- Trade pivot is working, volume still flat: Trade volume grew +8.6% YoY and trade share hit 74%, but overall volume was flattish because negative-EBITDA institutional volumes were deliberately sacrificed.
- Cost reduction is the margin story, not price: Total cost was INR4,410/ton, but management targets INR4,250 for FY27 and INR4,000 for FY28, driven by green power, logistics efficiency, and fuel mix shifts rather than price hikes.
- Acquired assets are a drag today, a lever tomorrow: Penna and Sanghi are running at only ~50% utilization, which management calls "my pain"; a turnaround in H2 is expected to unlock volume growth and cost efficiencies.
- A massive capex cycle is fully funded and underway: INR14,500 crores for 3 crore tons of capacity is self-sustainable from cash flows; equipment is ordered, PMC appointed, and first-wave commissioning is nearly complete.
- What to watch next quarter: Whether Penna and Sanghi utilization actually ramps, whether trade growth accelerates as management is betting, and whether drought in key states begins to soften demand.
The Trade Pivot: Sacrificing Volume for Value
- Deliberate B2B retreat: Negative-EBITDA institutional volumes were cut, which made overall volume growth negative in Q1 and flattish in Q2 even as trade turned positive at +8%. Management says both trade and B2B will turn positive from Q3 onward as costs come down and institutional business regains viability.
- Trade share jumped 6pp to 74% because of a conscious value focus and preference for trade channels where strong brands and supply chain networks command better realization.
- Premium product share rose to 37% of trade sales from 35% last year, reflecting the premiumization push alongside the trade shift.
- Realization held at INR255/bag in a lean monsoon quarter, with INR10/bag realized in October; blended realization growth in H1 was the lowest versus peers despite the trade mix improvement, but management says the journey has started and benefit will compound.
- Trade mix value benefit is currently ~INR40/ton extra and is expected to reach ~INR150/ton cumulative by June, adding roughly INR40/ton each quarter for the next 2–3 quarters.
Bahety: "In fact, I would say that to our management expectations, we have much more larger potential. And therefore, I would up my bet on a higher degree of trade growth in Q3 and Q4."
Cost Structure: The Real Margin Engine
- Total cost was INR4,410/ton in Q2, or INR4,182/ton normalized for geopolitical conflict impact; management targets INR4,250 for FY27 and INR4,000 for FY28, with the improvement coming overwhelmingly from cost rather than price.
- Fuel cost rose to INR1.87 per 1,000 kcal from INR1.60 last year and INR1.66 in Q1, driven by higher energy costs and domestic coal constraints; the fuel mix improved with a higher share of domestic coal versus high-cost pet coke, and group synergy helps mitigate aberrations.
- Spot imported fuel is now INR2.80–2.85/kcal; at Q2 levels the spot blended cost would have been ~INR2.2, so the INR1.87 achieved reflects successful domestic coal consumption to control escalation amid the Middle East crisis.
- Green power share reached 61% (including both consumption and sales), with net power cost down to INR4.8/unit from INR6 in Q2 FY26; revenue from green power sales was ~INR136 crores in Q2.
- Logistics costs were moderately higher YoY on diesel, partly offset by a primary lead reduction from 265 km to 254 km; further lead reduction is expected in Q3 and Q4 as new facilities closer to customers ramp up.
- BCFC infrastructure for fly ash movement is implemented and expanding, supporting raw material cost reduction; a three-pronged fly ash strategy (use in cement, sell in market, move into value-added products) is value-accretive.
- H2 cost improvement of ~INR160/ton is expected, with a path from INR4,410 in Q2 to ~INR4,150 in Q4 FY27, a ~INR250/ton reduction driven by domestic coal, WHRS, AFR, and BCFC efficiencies.
Bahety: "Prices will be there. It will be as per the market sentiments and forces. But I think what we are looking at a journey of improving our profitability is largely on the cost piece."
