Key Takeaways
- Volume lagged the industry, but the miss is explained: Consolidated volume grew only ~2.3% against a double-digit industry, because July flooding in Himachal and heavy monsoons in central India disrupted the two biggest markets; October rebounded to healthy double-digit growth.
- Cost transformation is delivering ahead of schedule: EBITDA per ton jumped 291% YoY to ₹995, with power and fuel costs down 33% and logistics down 3.1%; the ₹400/ton cost reduction target is partially achieved, and management now expects to raise it to ₹500.
- The Sanghi acquisition fills a strategic gap: The ₹5,000 cr acquisition announced in August brings 100 crore tons of limestone reserves and a West Coast location where Ambuja was undersupplied; it materially de-risks the 14 crore ton capacity target.
- A capex super-cycle is now fully underway: Orders are placed for multiple kilns and grinding units, with ~₹7,000-8,000 cr of capex expected next year as well; the 14 crore ton target by FY28 requires ~10 new kilns and ~35 grinding units.
- What to watch next quarter: Whether the October volume momentum sustains through the seasonally strong H2, the pace of cost reduction as waste heat recovery scales from 90 MW to 170 MW, and the Sanghi integration plan once the deal closes in Q3.
Volume & Demand
- July was the problem month: Severe flooding in Himachal disrupted supply chains from Ambuja's northern capacity, while heavy monsoons in central India hit ACC's key markets; the combined impact pulled consolidated volume growth down to ~2.3% against an industry growing double digits.
- Recovery was immediate and sharp: Post-July, both August and September were good months, and October delivered healthy double-digit growth; management expects the east region to return to 8-10% normal demand growth after November/December once monsoons and the Puja/Diwali period pass.
- Existing capacity can absorb near-term growth: Existing kilns can be optimized another 10%, and residual capacity at Chanda provides headroom; management believes it can meet growth targets of 10-12% per annum on the current base without waiting for new kilns.
- Market share confidence is high: Management stated market share will "easily come up," citing the Sanghi acquisition improving footprint in Gujarat, Mumbai, parts of Maharashtra and the south where Ambuja was previously undersupplied with strong demand.
Ajay Kapur: "We had not a very good July month. As you know, large part of our capacity north in Himachal, it was seriously flooded. It had some supply chain impact in the month of July. I think we also had very heavy monsoons in the central India. So this is the two very big markets for ACC and Ambuja combined."
Cost Transformation
- Power and fuel costs collapsed 33% YoY to ₹1,425/ton: The decline was driven by waste heat recovery expansion from 40 MW to 90 MW, captive coal mine improvements, better fuel mix, increased alternate fuels, green energy focus, and the global fuel price decline.
- Logistics costs fell 3.1% to ₹1,377/ton: Lead distance reduction from 175 km to 165 km, warehouse optimization lifting direct dispatches from 44% to 49%, higher rail coefficient, route planning, L1 sourcing, renegotiation, and GPS-based measures all contributed; 25 bulk rakes were ordered for fly ash transport.
- Other expenses dropped 13.5% to ₹829/ton: Streamlining into a single entity with a single executive team removed redundancies between Ambuja and ACC; technical know-how fees both companies were paying at 1% to Astral Olsen have been reduced.
- The ₹400/ton target is a moving goalpost: Approximately ₹100/ton has been achieved so far, with waste heat recovery ~50% complete, coal mine strategies ~30-40% done, and other expenses already shaved ~₹100/ton; management now says the target will increase to ₹500/ton by the time ₹400 is hit.
- Green energy and remaining waste heat are the next leg: The remaining 60-70 MW of waste heat recovery is yet to be commissioned, with each MW delivering power at ₹1 versus grid cost of ₹6 and captive cost of ₹6.50-7; a 200 MW captive renewable facility at Khavda, Gujarat is expected ready by end of the current financial year, with green energy impact playing out after March '24.
- Logistics savings have a long runway: Only 25-30% of the logistics savings target has been achieved, with 70% still to come; the target is to bring average primary road lead distance down to ~100 km from the current 165 km.
Ajay Kapur: "I would say straight away 3% to 11% waste heat. So that much extra straight away comes on the power. Coal, we are already seeing also some strategies working with the Group companies... I would say already a part of it is coming in. But I think a large part of it will come in over the next 12 months to 36 months."
Capacity Expansion
- The 14 crore ton target by FY28 is now fully resourced: Achieving it requires ~10 new kilns adding ~4 crore tons of clinker capacity and ~35 new grinding units; three kilns will be commissioned by end of FY26, with the remaining seven coming through organic growth in FY27 and the first half of FY28.
