Key Takeaways
- Execution, not demand, is the story: Revenue grew 31.6% YoY to a record ₹187.8 cr, and management’s central message is that the question is not demand but how quickly capacity converts to revenue.
- Margins expanded despite heavy investment: EBITDA margin rose 150 bps YoY to 37.5% as gross margin improvement absorbed the running costs of new facilities not yet billing at full rate, while PAT lagged on higher depreciation and pre-hired manpower.
- The capacity bet is now live: All six customer-dedicated facilities are commissioned, ₹251 cr of new assets were capitalized in H1, and throughput from the new capacity begins in Q3, setting up a revenue ramp from Q4.
- The revenue bridge is qualification, not order wins: Aero-engine airfoil qualifications with Rolls-Royce, Pratt & Whitney and Safran are the gating items; once cleared, production revenue “just adds up” with no new customer acquisition required.
- What to watch next quarter: Whether throughput from the new facilities actually converts to invoiced revenue in Q4, the pace of manpower cost absorption, and any update on the capacity range beyond the “bare minimum” ₹1,300+ cr ARR.
Capacity Build-Out & Revenue Conversion
- Six-facility complex complete: All six customer-dedicated facilities at Tuniki Bollaram are now commissioned, including the two GE Vernova facilities inaugurated in September; buildings are ready, major machines are inside, spindles are running and throughput is as planned, with only a normal two-to-three-week delay.
- Throughput timeline: Throughput from the new facilities started in Q3; supplies will begin from the end of Q3 and Q4, with revenue ramping up from Q4 FY27 onwards and all plants fully ramped up by Q2 FY28.
- Installed capacity: Current installed capacity positions the company to reach an annual revenue run rate of over ₹1,300 crores by the end of FY28, more than double FY26 revenue; management calls this the “bare minimum” and expects to update the range next quarter.
- Cash conversion lag: Cash is expected to start flowing out of the company by Q4 end, with Q1 of next year being “perfectly in thing,” though some cash is seen in Q4 as well; bill discounting lines with ICICI Bank and DP World are available from Q4 to reduce debtor days directly.
- Next phase of capex: Planning for FY29 onwards will begin once current qualifications are done and customers open up further engine programs; QIP or other funding may be considered when required.
- One or two buildings still available at Tuniki for additional dedicated facilities; some customers want to book Azad for multiple years in a similar model, with an announcement expected very soon.
Chopdar: “For Azad, the question is not demand, it's how quickly we convert capacity into revenue and that is the key message for this quarter.”
Margin Structure & Cost Absorption
- Gross margin expansion: Gross margin before depreciation improved 150 bps YoY to 45.2%, driven by operating leverage, local sourcing and backward integration into special processes, achieved while absorbing running costs of new facilities not yet billing at full rate.
- Manpower cost front-loading: Manpower cost rose YoY because highly skilled manpower was hired in advance of capacity becoming operational; revenue has just started flowing, so the cost is currently unabsorbed.
- Manpower cost outlook: Management expects a drastic fall in manpower cost as a percentage of revenue in the next-to-next quarter as revenue throughput compensates for the pre-hired cost; this front-loading cycle will repeat every four to six quarters as new capacity is planned.
- Depreciation step-up: Depreciation was ₹21.8 cr in Q2 and will step up once more in Q3 and Q4 as the GE Vernova facility, inaugurated in September, incurs a full quarter of depreciation, before stabilizing.
- Treasury income decline: Other income fell to ₹4.7 cr from ₹12.7 cr YoY as IPO and QIP cash reserves were deployed into factory infrastructure and machines; interest on fixed deposits fell from ₹6.8 cr to ₹1.7 cr.
- Tax rate normalization: The H1 effective tax rate of 17.2% included a one-time deferred tax credit of ₹4.3 cr from moving to the new tax regime; the normal rate is approximately 25%.
- Cost structure normalization target: Management is confident of reaching the same margins and cost structure percentage as FY24, with the cost base largely in place and rising revenue translating directly into better profitability.
Jajoo: “I am quite confident that we will reach to the same margins or same cost structure percentage as it was there in FY 2024.”
