Key Takeaways
- Revenue up 12% YoY, but margins squeezed: Consolidated EBITDA grew only 8% YoY to ₹46 Cr as operating expenses rose ~250 bps, driven by input cost inflation, wage adjustments, and elevated logistics costs tied to compost and RDF supply.
- Contract revenue mix is distorting margins: A ₹41 Cr sequential drop in low-margin construction contract revenue masked underlying core growth, and management expects the EBITDA shape to normalize only once that contract revenue is replaced by tipping fees and power sales.
- PCMC waste-to-energy project delayed again: The commissioning timeline has slipped by two to two-and-a-half months to Q1 FY24, this time on global semiconductor shortages hitting control system deliveries and container logistics.
- Receivables are stretching: Total DSOs including all financial assets rose to ~102 days from 92 days last quarter, though the company is now committing to disclose all receivables, including end-of-project-life payables, as a separate line item.
- What to watch next quarter: Whether the promised margin recovery begins to materialize as escalation payments and tipping fee increases flow through, and whether NDMC and Nashik ramp-ups offset the PCMC delay.
Margin Pressure & the Normalization Bet
- Cost inflation hit hard: Operating expense as a percentage of revenue rose ~250 bps YoY, driven by high input costs, repair and maintenance inflation, proactive wage adjustments, improved benefit packages, increased training, elevated repair and transport costs, and higher third-party service costs.
- Contract revenue is the mix culprit: The sequential revenue decline from ₹71 Cr to ₹30 Cr in contract revenue reflects monsoon-driven construction slowdown at PCMC.
- Processing margins under pressure: Significant transportation costs were opexed during the quarter to set up linkage systems and segregation work, while high-moisture monsoon conditions made bio-mining difficult, preventing a better margin play.
- Wage bill rising: An annual review covering ~9% of the 8,000-strong workforce was completed, with competitive compensation adjustments, plus headcount additions from Varanasi and Jhansi project rollouts reflected in the total wage bill.
- The normalization timeline: Management expects core margins to recover between Q4 FY23 and Q1 FY24, as escalation payments begin flowing through from January/February and recent cost increases get offset by built-in tipping fee increases.
- PCMC transition is the unlock: Once contract revenue and contract cost exit the P&L, they are replaced by two higher-margin streams: tipping fees and power sales, with only proportionate operating costs sitting in the cost line.
Subramanian: "So we expect that to happen anytime between the Q4 and the Q1 of the next year, Q4 of the current year and by Q1 of the next year because some of the escalation will also be passed through to us by January and February onwards and the benefit of all the recent increase in costs gets offset by the tipping fee increases."
Project Pipeline & New Wins
- Nashik C&T contract secured: A 5-year contract for two zones (Panchvati and Satpur) handling ~240 tonnes of MSW per day; vehicle mobilization is complete and revenue contribution begins in Q3 FY23.
- Nagpur power sweeping add-on: A 3-year mechanical power sweeping contract for 40 km of road daily, leveraging the existing C&T setup in the city.
- Recycling business launched: Operations kicked off at one MSW collection site, segregating recyclables before landfill disposal; 62 tonnes recycled in two months; the plan is to replicate this across all cities with C&T operations.
- NDMC ramp-up progressing: The project is not yet 100% mobilized but is expected to reach full asset deployment by the end of Q3 FY23; at least four months of revenue will be booked in the current financial year.
- Jhansi fully ramped up: Operations have started and the site is now contributing at full run rate.
- Bidding pipeline active: The company is working on 4–5 new bids and expects to maintain historical strike rates; corporations are in the process of releasing more C&T and processing contracts.
- Delhi landfill opportunity gated by elections: Post-MCD elections, a tender for bio-mining the Ghazipur landfill is expected; the budget required is substantial, and management will only bid if allocated funds are confirmed, as it did with Greater Noida.
- Market growth projection revised down: The MSW market growth projection has been revised to ~11% from 14%, reflecting a slight degrowth in corporation spending patterns over the last couple of years, though this may be revisited upward with newer government policies.
Jose Jacob: "A large number of corporations we have seen the elected bodies yet to be elected and them to start working in full swing so example corporations like BMC, Navi Mumbai, and Nagpur there are no standing committees, there are no committee members or the corporation is yet to be formed."
PCMC Waste-to-Energy: The Moving Target
- Two-month delay confirmed: The project, earlier expected by March 2023, is now anticipated to begin in Q1 FY24 due to global semiconductor shortages impacting delivery of distributed control systems, control valves, and transmitters.
- Supply chain is the bottleneck: Three critical parts sourced from Japan were pushed down supply lines by vendors; the company renegotiated to move up the supply chain, but logistics issues at the shipper's end, specifically container shortages at depots, have added further delay.
- Capex phasing adjusted: Of the incremental ₹67 Cr capex, ~70% is now expected in Q3 and Q4 FY23, with ~25% slipping into Q1 FY24; the bulk of work and boilers should be in place by end of January, with electrical wiring installation progressing thereafter.
- Revenue replacement mechanics: Once operational, contract revenue and cost exit the P&L and are replaced by tipping fees and power sales, which carry a more favorable margin profile.
Balance Sheet & Receivables
- Receivables stretched further: Total DSOs including all financial assets rose to ~102 days from 92 days last quarter; total receivables stand at ~₹201 Cr on a trailing-twelve-month basis, with standard DSOs at 72 days.
- Disclosure practice changing: Management committed to incorporating all receivables (current, non-current, and end-of-project-life payables) as a separate line item going forward, responding to investor scrutiny.
- Borrowing cost improving: Average consolidated borrowing cost decreased 330 bps from 12.7% in March 2021 to 9.4% as of September 2022, reflecting a stable credit profile even without a formal rating upgrade.
