Key Takeaways
- Guidance met, acceleration underway: Revenue grew 26.8% YoY and 8.3% QoQ, with EBITDA margin up 150 bps to 37.6% as operating leverage and cost indigenization took hold.
- India's first indigenous turbojet engine delivered: Azad shipped the complete expendable turbojet engine to GTRE/DRDO on 22 July, shifting the company from component maker to fully integrated propulsion system player.
- Capacity is the story: The Baker Hughes facility was inaugurated in April, dedicated lines for Mitsubishi, GE and Siemens are commissioned, and all 8 Tunikibollaram plants are moving to full-throttle production in Q2.
- Margins structurally higher: Same product lines that once ran at 18–19% EBITDA now operate at 35–36%+, with raw material costs down from ~12% to 5% of sales on Indian supplier qualification.
- What to watch next quarter: Engine volume clarity after weapon testing, Rolls-Royce first delivery, and whether Q2 full-throttle production converts into the promised H2 revenue acceleration.
The Turbojet Engine: India's First Indigenous Program
- What was delivered: Azad manufactured, assembled and delivered India's first indigenous expendable turbojet engine to Gas Turbine Research Establishment (GTRE), DRDO and Ministry of Defense on 22 July.
- Strategic shift: The company has evolved from precision component manufacturer to fully integrated propulsion system player, with end-to-end manufacturing, assembling and integration of complete engine assembly.
- In-house content: Everything was done in-house except small washers and some specific machining/welding operations done by GTRE or their approved sources.
- Testing timeline: Engine is currently under testing; next phase is testing on the weapon expected in the next 4 to 6 weeks, after which airworthiness certification will happen and it will be good to go for production.
- Volume uncertainty is real: Management has heard volumes could be 2-digit, 3-digit or 4-digit, but has nothing in writing; the 4–6 week weapon testing timeline was described as "just a timeline which we heard about it. We have no base for it or we have nothing in written or something."
- Capacity readiness: For 2-digit volumes, existing capacity is sufficient; all capacity is fungible and can manufacture engine components, so no great capacity addition is needed at that level.
- Margin guidance pending: Management will provide margin guidance for engine projects only after 5–6 engines are produced in a row, expected in 8–12 weeks, possibly by next earnings call.
Chopdar: "This is not some years story. These are a few months story."
Capacity Build-Out & Customer Stickiness
- Dedicated facility model: Azad has commissioned dedicated lean manufacturing lines for Mitsubishi, GE Power Systems and Siemens Energy, and in April 2026 inaugurated a 7,600 square meter facility custom-built for Baker Hughes.
- Tunikibollaram scale: 8 dedicated customer plants are being built; civil construction completes this financial year, and each plant is expected to generate ₹150–180 crores at full utilization, totaling ~₹1,200 crores.
- Production status: Q1 saw machines switched on, production started slowly and qualifications completed; Q2 is when machines go to "full throttle production" and everything settles down.
- Hot section capability: The Mitsubishi facility will also cater to hot section of aviation engines, not just land-based/energy applications; other OEMs have shown "super interest" and are asking when the facility will be ready.
- Hot section timeline: Facility establishment is ~7–8 months away, with qualification to follow; other OEMs will be invited during qualification.
- No speculative capacity: Expansion is anchored entirely against firm long-cycle contracts and multiyear order book visibility; management does not build ahead of demand.
- Revenue timing: More substantive revenue contributions from new lines are expected to begin crystallizing in the second half of this financial year, with accelerated growth from Q3 and Q4 onwards.
Malpani: "Because once a global marquee OEM integrates a dedicated qualified facility into their primary supply chain, shifting that business carries a huge switching cost. This is what operational stickiness means in our industry, and this is what gives us exceptional multiyear revenue and volume visibility."
Margin Mechanics
- EBITDA margin expansion: 150 bps YoY to 37.6%, driven by operating leverage as production scale rises and fixed corporate overhead is absorbed efficiently.
- Structural shift: Margins have moved from the 30–35% range to 37–38% over the last 1.5 years due to shop-floor skill set improvements and continuous improvement.
- Same line, different economics: Product lines that operated at 18–19% EBITDA at inception now run at 35–36%+, driven by process engineering and multiple floor-level factors.
- Raw material cost collapse: Raw material cost to sales fell from ~12% to 5% because two Indian suppliers (Sunflag and Star Wire) qualified for critical raw material grades with GE and Siemens for the global supply chain, providing price and transportation cost benefits of ~4–5%.
- Employee cost front-loading: Employee cost rose from ₹29 crores to ₹42 crores because headcount is being built ahead of Q3/Q4 sales; WIP cycles of 90–120 days require inventory and staffing in advance, with absorption expected to normalize by Q3/Q4.
- Other income moderation: Other income fell sharply to ₹4 crores from ₹17 crores in Q4 FY26 entirely due to foreign currency dynamics; Q4 was bloated by nonoperating FX gains.
- Finance costs: Increased in Q1 due to bill discounting charges, which flow through the finance cost line; management says this reflects betterment of operating cash flow, not deterioration.
- Margin guidance held conservative: Management is holding the 32–35% EBITDA guidance window for calculation purposes despite delivering above 35%, and is exploring further improvement beyond current levels.
Chopdar: "I remember the days, we were operating at 18%, 19% EBITDA. On the same product line, we are now operating this EBITDA level. So definitely, there's some magic happening on the floor."