- Sanghi dramatically de-risks the math: The acquisition brings 6.6 crore tons of clinker capacity that can go to 7.2 with minimal investment, plus the potential for another 4 crore ton kiln at the same location; adding these to the existing footprint gets the company ~70% of the way to the 14 crore ton target, leaving only two new greenfield sites of 0.4 crore tons each to open.
- Ametha is online, and the grinding unit pipeline is locked: The Ametha integrated unit in Madhya Pradesh was commissioned, adding 0.33 crore tons of clinker capacity; two grinding units mapped to Bhatapara clinker (Sankaren, Kolkata and Farakka) are expected by Q3 FY25, two mapped to Chandrapur clinker (Jalgaon and Amravati) in ~24 months, and Salai Banwa, UP by Q1 FY26.
- Clinker lines are on a staggered schedule: Bhatapara clinker equipment is ordered with civil execution started, targeting Q2 FY26 completion; the Maratha clinker line at Chandrapur has an LOI placed on the EPC vendor with site development underway, targeting Q4 FY26, pending environmental clearance and consent to establish expected this quarter.
- Capex intensity stays elevated next year: Management expects next year's capex to be in a similar range of ₹7,000-8,000 cr, with some current projects rolling in, some fresh capex starting, and the next stage of growth yet to be announced; formal guidance for the next financial year will be given at year-end.
Ajay Kapur: "If you add Sanghi 6.6, which is actually 7, add another Sanghi at another 4, we are almost, I think, 70% there already. I need to just open up 2 new sites of 0.4 crore each and I'm done."
Sanghi Acquisition
- The deal is a strategic fit on two fronts: First, it is a great asset at a great location, synergistic within the existing ecosystem; second, it holds 100 crore tons of limestone reserves, enabling clinker capacity expansion in a location that serves the West Coast where Ambuja was undersupplied.
- Integration will follow the Ambuja-ACC playbook: Post-acquisition, Ambuja and ACC will remain the two main brands, with Sanghi's cement business run through them; regional brands acquired will be leveraged, and a similar MSA arrangement as between Ambuja and ACC will be put in place.
- The asset has significant low-cost upside: Sanghi's 0.66 crore ton clinker capacity can be expanded to 1 crore tons of cement with very little investment; the acquisition is expected to close in Q3 of the current year, with a detailed plan to be shared after completion.
- Management declined to discuss pre-close utilization: When asked if Sanghi assets are being used on a tolling basis before the deal closes, management stated it does not speak about a company not yet part of the ecosystem.
Ajay Kapur: "The Sanghi acquisition has two underlying strategies. First, it is a great asset at a great location and is very synergistic within our own ecosystem. Number two, it has 100 crore tons of limestone reserve, which allows us to increase clinker capacity in a very good location to help us cater to the West Coast."
ACC Turnaround
- The margin gap is structural and narrowing: ACC and Ambuja traditionally had a 4-5% margin gap; when acquired last September, ACC was at near-zero or negative margin, and the movement has been structurally in the right direction with both companies now sharing the same coal, raw material, and sales/pricing leadership.
- July flooding hit ACC disproportionately hard: ACC has only one grinding unit at Gagal in Himachal with a tolling arrangement with Asian, while Ambuja has four grinding units in the North (Roper, Bhatinda, Dadri, Roorkee); when Himachal flooded, ACC's entire northern grinding capacity was concentrated at the disrupted site.
- Legacy plants are being addressed structurally: Each legacy ACC plant is being evaluated for replacement by a new kiln next door, investment to upgrade, or mothballing if neither option works; management expects the catch-up to be "even sharper in time to come."
- Management declined to split MSA profitability: When asked for ACC's production numbers under the MSA and a revenue split on what ACC produces versus sells, management declined to answer on the call, citing time constraints and offering to take the question offline.
Ajay Kapur: "ACC did have legacy plants in the past. And we are structurally looking at each of the legacy plants. And either those plants would be replaced by new kilns next door or we are going to either make investment or if nothing else, we will mouth ball them."
Financial Health
- EBITDA per ton surged to ₹995, up 291% YoY: The jump was driven by revenue growth and cost reductions across energy, freight, and other expenses; EBITDA margin expanded 12.9 percentage points to 17.5%.
- Working capital improved overall: Receivables increased due to the shift from year-end to half-year closing but remain at 12 days of turnover; payables improved, and overall working capital moved favorably.
- Coal advances have been fully squared: Ambuja's coal advance became zero last quarter, and ACC's became zero in the current quarter, removing a legacy cash drag.
- The sustainable EBITDA target is ₹1,450-1,500/ton: Management set 36 months as the upper limit to reach this level, contingent on completing new lower-cost kilns, new grinding units to reduce lead distance, culmination of long-term raw material contracts, completion of current waste heat recovery and green energy projects, optimization initiatives, and the best power mix at each plant.