Acquired Assets: The Utilization Overhang
- Penna and Sanghi are operating at ~50% utilization, which management acknowledges as "my pain" and is addressing; the opportunity to improve in Q3 and Q4 is a key driver of the H2 volume growth outlook.
- Sanghi turnaround is imminent: both kilns are "absolutely up and running," and management promises "very substantial improvement in utilization and cost efficiencies" with a "complete turnaround coming." Penna is expected to follow a similar trajectory.
- Vintage asset recalibration: some high-cost, low-efficiency legacy units (e.g., Jamul) will be phased down, with adequate clinker from eastern plants redirected to sustain more efficient grinding units closer to markets.
- Some very high-cost grinding units have been temporarily closed, with an opportunity to relook at others down the line; surplus grinding capacity post-expansion gives flexibility to pick the right markets.
- H2 volume growth is expected at higher single digits, with an effort to move above double digits, driven partly by improving Penna and Sanghi utilization plus newly commissioned capacities.
Bahety: "Jashandeep, you are absolutely right. That is also my pain as well as of now, and which we are addressing it."
Capacity Expansion: The 3 Crore Ton Program
- First wave nearly complete: 0.46 crore tons commissioned in Q2 across Dahej, Salai Banwa, and Kalamboli; 0.32 crore tons at Bathinda and Jodhpur/Penna stabilized; Warisaliganj (0.24 crore tons) to commission in H2.
- Second wave fully prepared: equipment already ordered, PMC consultant appointed, preparatory and background work completed, giving confidence in a 14–18 month execution timeline; debottlenecking projects with Loesche are progressing and expected to complete in 4–5 months.
- INR14,500 crores total capex for 3 crore tons, roughly INR7,500 crores per year, self-sustainable from business cash flows over 3 years; FY27 capex is INR6,500–7,000 crores total with INR3,000–3,500 crores in H2.
- Capacity targets: 140 MTPA by FY28 (hitting 149 MTPA by FY29), then 155 MTPA by FY30; new capacities bunch with almost 20 MTPA coming between March and May 2028.
- Expansion is 50% weighted to West (high-EBITDA markets like Kalyan, Dahanu, Amravati), with the balance in East and North; all are value-accretive, brownfield, and designed for efficient manufacturing cost.
- Construction timelines: ~14 months for a grinding unit, ~18 months for an integrated unit; most announced projects are eligible for state-level fiscal incentives, with Northeast and UP carrying a higher degree.
- Clinker utilization was 75% and cement utilization 67% in FY26, indicating excess grinding capacity already exists; the expansion adds further flexibility.
Bahety: "This quarterly performance is not influencing our decisions of capex, first of all."
Market Position: Value and Share, Both
- Market share will not be sacrificed: management is explicit that it will focus on market share in a calibrated manner with a clear eye on value, calling both achievable simultaneously.
- Brand equity of Adani Cement is "significantly higher" per independent surveys, helping the delta improvement in price and realization.
- Blended cement share improved from 77% to 82%, with an effort to sustain an 80-20 blended-to-OPC ratio; fly ash availability gives an advantage, and blended cement is also going into institutional business.
- Regional trade volume growth was broad-based: North +13%, Central +9%, West +14%, South +13% YoY; East was broadly in line with last year.
- Ready-mix concrete volume rose 19% YoY to 0.11 crore cubic meters, with a network of almost 125 plants and growth expected to accelerate.
- Working capital cycle improved by 10 days on better receivables and inventory management, an improvement expected to sustain and further help profitability.
- Drought risk flagged: drought has been declared in Maharashtra, Karnataka, Andhra, and Rajasthan; management expects repercussions with some lag, and while Q3 and Q4 will pass through, some states may moderate their construction cycles.
Bahety: "Market share also, for example, I'm reemphasizing, will be a priority without losing market share, but with a clear eye on value. I think these are both achievable. It's not like typically one would have expected that."
Operational Levers: Technology, Logistics, Partnerships
- Digipin master database has been successfully mapped pan-India, completely revamped from historical ACC and Ambuja data, enabling logistics efficiency.
