Key Takeaways
- Cost peak hit, relief promised: Total cost touched INR4,500/tonne in Q4, which management calls the peak. A decline of at least INR150–200 is expected, but Q1 FY27 stays flattish at that level before reductions accelerate.
- Acquired assets are the drag: Sanghi and Penna ran at just 57% and 46% utilization, with breakdowns and higher maintenance eating into margins. Excluding them, Ambuja and ACC’s normalized EBITDA/tonne is INR70–80 higher.
- Volume growth decoupled from industry: FY26 annual volumes jumped 16% to 7.37 crore tonnes, but Q4 was flattish YoY. FY27 guidance is a moderate 8% growth to ~8 crore tonnes, prioritizing value over volume.
- Capex discipline reset underway: After contractor and engineering missteps delayed projects, the company is pausing new starts to complete engineering first. FY27 capex is pegged at INR6,000–6,500 crore.
- What to watch next quarter: Whether the INR4,500 cost actually begins to decline, any improvement in Sanghi/Penna utilization, and if subdued April–May demand firms up enough to support even a partial price pass-through.
Cost: The Peak and the Path Down
- Q4 cost stuck at INR4,500: The March quarter average matched the December quarter, erasing hopes of a quick drop. March month exit cost was INR4,100 on a normalized basis, but one-off blows from the West Asia conflict, packing bag price spikes, and acquired-asset breakdowns added back roughly INR250–400.
- What blew up the quarter: Higher branding spend to push trade sales, elevated repairs and maintenance on Penna assets, West Asia disruption in late February–March, packing bag cost increases mid-March, longer freight leads, lower government incentives as some plants exhausted benefits or shifted to accrual accounting, and heat consumption 35–40 kcal above target.
- The INR4,000 confusion: Management clarified that the INR4,000 figure discussed on the Q3 call was an aspirational exit-month target for March, not the quarterly average. The quarter never got below INR4,500.
- Cost reduction commitment: Management targets a minimum INR250/tonne reduction in FY27 and another INR250 in FY28, driven by raw material savings (fly ash, green energy) and operating leverage. The earlier INR3,650/tonne ambition is not abandoned, only deferred.
- Q1 FY27 stays heavy: Cost headwinds persist, so Q1 FY27 cost will be roughly flat at INR4,500/tonne. The INR250 decline for the full year must therefore compress into the remaining three quarters.
Vinod Bahety: "I strongly believe that, yes, this is like the peak which we have hit and should see a progressive improvement."
Acquired Assets: The Turnaround That Hasn’t Yet Turned
- Utilization is the problem: Sanghi ran at 57% and Penna at 46% in Q4, well below viable levels. Together they represent 1.9 crore tonnes of capacity that is diluting consolidated margins.
- Penna’s hidden decay: The acquired assets required far more maintenance capex and upkeep than expected, with machine shutdowns and breakdowns in the March quarter. Management acknowledged that repairs which should have been done previously were not done, contributing to the failures.
- The margin gap is material: Normalized EBITDA per tonne for Ambuja and ACC excluding the acquired assets is INR70–80 higher, implying the standalone business is already at or above INR800/tonne while the acquired units drag the consolidated figure down.
- Utilization target: Management aims to lift Sanghi and Penna utilization by 5–10 percentage points in FY27, a recovery that is entirely within its control and central to the cost-reduction math.
- Sanghi’s structural fix: Over the next three years, Sanghi will pivot predominantly to clinker production, feeding new coastal grinding units in Gujarat (e.g., Dahej Line 2). Seven vessels have been ordered for the marine infrastructure, with deliveries starting next year.
Karan Adani: "And based on whatever guidance we are giving, this is 100%, which is controllable by us. And if we are not able to achieve the guidance, it's purely because of our internal execution and not any other factor."
Demand and Pricing: Subdued, with No Quick Fix
- Demand softening: April and May are looking subdued and soft, consistent with management’s view that industry growth will run at only 5–5.5% in FY27 given inflation and a weak monsoon.
- Pricing power absent: Despite cost increases, the industry could not pass on prices in Q4. Modest improvement of roughly INR10/tonne was seen, with INR15–20 in select pockets. Management would be happy with even half of any cost pass-through in the current environment.
- Realization lagged peers: Ambuja’s Q4 realization was flat QoQ while peers improved 1.5–2%. Management said the journey of changing gears has just begun and differentiated benefits will show in subsequent quarters, without quantifying the mix impact.
- Volume strategy shifts to value: FY27 volume guidance of ~8 crore tonnes (8% growth) is deliberately moderate, prioritizing trade sales and premium product mix over chasing tonnes. Premium products sit at 35–36% of trade, a level management considers sustainable.
Vinod Bahety: "I anticipate the overall demand looks to be for right now, when I look at, say, April and now in May, a little subdued and soft. Therefore, for example, when you attempt for, say, X, I would be happy even if the industry gets half of the same."
Capex and Capacity: A Deliberate Slowdown
- Why projects slipped: Management admitted to three root causes: wrong contractor selection, projects launched immediately post-acquisition when no team was in place, and projects started without full engineering. The fix is a six-month engineering-complete-before-start rule for all new projects.
- FY27 capex envelope: INR6,000–6,500 crore, with INR400 crore already under execution. The balance covers debottlenecking, maintenance, and ongoing capacity additions. Annual capex of INR6,500–7,000 crore is planned for the next two years.
- Capacity target deferred: The FY28 capacity target could slip by a year or two, to FY30 on a safer basis. Management said the exact timeline “doesn’t really matter” because the priority is ramping up volume from existing assets, not hitting a date.