Segment Performance & Customer Progress
| Segment | H1 Revenue | YoY Growth | Commentary |
|---|---|---|---|
| Energy, Oil & Gas | ₹290 cr (81% of revenue) | ▲ 28.5% | Wallet share still single-digit; long runway to double-digit; no slowdown seen from customers. |
| Aerospace & Defence | ₹60.4 cr (17% of revenue) | ▲ 28.3% | Growth driven by GTRE turbojet delivery and aero-engine qualification progress; production revenue from Rolls-Royce yet to begin. |
| Domestic | ₹43 cr (12% of revenue) | ▲ >2.5x | Helped by indigenization work with BHEL; exports expected to remain ~85% of sales. |
- GE Vernova: Two dedicated lean manufacturing facilities inaugurated in September; Delivery Partnership Award received.
- Baker Hughes: Supply agreement with Nuovo Pignone extended up to 2030; Growth Collaboration Award received; dedicated oil and gas facility adds a growth lever from Q4 FY 2027.
- BHEL: Approved as a long-term source with a two-year rate contract worth approximately ₹52.68 cr for gas turbine airfoils.
- Mitsubishi Heavy Industries: Hot section parts and nozzle vane segments initiated under an eight-year single-source contract.
- GTRE: Delivered India’s first indigenous expendable turbojet engine; positioned for end-to-end manufacture, assembly and integration of complete engine assemblies; a second engine is about to be delivered while testings of the first are ongoing.
- OEM advance agreement: One OEM agreed to give a 50% advance on each purchase order, with close to about $4.5 million expected under this arrangement; management is working to replicate the advance template with other OEMs.
Malpani: “Once a global OEM has qualified a dedicated facility into its primary supply chain, moving that business carries a very high switching cost, and this is what gives us a multi-year visibility with all of our customers across each of our segments.”
Aero-Engine Qualification Pipeline
- Rolls-Royce: Aero-engine airfoil qualification is in the last leg; the first qualification batch delivery is expected very soon; capex for the commercial production line is already done and the line is production-ready now.
- Two engine programs with Rolls-Royce are in qualification; production starts for these two lines once the qualification batch is delivered; after that, the rest of Rolls-Royce’s engines will go into qualification in a continuous process.
- Pratt & Whitney and Safran: Delta qualifications are ongoing, positioned behind Rolls-Royce in the sequence; once Rolls-Royce qualification is done, revenue will follow from Pratt & Whitney, then Safran.
- Revenue visibility: Revenue from already-qualified parts with existing customers will take care of revenue projections for the next five years; currently there is no production revenue from Rolls-Royce, so qualification clearance directly adds incremental revenue.
- Qualification-to-production mix shift: Energy is now largely in production with some qualifications; aerospace will follow the same trajectory as qualifications convert.
- Indigenous engine program: Management is “eagerly waiting” for test results but has very limited information; production mode is “not far away” but dependent on test results and weapon flight, at which point the program is expected to “be a big one.”
Chopdar: “I am also eagerly waiting for the testings are ongoing right now, and they are quite restrictive in giving the information out. ... When this engine flies on the weapon, that is where they are really going to open up, and we are 100% sure it is going to be a big one, for sure.”
Working Capital & Balance Sheet
- Working capital build: Inventory rose ₹98 cr in H1 to ₹425 cr, of which ₹72 cr is WIP on new lines in delta qualification or ramp-up stage that can be invoiced only after customer approval; trade receivables rose ₹92 cr to ₹402 cr in line with higher revenue.
- Operating cash flow: Negative ₹45.8 cr after tax, an improvement from negative ₹76.5 cr in H1 FY26, as working capital outflow of ₹157.5 cr was nearly flat YoY on a 29% larger business.
- Working capital normalization expected: The cycle is expected to stabilize as throughput converts into revenue from Q4, with inventory turning into receivables and then into cash.
- Net debt: ₹423.8 cr, at 0.26x equity and 1.6x annualized EBITDA; ₹621.8 cr of the ₹700 cr QIP has been deployed, with the remaining ₹78.2 cr in fixed deposits for balance capex.
- Bill discounting: Lines are now in place with ICICI Bank and DP World, to be used from Q4 FY27 onwards, reducing debtor days directly with a modest addition to finance cost.