- CINOC (Cement Intelligent Network Operating Center) is operational and already helping on logistics; combined with Digipin, technology is expected to deliver substantial efficiency gains.
- Vendor partner ecosystem is becoming a defining part of operations: new grinding units at Kalamboli, Salai Banwa, Bathinda, Penna Jodhpur, and Dahej are all operationalized with vendor partners under SLAs; logistics SLA journeys have started in 5 plants.
- 400 electric vehicles are to be stationed and operating by March 2027, with operations already starting at Sanghi and Ambujanagar.
- 18 MW WHRS at Sanghi is coming in Q3, adding to the green power and cost reduction toolkit.
- Long-term agreement with group thermal power plants secures fly ash supply at competitive landed cost, supporting the blended cement advantage.
- Merger progress: ACC and Orient Cement mergers are proceeding to NCLT for final approvals, with completion expected within this financial year and expected to be EPS accretive; the low tax rate in Q2 partly reflects the tax shield from the Penna and Sanghi mergers.
Bahety: "This is like one asset which I'm going to give you some very good development on the complete turnaround. And likewise, let me again reiterate, so is Penna."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | Grow ahead of industry; higher single-digit, effort to move above double-digit | H2 FY27 |
| Trade and B2B trajectory | Both trade and B2B to turn positive | Q3 and Q4 FY27 |
| Cost target | INR4,250/ton (barring further global market escalation) | FY27 |
| Cost target | INR4,000/ton for entire combined capacity | FY28 |
| Q4 exit cost | ~INR4,150/ton (from INR4,410 in Q2) | Q4 FY27 |
| H2 cost improvement | ~INR160/ton reduction | H2 FY27 |
| Capacity target | 140 MTPA (on path to 149 by FY29, 155 by FY30) | FY28 |
| FY27 exit utilization | 75% or closer to 75% | FY27 exit |
| Penna and Sanghi utilization | Substantial improvement; complete turnaround | Q3 and Q4 FY27 |
| Merger completion | ACC and Orient Cement into Ambuja, EPS accretive | Within FY27 (subject to NCLT) |
| Warisaliganj commissioning | 0.24 crore tons | H2 FY27 |
| Debottlenecking projects | 4 projects with Loesche completed | 4–5 months |
| Electric vehicles | 400 EVs operating | By March 2027 |
| Trade mix value benefit | INR150/ton cumulative benefit | By June (~2–3 quarters) |
| Capex | INR6,500–7,000 cr total; INR3,000–3,500 cr in H2 | FY27 |
| Capex | ~INR7,500 cr each | FY28 and FY29 |
| Blended-to-OPC ratio | Sustain 80-20 | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹9,197 cr |
| Operating EBITDA | ₹1,271 cr |
| EBITDA margin | almost 14% |
| EBITDA per metric ton | ₹770 |
| Profit after tax | ₹236 cr |
| Cement sales volume | 1.65 crore metric tons |
| Total cost per metric ton | ₹4,410; normalized to ₹4,182 excluding geopolitical conflict impact |
| Fuel cost per 1,000 kcal | ₹1.87, vs ₹1.60 in Q2 FY26 and ₹1.66 in Q1 FY27 |
| Net power cost per unit | ₹4.8, vs ₹6.0 in Q2 FY26 and ₹4.3 in Q1 FY27 |
| Trade volume growth | 8.6% YoY |
| Trade share | 74%, up 6 percentage points YoY |
| Premium product share of trade sales | 37%, up from 35% last year |
| Blended cement share | 82%, up from 77% last year |
| Green power share | 61%, includes both consumption and sales at company level |
| Ready-mix concrete volume | 0.11 crore cubic meters, up 19% YoY; network of almost 125 plants |
| Net worth | ₹72,238 cr |
| Cash and cash equivalents | ₹1,070 cr |
| Capacity utilization | around 61–62% |
| Primary lead | 254 km, reduced from 265 km |
| Working capital cycle improvement | 10 days |