- Credit rating revisit planned: The company holds a triple-B-minus stable rating from CARE and will seek a revisit; management believes cash flow strength and project wins could translate into a better rating watch or a notch up.
- Net debt to equity comfortable: Not expected to exceed 0.8x to 0.9x on a fully drawn basis for the current period and possibly mid-next year.
- Mangaluru receivables moving: The municipality has started releasing minimum-wage escalation payments and, per management, has committed to releasing a larger chunk by January; the contract extension now runs through June 2023.
Subramanian: "Going forward as a management practice we will start incorporating all the receivables current and noncurrent and even the money which is payable at the end of the project as a separate line item and we will disclose that separately."
Volume Growth & Core Operations
- Organic volume growth in line: MSW C&T volumes rose 8.12% YoY and MSW processing tonnage grew 8.3% YoY; organic site growth of 8% is consistent with the base-case expectation of 3–6% organic waste generation growth.
- C&T revenue up 10% YoY: Driven by increased volumes in existing contracts and the ramp-up of newer contracts; H1 growth stood at 15%.
- Processing revenue up 19% YoY: H1 processing revenue grew 17%, supported by record compost sales and 10,734 tonnes of RDF shipped during the quarter.
- Bio-mining activity sustained: High levels of bio-mining continued at Kanjurmarg despite monsoon conditions, and the company intends to maintain this direction throughout the year.
- Recycling is a new, non-contractual lever: The initiative is not a contractual requirement but aligns with sustainability and circular-economy goals; 62 tonnes recycled in two months at one site, with plans to expand to all C&T cities.
Jose Jacob: "This is not our contractual requirement but in line with organization's aim of sustainability and working in the forefront of creating a circular economy."
People, Costs & Capital Allocation
- Wage review completed: An annual review covering the entire workforce identified ~9% of 8,000 employees needing competitive compensation adjustments; the increase will be split into two phases, with the half-yearly review just concluded.
- ESOP plan introduced: A new ESOP plan with 3 lakh shares total, split into two series; the first grant of 1 lakh shares is planned for November/December FY23; total cost is estimated at ₹1.5–2 Cr, or ~2–4% of the total range.
- Capex priorities: Incremental capex of ~₹67 Cr for PCMC WTE (bulk in H2 FY23), ~₹12 Cr for Kanjurmarg in H2, and ~₹1.5–3 Cr for C&T depending on tonnage improvement, which may be deferred to next year if not needed.
- Cost of borrowing declining: Even without a material rating upgrade, borrowing costs have fallen sharply at step-down subsidiaries and for vehicle-funded loans in the C&T business.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue CAGR | 25% CAGR growth, with ability to maintain margins as the "deadlock" | Ongoing (no end date stated) |
| Core margin normalization | Margins to recover as escalation payments and tipping fee increases offset cost inflation | Q4 FY23 to Q1 FY24 |
| NDMC full mobilization | 100% asset deployment at the NDMC site | By end of Q3 FY23 |
| PCMC WTE commissioning | Project to begin operations | Q1 FY24 (slipped from March 2023) |
| PCMC capex phasing | ~70% of ₹67 Cr incremental capex spent in FY23, ~25% in Q1 FY24 | Q3/Q4 FY23 and Q1 FY24 |
| Nashik C&T revenue start | New contract begins contributing to topline | Q3 FY23 |
| Mangaluru escalation receivables | Large chunk of pending escalation payments to be released | By January 2023 |
| Net debt to equity ceiling | Not to exceed 0.8x–0.9x on a fully drawn basis | Current period through mid-next year |
| Receivables disclosure | All receivables (current, non-current, end-of-project-life payables) disclosed as separate line item | Going forward |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Operating revenue | ₹160 Crores, +12% YoY |
| H1 FY23 operating revenue | ₹317 Crores, +16% YoY |
| Consolidated EBITDA | ₹46 Crores, +8% YoY |
| EBITDA margin | 22% for Q2, 21% for H1 |
| Profit before tax | ₹31 Crores, +10% YoY |
| Profit after tax | ₹28 Crores, +17% YoY |
| MSW C&T revenue | ₹116 Crores, +10% YoY |
| MSW processing revenue | ₹45 Crores, +19% YoY |
| MSW C&T volume | 0.04 crore tonnes, +8.12% YoY |
| MSW processing tonnage | 0.06 crore tonnes, +8.3% YoY |
| Operating expense ratio | increased ~250 bps YoY |
| Net debt-to-equity | 0.3x as of September 30, 2022 |
| Total debt | ₹289 Crores as of September 30, 2022 |
| Net debt | ₹200 Crores as of September 30, 2022 |
| Average consolidated borrowing cost | 9.4% as of September 2022, down 330 bps from 12.7% in March 2021 |
| DSOs (trailing 12 months) | 72 days |
| Total receivables (incl. trade and financials) | ~₹201 Crores as of September 2022 |
| Total DSOs (incl. all receivables) | ~102 days, vs 92 days in prior quarter |
| RDF shipped | 10,734 tonnes |
| Recyclables segregated (first project) | 62 tonnes over two months |
| Revenue growth guidance | 25% CAGR |
| PCMC WTE project incremental capex | ₹67 Crores, bulk in Q3 and Q4 FY23, balance in Q1 FY24 |
| NDMC annualized revenue potential | ₹100 Crores, at least four months of revenue expected in FY23 |
| Contract revenue (Q2) | ~₹30 Crores, down from ₹71 Crores in Q1 FY23 due to monsoon slowing construction |
| Core operating margin (normalized) | 22% to 23% (per an analyst's math), expected to normalize to 25%–26% by Q4 FY23 or Q1 FY24 |