Key Takeaways
- Volume-led quarter, margin squeeze persists: Volumes grew 12% YoY to 315 MMSCM, but EBITDA margin compressed to ~16.2% from historical 23%+ as gas costs surged 43% and price hikes were calibrated rather than full pass-through.
- New GAs are scaling, not just contributing: Volume mix from new geographical areas improved to 41% from 35% a year ago, and industrial/commercial connections added in H1 are approximately 1.4x the numbers added during the entire FY26, signalling the network is maturing beyond legacy areas.
- The pivot to an energy platform is real but unquantified: 5,513 EV charging points now span 225 cities, and B2B fleet tie-ups with group companies promise higher utilization, yet management declined to share utilization levels, capex outlays, or a timeline for meaningful EBITDA contribution.
- Self-sufficiency narrative taking shape via CBG: The Barsana plant is doubling capacity with Thermax, and more projects are in evaluation, framed explicitly as an Atmanirbhar Bharat play to reduce dependence on imported gas over time.
- What to watch next quarter: Whether the calibrated CNG price hikes taken through August have restored any margin in key markets, any disclosure of EV charger utilization or capex, and progress on the 2 lakh PNG household connection target.
Volume Growth & Network Expansion
- CNG driving the bus: CNG volumes rose 17% YoY to 223 MMSCM, with the company noting the industry is growing at around 20% and ATGL is very close to growing at 17% to 18% in CNG, supported by deeper penetration and station additions.
- PNG growing modestly: PNG volumes grew 3% YoY to 92 MMSCM, with the company aiming to close more than 2 lakh household connections this year.
- Industrial base accelerating: ~900 industrial and commercial customers were added in H1 FY27, roughly 1.4x the number added in all of FY26, taking the total base to 10,864.
- Station rollout on track: Management is targeting close to 80 to 90 new CNG stations in FY27, with FY28 planning underway for similar or more aggressive numbers.
- Infrastructure capex undisclosed: Management described activity levels but did not provide INR capex figures for the current or next year when asked directly.
Margin Pressure & Gas Sourcing
- The cost shock: Natural gas costs rose 43% YoY, driven by higher Brent and LNG prices, currency depreciation, and a change in domestic gas availability including a slight reduction in APM allocation.
- Calibrated pricing, not full pass-through: CNG prices were raised by ~INR11-12 per kg in markets like Ahmedabad across June, July, and August, but management explicitly stated it does not pass on the entire cost to customers.
- Sourcing mix shifting away from spot: Spot exposure, once ~15% of the portfolio, is now down to 7-8% after a long-term contract was signed; approximately 40% of the non-APM portfolio is linked to Henry Hub or Brent.
- Margin recovery unconfirmed: When asked whether the series of price hikes had restored margins to pre-war levels in those markets, management did not confirm, pointing instead to its calibrated approach and long-term contracts.
- Temporary pain, no timeline: Management characterized the margin compression as driven by temporary issues (West Asia crisis, Brent volatility) and said it is working on long-term contracts and calibrating opex and capex to maintain or achieve higher margins, but gave no specific recovery timeline.
Pandita: "While we don't pass on the entire cost to customers, we do take a calibrated approach."
EV Charging & the Energy Platform Pivot
- Scale is building: 5,513 EV charging points are now installed across 26 states and union territories, covering 225 cities with 63 MW of installed capacity.
- B2B is the utilization bet: Management has tied up multiple B2B customers, including group captive entities (Adani Cement, Adani Ports, Adani Logistics), to build charging infrastructure for trucks, arguing B2B routes will deliver higher revenue and utilization than B2C.
- Key metrics withheld: When asked for current utilization levels, the additional capital needed to reach the 75,000 charging station target, and when EV charging would make a meaningful contribution to EBITDA and returns, management did not provide figures or timelines.
Pandita: "We are successfully pivoting from traditional city gas distribution company into an integrated energy platform with 5,513 EV charging points active across 225 cities and rapidly growing footprint in cleaner fuels, we are proving that financial discipline, aggressive infrastructure expansion and India's green energy transition can go hand in hand."
CBG & the Self-Sufficiency Thesis
- Barsana scaling up: The existing CBG plant is producing 5-6 tons per day, with investment committed to double capacity in the next 5-6 months through a technology tie-up with Thermax.
- Pipeline cautious: A few more CBG projects are in the pipeline and being evaluated, but management will move forward only when visibility and confidence on technology and feedstock is achieved.
- Strategic framing: Management positioned CBG as central to reducing dependence on imported gas, linking it explicitly to the Atmanirbhar Bharat narrative of generating the company's own energy.
Pandita: "Now we are at a stage where we need to be self-sufficient. That is so-called Atmanirbhar Bharat, right? We need to focus on developing or generating our own energy."
Financial Summary
| Metric | Q2 FY27 | YoY Change |
|---|---|---|
| Volumes | 315 MMSCM | ▲ 12% |
| CNG volumes | 223 MMSCM | ▲ 17% |
| PNG volumes | 92 MMSCM | ▲ 3% |
| Revenue | INR 2,102 crores | ▲ 34% |
| EBITDA | INR 340 crores | ▲ 12% |
| PAT | INR 167 crores | ▲ 3% |
- H1 FY27: Volumes grew 13% to 618 MMSCM, revenue rose 31% to INR 3,999 crores, and EBITDA increased 3% to INR 621 crores, reflecting the margin pressure concentrated in the first half.
- Revenue growth outpacing EBITDA: The 34% revenue jump against 12% EBITDA growth reflects the gas cost pass-through dynamic: higher top-line from price increases that only partially cover the input cost surge.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| CNG station additions | 80 to 90 new stations | FY27 |
| PNG household connections | More than 2 lakh new connections | FY27 |
| CBG capacity expansion | Double existing capacity at Barsana plant | Next 5-6 months |
| CNG station additions (FY28) | Similar or more aggressive than FY27 | FY28 (planning underway) |
| Infrastructure expansion (FY28) | Similar growth prospects as current year | FY28 |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue | ₹2,102 cr, up 34% YoY |
| EBITDA | ₹340 cr, up 12% YoY |
| EBITDA margin | ~16.2% (per an analyst's math), vs above 23% historically (per an analyst's math) |
| PAT | ₹167 cr, up 3% YoY |
| Total volumes | 315 MMSCM, up 12% YoY |
| CNG volume | 223 MMSCM, up 17% YoY |
| PNG volume | 92 MMSCM, up 3% YoY |
| Natural gas cost increase | 43% YoY |
| CNG stations (network) | 723, 16 added in Q2 |
| PNG household connections | 11.81 lakh, 39,574 added in Q2 |
| Industrial and commercial connections | 10,864, ~900 added in H1 FY27 |
| Steel pipeline network | 16,305 inch-kilometers |
| EV charging points installed | 5,513 across 225 cities, 63 MW capacity |
| Volume mix from new geographical areas | 41%, up from 35% in Q2 FY26 |
| Spot gas proportion of portfolio | 7-8%, down from ~15% prior to term agreement |