Key Takeaways
- Worst quarter behind, inventory overhang cleared: Q4 FY23 was the most challenging quarter, driven by a global inventory overhang that has now been completely extinguished. Management stated this quarter should not be repeated.
- ATC and Blue business pivot to break-even: The ATC yellow line is full, and the Blue business has purged high-cost inventory. Both are expected to reach EBITDA break-even in Q1 FY24, removing a major drag on consolidated performance.
- AZO is the new growth engine: The Dahej AZO facility is ramping up with month-on-month volume improvements that are “not 5%, 10%,” targeting a turnover jump from ₹41 crores to ~₹90 crores in FY24, driven entirely by the domestic market.
- Debt to peak before consolidation: Debt will peak at ₹210 crores to fund the final two projects, after which the company enters a 1.5–2 year consolidation phase with no new capex and a focus on de-levering.
- What to watch next quarter: Whether the promised Q1 FY24 EBITDA break-even for Blue and ATC materializes, the pace of AZO’s domestic volume ramp-up, and any concrete order conversion from European customers signaling a demand recovery.
The Inventory Overhang: A “Scary” Buildup, Now Cleared
- Root cause of the loss: A significant portion of FY23’s poor performance came from an inventory overhang at higher prices, which was the predominant factor affecting profitability. Inventory levels for the Blue business were abnormally high in the Oct-Dec 2022 period.
- Global supply chain glut: European customers built up a massive inventory overhang described as “scary,” causing demand from large customers like Clariant/Heubach, Sun, and Siegwerk to be “almost not there” in the Dec quarter and “very weak” in the Jan-Mar quarter.
- Overhang resolved: High-cost inventory has been completely extinguished, and Asahi’s own inventory levels are now lower than they have been in the past five years. The global supply chain overhang has also been wiped out.
- Recovery signal: European customers are starting to show an order pipeline improvement in the Apr-Jun quarter, with Clariant (now Heubach) particularly likely to improve offtake after shifting manufacturing to India.
Gokul Jaykrishna: “I've never seen anything like this in my entire 20-25 years in the industry. So that was actually honestly, probably the buildup was scary. I mean, that was the word. But luckily that buildup has completely been taken care of.”
Blue Business: A Cash Cow Under Pressure
- Demand collapse in exports: Export markets, particularly Europe, dried up completely in H2 due to the Ukraine-Russia conflict. Energy costs in Europe tripled, reducing spending power and consumption. US demand was also not very strong. The Blue business is ~70% exports.
- Competitive pressure at home: Indian manufacturers have become the global supplier of Blue, killing Chinese competition to the extent that China imposed an anti-dumping duty on Indian Blues. Competitors who previously exported to China shifted pressure to the local market, driving pricing below cost for all industry participants.
- Anti-dumping fight: A group of Indian pigment manufacturers jointly hired a lawyer to fight China’s duty. It has been reduced by 2% so far to 14.2%, with continued efforts to reduce it further.
- Long-term view: Management does not expect 10% CAGR growth from the Blue business, viewing it instead as a cash cow with no competition or obsolescence threat over the next 10 years.
- Normalization timeline: Improvement in Q1 FY24 is primarily due to the eradication of the inventory overhang, not improved markets. It will probably take a couple of quarters more to get back to normalcy.
Gokul Jaykrishna: “India has become so fundamentally strong compared to the rest of the world that we have become the global supplier of blue across all countries, including China... we have actually really killed the Chinese competition totally to the extent that China had to impose import duty on our blues.”
ATC (Asahi Tennants Colors): The Biggest Bleed Turns Around
- FY23 performance: ATC was the biggest bleed for the year, accounting for about ₹7 crores of negative EBITDA for the full year.
- Yellow line inflection: The yellow line at the Dahej plant is now full, which is expected to drive EBITDA break-even in Q1 FY24. Management stated ATC will be EBITDA positive this quarter despite the weak pigment business climate.
- Growth trajectory: FY24 full-year turnover is expected to be close to ₹90 crores at ~60% utilization, rising to ₹130 crores in FY25 from the current facility.
- Capacity expansion: A new yellow line will be added within the existing Dahej building with a capex of ₹12–13 crores, commencing this quarter and completing in 8–9 months.
AZO Pigments: The Domestic-Led Growth Story
- Rapid volume ramp: Month-on-month turnover has been increasing substantially. Q4 FY23 was reasonably good, and Q1 FY24 is looking substantially better, with quarter-on-quarter volume improvements that are “not 5%, 10%.”
- Domestic dominance: ~90% of the ₹42–45 crores AZO sales have been in the Indian market. Major European customers have contributed nothing so far because sampling and approval cycles are still ongoing.
- Yellow leads the mix: Yellow utilization is almost 100% because local raw material availability is better and technical expertise is stronger. Yellow is expected to contribute 70–75% of the AZO top line for the next three years.
- Red pigment progress: The red product basket has expanded from 2 to 4 products, with a substantial improvement in offtake expected this quarter. Domestic availability of Naphthol AS-IRG and methanol remains an issue for reds.
- Raw material ecosystem shift: India is now completely self-sufficient for yellow pigment raw materials due to companies like Lakshmi, Aarti, and Jubilant entering intermediates. This is part of a China+1 shift creating a domestic supply chain.
- FY24 target: AZO turnover is targeted to grow from ₹41 crores to ~₹90 crores, driven entirely by the Indian market. Even if Europe does not recover, management expects ₹70–75 crores.
- European approvals: Export approvals are slow because customers must shelf products for 3 months before sampling to their own customers, who then shelf for 3–6 months before placing 1-ton commercial trial orders. The whole process takes a minimum of two years.