Segment Performance
| Segment | Trend | Commentary |
|---|---|---|
| Aerospace & Defense | ▲ 24.7% YoY | Increased share of wallet with global aviation majors and initial tailwinds from advanced propulsion and defense system deliveries. |
| Energy & Oil & Gas | ▲ 26.7% YoY | Healthy demand across gas turbine components and operational launch of new customer dedicated production lines. |
| Subsidiaries | ▬ On track | Key subsidiaries performing precisely on track with turnaround targets set by management. |
- Growth vs global peers: Management rejects comparison with global peers growing 25–26% in dollar terms; those companies built capacity decades ahead and operate at far larger scale (\$2B+/quarter vs Azad's ₹600 crores full year). Azad is in stabilization phase with foundation now laid.
- Rupee impact muted: Depreciation is not a significant factor; the company imports a lot, creating a natural hedge, and does not plan business around forex.
Malpani: "These companies have been building capacities or have built capacity several decades ahead of the curve, right? And the scale at which they are operating, obviously, is very different than the scale that we are operating at."
New Customer Programs
- Rolls-Royce: Qualification parts are almost finished; first delivery expected within the current quarter.
- Indian raw material qualification: Sunflag and Star Wire qualified with GE and Siemens for the global supply chain, not just India, for critical raw material grades.
- Hiring engine: Company is hiring 150–200 people per month with 90-day training, creating bench strength ahead of revenue.
- Working capital targets: H1 around 200 days, H2 in range of 160–180 days; debtor days to reduce from 170–180 to 90 via bill discounting.
- Hedging: Entire export receivables to be hedged by Q4 via bill discounting facility and foreign currency loans.
- New segments: Management declined to comment on specific opportunities such as investment castings, but said work is happening across sectors with an update expected in the coming call or in-person meeting.
Malpani: "We have the right customers in the sector. We cannot have better customers. There are -- all the customers that are noteworthy in the sector are with us."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | Over 25% annual growth while maintaining industry-leading profitability | Long-term, reiterated |
| Revenue acceleration | Substantive contributions from new lines; accelerated growth from Q3/Q4 | H2 FY27 |
| Full-throttle production | All spindles fully running at Q2; production starts coming out | Q2 FY27 |
| Rolls-Royce first delivery | First batch of qualification parts delivered | Current quarter |
| Engine margin guidance | After 5–6 engines produced in a row | 8–12 weeks / next earnings call |
| Weapon testing | Engine testing on weapon; airworthiness certification to follow | Next 4–6 weeks |
| Civil construction | Remaining units at Azad Center of Excellence wrap up | This fiscal year |
| Working capital | H1 ~200 days; H2 160–180 days; debtor days to 90 via bill discounting | H1/H2 FY27 |
| Hedging | Entire export receivables hedged via bill discounting and FCY loans | By Q4 FY27 |
| Employee cost normalization | Absorption improves as WIP converts to sales | Q3/Q4 FY27 |
| Next-phase capex plan | Quantum of capital and timing addressed with far more accuracy | Next quarter |
| Hot section facility | Establishment ~7–8 months away; qualification to follow | ~7–8 months |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Standalone revenue | ₹170.5 crores, up 26.8% YoY from ₹134.5 crores and up 8.3% QoQ from ₹157.4 crores |
| Standalone EBITDA | ₹64 crores, up 32.1% YoY from ₹48.5 crores and up 10.9% QoQ from ₹57.8 crores |
| Standalone EBITDA margin | 37.6%, up 150 bps YoY from 36.1% and up 90 bps QoQ from 36.7% |
| Standalone PAT | ₹36.4 crores, up 21.2% YoY from ₹30 crores and up 3.5% QoQ from ₹35.1 crores |
| Standalone PAT margin | 21.3% |
| Standalone EPS | ₹5.63 per share |
| Consolidated revenue | ₹172.6 crores, up 25.9% YoY |
| Consolidated EBITDA | ₹64.4 crores, operating margin of 37.3% |
| Consolidated PAT | ₹35.2 crores |
| Other income | ₹4 crores, down from ₹9.1 crores in Q1 FY26 and ₹17 crores in Q4 FY26 on currency normalization |
| Aerospace and Defense segment growth | 24.7% YoY |
| Energy and oil & gas segment growth | 26.7% YoY |
| Long-term revenue growth guidance | Over 25% annually, reiterated |
| EBITDA margin guidance | 32% to 35%, held as planning window |
| Working capital target | 200 days in H1, targeting 160 to 180 days in H2 |
| Debtor days | 170 to 180 days currently, expected to reduce to 90 days via bill discounting |
| New Baker Hughes facility | 7,600 square meters, inaugurated April 2026 |
| Tunikibollaram plant revenue potential | ₹150 crores to ₹180 crores per plant at full utilization, roughly ₹1,200 crores total from 8 plants |
| FY26 foundational initiatives stabilized | 80% in Q1, remaining on track for completion by mid-Q2 and full closure by Q3 |
| Headcount growth | 42% YoY (per an analyst's math) |
| Hiring rate | 150 to 200 people per month, with 90-day training program |
| Raw material cost to sales | 5%, down from ~12% last year (per an analyst's math) |
| Employee cost | ₹42 crores, up from ₹29 crores (per an analyst's math) |
| WIP cycle | 90 to 120 days |
| Local raw material cost advantage | 4% to 5% versus imported |
| Contract visibility | 5 to 8 years |
| Export receivables hedging | Fully hedged by Q4 via bill discounting facility |