- New clinker in the pipeline: A clinker line at Mundra (0.2 crore tonnes) and a limestone block in Assam (0.2 crore tonnes) are targeted for completion in 24–28 months. These are greenfield additions that improve logistics by placing clinker capacity closer to coastal and eastern markets.
- Logistics recalibration: Integrated units are traveling longer distances than optimal. The plan is to shut down grinding units in some locations and move them closer to markets. Bihar, currently supplied from Chhattisgarh, will get its own grinding units while Chhattisgarh becomes clinker-only.
- Project IRR discipline: All capex is held to an 18% project IRR threshold on an all-equity basis.
Karan Adani: "we did not choose the right contractor for execution... we started these projects when we acquired Ambuja and ACC. And at that time, there was no team... a lot of these projects were started without full engineering being done in place."
Operational Levers: The Five-Point Plan
- Management’s 80/20 focus: Karan Adani outlined five disciplines, with cost dominating at roughly 80% of the effort. The other four: L1 plants delivering to their designated markets, trade versus non-trade sales mix, raw material consumption efficiency, and channel network improvement.
- SLA-based plant operations: The company is deploying third-party SLA partners to run plants, a model that helps clean up legacy union issues and improve efficiency. Management believes enough competent partners now exist in India to operate plants at the desired efficiency levels.
- Premium mix steady: Premium products at 36% of trade sales is considered a sustainable level; the focus is on maintaining rather than stretching this share.
- Working capital cleanup: Non-core working capital items, including some government incentives, will now be booked on an actual-receipt basis rather than accrued. ACC’s negative operating cash flow reflects receivables from Ambuja under the MSA, which will be knocked off via an ICD in the coming quarter.
- Debottlenecking continues: The 1.5 crore tonnes of debottlenecking exercises across assets remain in progress, though the timing will vary based on return on investment.
Karan Adani: “we are not moving away from the target. Yes, we are moving away from the time line.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cost reduction | Minimum INR250/tonne decline from the INR4,500 peak | FY27 (full year average INR4,250) |
| Cost reduction | Additional INR250/tonne decline | FY28 |
| Volume growth | ~8 crore tonnes consolidated (8% growth) | FY27 |
| Acquired asset utilization | Increase Sanghi and Penna utilization by 5–10 percentage points | FY27 |
| Capex spend | INR6,000–6,500 crore | FY27 |
| Capex spend | INR6,500–7,000 crore annually | FY27 and FY28 |
| New clinker capacity | Mundra (0.2 mt) and Assam (0.2 mt) commissioned | 24–28 months |
| Sanghi recalibration | Move predominantly to clinker production, feed coastal grinding units | Over the next 3 years |
| Q1 FY27 cost | Flattish at ~INR4,500/tonne, reduction accelerates thereafter | Q1 FY27 |
| Project IRR threshold | 18% on all-equity basis | Ongoing |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | Not stated |
| Sales volume | 7.37 crore tonnes for FY26, up 16% YoY; Q4 volumes grew ~10% YoY per investor deck, flattish adjusted for Orient Cement (per an analyst's math) |
| EBITDA | ₹6,539 cr for FY26, up 31% YoY; ₹887 per metric ton, up 12% YoY |
| PAT | ₹2,647 cr for FY26, up 17% YoY |
| EBITDA per ton (Ambuja and ACC, ex acquired assets) | ~₹800, normalized; acquired assets dragged consolidated figure lower by ₹70–80 |
| Cost per ton | ₹4,500 for Q4, flat vs Q3 FY26; includes ~₹250 of West Asia war-related escalation; March month was ₹4,100 excluding that escalation |
| Cost per ton (FY26 full year) | ₹4,400, ~10% above the ₹4,000 target |
| Realization per bag | ₹254, up ~₹1 QoQ; down from ₹255 YoY |
| FY27 volume guidance | ~8 crore tonnes, ~8% growth YoY |
| FY27 industry growth expectation | 5% to 5.5% |
| Cement capacity (end of FY26) | 10.9 crore tonnes; clinker capacity 6.9 crore tonnes |
| Capacity addition in FY26 | 1.07 crore tonnes of grinding capacity and 0.7 crore tonnes of clinker capacity commissioned |
| Capacity target (end of FY27) | ~11.9 crore tonnes |
| Trade sales share | 74% in Q4, up from 68% in Q3 FY26 |
| Premium cement share of trade sales | 36% in Q4; 35% for FY26 |
| Green power share | 32% in Q4, up from 26% prior |
| Sanghi capacity utilization | 57% |
| Penna capacity utilization | 46% |
| Capex (FY26) | ~₹7,500 cr |
| Capex guidance (FY27) | ₹6,000 cr to ₹6,500 cr |
| Cost reduction target (FY27) | ₹250 per ton reduction from the ₹4,500 peak, targeting ₹4,250 average for FY27 |
| Cost reduction target (FY28) | Additional ₹250 per ton reduction |
| RMC EBITDA (FY26) | ~₹300 cr for full year; ₹102 cr in Q4 |
| Branding and advertisement cost (FY26) | ~₹70 per ton |
| Clinker factor | 65% in Q4, improved from 67% in Q3 |
| Industry cement price movement (Q4) | ~₹10 per bag increase in most areas; ₹15–20 in selected geographies |
| Cost escalation from West Asia conflict | ~₹25 per bag, or ₹400–500 per ton on a full-blown basis |