- Customer advances: Discussions with customers for advances on working capital are underway; customers have agreed with minimal discount of hardly 1%.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | >25% annual growth (long-term guidance reiterated) | Ongoing |
| Capacity ramp-up | All plants fully ramped up | By Q2 FY28 (H1 FY28) |
| Revenue run rate | Annual revenue run rate of >₹1,300 cr (bare minimum) | By end of FY28 |
| Revenue ramp from new capacity | Throughput begins Q3; revenue ramps from Q4 | Q3 FY27 / Q4 FY27 |
| Margin normalization | Reach same margins / cost structure percentage as FY24 | By FY28 |
| Depreciation stabilization | One more step-up in Q3 and Q4, then stabilize | From Q4 FY27 onwards |
| Working capital normalization | Inventory converts to receivables then cash; bill discounting deployed | From Q4 FY27 |
| OEM advance arrangement | ~$4.5 million expected from one OEM under 50% advance on POs | Ongoing |
| Aero-engine airfoil deliveries | Rolls-Royce, Pratt & Whitney, Safran deliveries start | Next fiscal onwards (FY28) |
| Manpower cost absorption | Drastic fall in manpower cost as percentage of revenue | Next-to-next quarter |
| Capacity range update | More exact capacity range beyond ₹1,300+ cr | Possible next quarter |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Standalone revenue | ₹187.8 cr, highest-ever quarterly revenue, up 31.6% YoY and ~10% QoQ |
| H1 FY27 standalone revenue | ₹358.3 cr, up 29.3% YoY, ahead of 25% guidance |
| Consolidated Q2 revenue | ₹190 cr, up 31.1% YoY |
| Consolidated H1 revenue | ₹363.5 cr |
| EBITDA | ₹70.4 cr, up 37.1% YoY |
| EBITDA margin | 37.5%, expanded 150 bps YoY from 36% |
| H1 EBITDA | ₹134.5 cr, up 34.7% YoY, margin 37.5% vs 36% YoY |
| Profit after tax | ₹30.8 cr, margin of 16.4% |
| H1 PAT | ₹67.2 cr, up 6.6% YoY |
| Gross margin before depreciation | 45.2%, expansion of 150 bps over 43.7% in Q2 FY26 |
| Energy, oil and gas Q2 revenue | ₹152 cr, grew 30.02% YoY |
| Aerospace and defence Q2 revenue | ₹31.7 cr, grew 31.6% YoY |
| Export share of revenue | 88%, expected to remain about 85% |
| Domestic revenue H1 | ₹43 cr, grew more than 2.5x, now 12% of business up from 6% |
| Depreciation | ₹21.8 cr, doubled from ₹10.9 cr YoY; ₹251 cr of new assets capitalized in H1 |
| Finance cost | ₹12.2 cr, up from ₹6.4 cr YoY; EBITDA covers finance cost 5.8x |
| Employee costs | ₹50.3 cr, up from ₹32.5 cr YoY, reflecting hiring ahead of revenue ramp |
| Other income | ₹4.7 cr, down from ₹12.7 cr YoY as treasury funds deployed into capex |
| Net worth | ₹1,619.6 cr |
| Net debt | ₹423.8 cr, 0.26x equity and 1.6x annualized EBITDA |
| Bank borrowing | ₹536.4 cr, comprising ₹340.6 cr term loan and ₹195.8 cr working capital |
| Inventory | ₹425 cr, rose by ₹98 cr in H1; ₹72 cr of increase is WIP on new lines in qualification |
| Trade receivables | ₹402 cr, rose by ₹92 cr in H1; 69% of regular receivables not yet due |
| Operating cash flow after tax | negative ₹45.8 cr, improved from negative ₹76.5 cr in H1 FY26 |
| Order book | over ₹6,500 cr, rolling set of contracts based on customer demand over next 5–7 years |
| Annual revenue run rate target | over ₹1,300 cr by end of FY28, on current installed capacity |
| BHEL rate contract | ₹52.68 cr, two-year contract for gas turbine airfoils |
| OEM advance arrangement | \$4.5 million expected from one OEM, 50% advance on each PO |
| Customer-dedicated facilities commissioned | 6 facilities, 44,800 sq m total for MHI, GE Vernova, Siemens Energy, Baker Hughes |