spot, so the recent 10% module price rise and 3x silver increase are manageable within existing return expectations.
- What to watch next quarter: Whether the 2–3 GW Khavda evacuation materializes, the pace of BESS commissioning, and any stabilization in merchant realizations.
Grid Evacuation & Curtailment
- The missed quarter: 2–3 GW of grid augmentation expected in the prior quarter did not occur, shifting revenue out of Q3. In Rajasthan, 1 GW of augmentation was completed in the current month and curtailment there has ceased.
- Khavda timeline: Management expects 2–3 GW of augmentation at Khavda in coming weeks, with an additional 1 GW by end of March. The phrasing is hopeful, not guaranteed: "We are hoping that in this particular quarter, things will pan out as we are seeing."
- Scale creates exposure: Because the company operates in gigawatts, not megawatts, construction must begin well before evacuation infrastructure is ready. When grid augmentation slips, the revenue impact is material and immediate.
- Curtailment compensation: Management stated it is not experiencing curtailment on long-term GNA-connected capacity and declined to elaborate further when pressed.
- Wind PLF decline: Entirely attributable to seasonal wind speeds, not curtailment. H1 had unusually strong wind; Q3 saw a normal seasonal dip.
Raj Kumar Jain: "Industry has made multiple representations how it is not necessarily suitable for renewable sector where a lot of it is based on what weather is there or what it gives us. So similar thing which is there for thermal cannot be an ultimate goal for renewable."
Battery Storage & the RTC Pivot
- 3.5 GWh commissioning this quarter: Management committed to commissioning India's largest single-location BESS by end of this financial year, co-located with solar at Khavda.
- More than 2x next year: The company intends to enhance battery storage capacity to more than double the 3.5 GWh in the coming financial year.
- The arbitrage thesis: Co-located solar plus storage allows the company to capture peak evening power pricing, a "win-win" that also mitigates grid curtailment risk by providing an alternative offtake path.
- Industry shift underway: Management expects the market to move from stand-alone solar toward round-the-clock and peak-power tenders, and sees its early storage investment as a structural differentiator.
- Storage duration: Generic design is 2–3 hours, extendable; management declined to commit to a specific duration, calling it not a design criterion per se.
- Merchant capacity as storage feedstock: The ~20% merchant portfolio can be directed into storage plants at Khavda for evening peak pricing, giving merchant capacity an internal option value beyond spot market sales.
Ashish Khanna: "There is a great arbitrage which is available with us for infusing this power, solar power co-located with the battery storage and then taking full advantage of the peak power pricing from the storage price. So it is a win-win from both sides."
Merchant Power & Realizations
- Tariff pressure: Solar merchant realization fell from ₹2.82 to ₹2.20 per unit YoY; wind from ₹4.15 to around ₹3.5 per unit. RECs are additional to these figures.
- Strategy intact: The company maintains a roughly 20% merchant exposure. More than 1–2 GW of currently infirm power is expected to be operationalized via PPAs in the coming year, and some merchant power will serve as input for battery storage.
- Virtual PPAs: Management is keeping options open, contingent on profitability.
- Merchant tariff pass-through from silver: When asked whether higher silver costs would push up merchant tariffs by reviving DISCOM interest, management noted that DISCOMs were not holding back purely on price and that 42 GW was bid without offtaker backup, but did not directly answer whether tariffs would rise.
Cost Structure & Commodity Risk
- Conservative bidding as the moat: Management prices projects assuming commodity costs well above prevailing spot levels. Module prices were at historic lows last year, but bids factored in much higher module costs. The recent 10% module price increase is therefore manageable.
- Silver exposure quantified: Silver contributes 15–20% of module cost and 10–11% of total project cost. A 3x increase in silver prices impacts returns, but management says conservative costing at bid stage preserves decent returns.
- Execution speed as hedge: 500 MW of modules deployed per month on average; an 18-month typical project timeline is compressed by high execution speed, reducing the window of commodity volatility exposure.
- Group supply chain: Commodity price risk is further mitigated through group company module production and wind turbine manufacturing, with contracts tied up well in advance.
- O&M trajectory: As the portfolio scales, larger capacities at Khavda and Rajasthan will reduce average O&M costs.
Ashish Khanna: "When we make a business case, we don't take into consideration the lowest cost of commodities. We take a very conservative view on the cost of commodities."
Capacity Pipeline & Execution
- 17.2 GW operational, up 48% YoY, reinforcing the company's position as India's largest pure-play renewable platform.
- Khavda at 7.7 GW operational, with one of the world's largest single-location BESS coming in months.
- Chitravathi pumped storage: The Andhra Pradesh hydro project is on track to commission in this calendar year (2026).
- EPC strategy shift: The company is bringing in external EPC contractors to co-develop projects, augmenting internal capacity for the 30 GW roadmap over the next four years.
- 50 GW by 2030: Target reiterated.
- Debt trajectory: Operating debt to run-rate EBITDA at 4.6x, overall at 5.6x; management expects to remain in this range for the next 2–3 years until reaching 50 GW. Debt sanction for approximately nine months of requirements is already in place.
- 40 GW solar PPA cancellation exposure: Management described exposure as "very, very small" and declined to provide specific quantification.
Ashish Khanna: "We do believe that renewable power from a stand-alone solar is going to shift towards a point of RTC power where more and more organizations and including the government will look towards a certainty of this power during the peak time or during -- as a round-the-clock power. And our strategy towards investment and expertise in this particular way will be a differentiator between us and others in this industry."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Grid augmentation at Khavda | 2–3 GW expected in coming weeks; additional 1 GW by end of March | Q4 FY26 |
| Battery storage commissioning | 3.5 GWh at Khavda | End of FY26 (this quarter) |
| Battery storage scale-up | More than 2x the 3.5 GWh | FY27 |
| Chitravathi pumped storage | Project commissioning | Calendar year 2026 |
| Capex | INR 35,000–40,000 crores | FY27 |
| Revenue | INR 17,000–18,000 crores | FY27 |
| Debt-to-EBITDA range | Operating 4.6x, overall 5.6x; remain in same range | Next 2–3 years (until 50 GW) |
| 50 GW capacity target | Firmly on course | By 2030 |
| Infirm power to PPA conversion | More than 1–2 GW operationalized via PPAs | Coming year |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue from power supply | ₹8,508 cr, +25% YoY |
| EBITDA from power supply | ₹7,921 cr, +24% YoY |
| EBITDA margin | 91.5% |
| Run-rate EBITDA (end of FY26) | ₹17,000 cr, including other income of ~₹1,000 cr; ₹16,000 cr from power supply |
| Run-rate revenue (end of FY26) | ₹18,000–19,000 cr |
| Energy sales | 2,760 crore units, +37% YoY |
| Operational renewable capacity | 17.2 GW, +48% YoY |
| Greenfield capacity added in CY25 | 5.6 GW, ~14% of countrywide solar and wind capacity addition |
| Khavda operational portfolio | 7.7 GW of solar, wind and hybrid assets |
| Solar merchant realization | ₹2.20 per unit, vs ₹2.82 in Q3 FY25 |
| Wind merchant realization | ~₹3.5 per unit, vs ₹4.15 in Q3 FY25 |
| Net debt | ₹76,000 cr |
| Operating debt to run-rate EBITDA | 4.6x |
| Overall debt to run-rate EBITDA | ~5.6x |
| Battery storage commissioning target (FY26) | 3.5 GWh, with aim to more than double in FY27 |
| Capex guidance for FY27 | ₹35,000–40,000 cr |