Ajay Kapur: "36 months from now, because you understand, I have to complete some of the new kilns, which are lower cost... Maybe earlier, but I think you can take 36 months as the last upper limit of that."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cement production capacity | 14 crore tons | By FY28 |
| Cost reduction target | Over ₹400/ton, increasing to ₹500/ton | Large part over next 12-36 months |
| Waste heat recovery capacity | 170 MW (from 90 MW currently) | By March '25 |
| Captive renewable power facility | 200 MW at Khavda, Gujarat | By end of current financial year |
| Coal self-sufficiency | 40-50% of current requirement from two captive mines | No date; mines won |
| Average primary road lead distance | ~100 km (from 165 km currently) | No date |
| Sanghi acquisition close | Deal completion | Q3 current year |
| Sankaren & Farakka grinding units | Commissioning | Q3 FY25 |
| Salai Banwa grinding unit | Commissioning | Q1 FY26 |
| Bhatapara clinker line | Commissioning | Q2 FY26 |
| Maratha (Chandrapur) clinker line | Commissioning | Q4 FY26 |
| Jalgaon & Amravati grinding units | Commissioning | ~24 months from Nov 2023 |
| Sustainable EBITDA per ton | ₹1,450-1,500 | 36 months as upper limit |
| Capex next year | ~₹7,000-8,000 cr | FY25; formal guidance at year-end |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Consolidated revenue | ₹7,424 cr, +4.1% YoY |
| Consolidated realization | ₹5,334 per ton, +0.9% YoY |
| Consolidated EBITDA (excl other income) | ₹1,302 cr, +298% YoY |
| Consolidated EBITDA per ton (excl other income) | ₹995, +291% YoY |
| Consolidated EBITDA margin | 17.5%, expanded 12.9 ppt YoY |
| Ambuja standalone net revenue | ₹3,970 cr, +8% YoY, in line with volume growth of 7.3% |
| Ambuja standalone EBITDA (excl other income) | ₹773 cr, +147% YoY |
| Ambuja standalone EBITDA per ton | ₹1,020, +130% YoY |
| Ambuja standalone EBITDA margin | 19.5%, expanded 11 ppt YoY |
| Ambuja standalone PAT | ₹644 cr, +364% YoY |
| Power and fuel cost per ton | ₹1,425, -33% YoY from ₹2,134 in Q2 FY23 |
| Logistics cost per ton | ₹1,377, -3.1% YoY from ₹1,421 in Q2 FY23 |
| Other expenses per ton | ₹829, -13.5% YoY |
| Cost optimization achieved vs ₹400/ton target | ~₹100 of the ₹400 target achieved, with ₹300 more to go; target expected to increase to ₹500 |
| Capex spent | ₹1,101 cr, from internal accruals and cash |
| Cash and cash equivalents | ₹11,721 cr as on Sep 30, 2023 |
| Waste heat recovery capacity | 90 MW, up from 40 MW at takeover; target 170 MW by Mar '25 |
| Captive renewable power generation planned | 200 MW, construction started at Khavda, Gujarat; expected ready by end of FY24 |
| Average primary road lead distance | 165 km, reduced from 175 km in Q2 FY23 |
| Direct dispatch to customers | 49%, up 5 ppt YoY |
| Rail coefficient | 28%, up 2 ppt YoY |
| Premium products as % of trade sale volume | 23.4%, +0.8 ppt YoY |
| Blended cement as % of total sale volumes | 89% |
| MSA sales volume (Ambuja and ACC combined) | 0.24 cr tons, ballpark 0.12 cr each |
| Clinker production (H1 FY24) | 1.74 cr tons |
| Sanghi acquisition enterprise value | ₹5,000 cr, fully funded through internal accruals; expected to close in Q3 FY24 |
| Ametha integrated unit clinker capacity addition | 0.33 cr tons per annum, commissioned |
| Bhatapara clinker facility (0.4 cr tons) expected completion | Q2 FY26 |
| Maratha clinker line (0.4 cr tons) expected completion | Q4 FY26 |
| Sankrail and Farakka grinding units expected completion | Q3 FY25 |
| Salai Banwa grinding unit expected completion | Q1 FY26 |
| Limestone reserves won (10 new mines) | 58.4 cr tons total estimated reserves |
| Target sustainable EBITDA per ton | ~₹1,450, expected within 36 months |
| ACC EBITDA per ton gap vs Ambuja | ₹345 per ton, widened from ~₹220 last quarter |
| Current year capex guidance | ~₹7,500 cr total, ACC ~₹2,500 cr, Ambuja ~₹5,000 cr |