Gokul Jaykrishna: “If you look at the month-on-month turnover, we have been increasing it substantially... quarter on quarter, the improvement in volumes is substantial. It is not 5%, 10%.”
API Segment: Consolidating Before the Chhatral Leap
- Challenging year: The operating environment was equally challenging for APIs, with a drop in realizations as a common industry trend. Pregabalin prices crashed from ₹4,500 to ₹3,500, though management believes the cycle is bottoming out.
- Odhav peaking: No growth in volume or turnover is expected for FY24 at the Odhav facility. Turnover of ~₹120 crores is kind of peaking out, with growth in the API segment coming only from the Chhatral facility.
- Chhatral Greenfield on track: The project is going absolutely on target, with water trials expected to start in September and production prior to Diwali or slightly before.
- Backward integration timeline: Full backward integration for the Odhav facility is expected within six months for pregabalin (CMH and RCMH), after which the company will not buy even a kilo from outside for pregabalin intermediates.
- No U.S. FDA for 3 years: The API business will not pursue U.S. FDA approval for at least three years due to cost, time, productivity loss from compliance, and the risk of facility shutdown in early stages. European FDA and other markets will be targeted instead.
- Product pipeline: Two new products have been commercially launched at Odhav, three others are under development, and two or three more are targeted for the research pipeline. Two small new molecules are about to be launched this quarter.
Gokul Jaykrishna: “If you go too early with U.S. FDA, any U.S. FDA facility, the productivity levels automatically because of the compliance issues come down a lot... if this happens in the early stages of company's life, it would put the threat on the existence or successful strengthening of the business.”
Balance Sheet & Capital Allocation
- Peak debt: Debt will peak at ₹210 crores after the two current projects, with an additional ₹30–40 crores to be added from the current ~₹175 crores.
- Consolidation phase: After the current capex is complete, the company will enter a 1.5–2 year consolidation phase where no new capex will be done, and debt will be repaid in a planned fashion from FY25 onwards.
- Liquidity: No liquidity constraints exist, and the company is not utilizing all lines fully.
- Peak revenue potential: At optimal utilization across all plants, revenue could reach ₹800–850 crores.
- Long-term margin target: Management targets 15–17% EBITDA over the next two years as business normalizes and capex ends.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Blue business EBITDA break-even | Achieve EBITDA break-even, better than Q4 FY23’s ₹8 crores negative (blue business only) | Q1 FY24 |
| ATC EBITDA break-even | Achieve EBITDA break-even and turn EBITDA positive | Q1 FY24 |
| Chhatral water trials | Water trials to start | September 2023 |
| Chhatral production start | Production to begin | Prior to Diwali or slightly before |
| Pregabalin backward integration | Full backward integration for CMH and RCMH at Odhav | Within six months |
| AZO FY24 turnover | Grow from ₹41 crores to ~₹90 crores (₹70–75 crores minimum) | FY24 |
| Yellow capacity expansion | Add 1,200 capacity with ₹10–14 crores capex; completion in 8–9 months | Commencing Q1 FY24 |
| Debt peak | Peak at ₹210 crores, then de-lever | After current two projects, including the little bit in ATC |
| Consolidation phase | No new capex for 1.5–2 years; debt repayment begins | From FY25 onwards |
| U.S. FDA pursuit | Will not pursue U.S. FDA approval | At least 3 years, then may consider |
Key Metrics
| Metric | Q4 FY23 |
|---|---|
| Group revenue | ₹505 cr, +24% YoY from ~₹401 cr in FY22 |
| Blue division revenue | ₹337 cr |
| AZO division revenue | ₹41 cr |
| API division revenue | ₹125 cr |
| Blue business EBITDA | ₹8 cr negative in Q4 FY23 |
| ATC full-year EBITDA contribution | ₹7 cr negative |
| Blue business capacity utilization | ~70% for full year FY23 |
| Peak Blue turnover at current prices | ~₹400 cr |
| AZO FY24 turnover target | ₹90 cr, up from ₹41 cr in FY23; ₹70–75 cr even without European recovery |
| ATC FY24 turnover target | ~₹90 cr, at ~60% utilization; peak turnover ₹130–140 cr |
| ATC FY25 turnover target | ₹130 cr from current facility |
| Greenfield Atlas Chhatral capex | ₹65–70 cr, of which ₹35–40 cr already spent; peak external turnover ~₹200 cr |
| Peak group debt | ₹200–210 cr, currently ~₹175 cr; additional ₹30–40 cr expected |
| Interest cost | ~₹16 cr per annum |
| Long-term EBITDA margin goal | 15–17% |
| Pregabalin revenue share | 50–60% of API top line |
| Pregabalin price | ₹3,500 per kilo, crashed from ₹4,500; believed to be bottoming |
| API segment price decline | 10–15% |
| Anti-dumping duty on Indian Blue into China | 14.2%, reduced by 2% so far |
| India Blue pigment exports to China | ~3,000 tons per year (no exact figure) |
| Dahej AZO May volumes | 120 tons, highest recorded; June expected higher |
| Dahej Phase 1 capex | ~₹85–90 cr, yielding turnover of ₹130 cr |
| Dahej yellow expansion capex | ₹10–14 cr, timeline ~8–9 months, adding 1,200 capacity |
| Dahej full Phase 2 capex | ~₹30 cr total, can deliver >₹200 cr turnover |
| Atlas acquisition cost | ₹48 cr |
| Group peak capacity turnover | ₹800 cr; realistically achievable ₹700–750 cr consolidated |
| R&D team size | 10 people, one PhD, one with 20–25 years' experience heading R&D |