Key Takeaways
- Margin shock absorbed, recovery underway: EBITDA per kg collapsed from INR 7 to INR 2 for the first 45 days as the company chose to absorb a sharp consumables cost spike rather than renegotiate firm-rate orders. New orders from April 1st onward were booked at escalated prices, and margins returned to INR 7–8 per kg from mid-May.
- Volume growth conviction intact at 20%: Management targets 20% volume growth for FY27, anchored on a two-decade track record, market share gains, and a three-part engine: new customer additions, existing customer growth, and 250 new SKUs per year.
- Speciality Wire milestones are landing: The first Steel Cord trial order came from a leading Indian tire maker, IHT wire is ahead of expectations with 80% of customer approvals secured, and OHT commissioning is on deck.
- B2C is now a material, disclosed contributor: The new Farming, Fencing, and Poultry range already contributes 10% of sales, and the ambition is to take B2C to 25% of total revenue by routing half the low-carbon business through this channel.
- What to watch next quarter: Whether the Steel Cord trial converts to a confirmed order book, the pace of IHT ramp-up toward 50% utilization, and whether the INR 7–8 per kg margin sustains through Q2, a seasonally soft quarter for B2C.
Q1 Margin Event: What Happened and Why
- Trigger: Geopolitical tension in West Asia disrupted natural gas availability, driving a sudden, exponential increase in consumable prices. On a blended basis, costs rose roughly INR 5,000 per tonne across gas, packaging, and other consumables.
- The decision: Management made a conscious call not to pass the spike through to customers on existing firm-rate orders, which covered 30–40 days of the order book. The rationale was relationship protection: these customers had supported the company over its 85-year history.
- The math: EBITDA dropped from INR 7 per kg to INR 2 per kg during the first 45 days. New orders booked from April 1st onward carried escalated prices with maintained margins, and by May 15th the company was back to INR 7–8 per kg. The full-quarter blended margin landed at roughly INR 4–4.5 per kg.
- Volume held, share gained: Volume did not grow 20% in the quarter due to a demand dip, but the company gained market share, with the B2C segment helping. Demand has since returned to normal levels.
- Cash flow resilience: Despite the EBITDA and PAT hit, the company generated INR 115 crore in operating cash flow during the quarter, reflecting working capital discipline built over the last five quarters.
Pranav Bansal: "We took a very conscious decision not to pass this over to our customers on the firm rate of orders that we already have... we took a call that we will absorb that cost because we have been with these customers and they have supported us for such a long time."
Speciality Wire: The Growth Pipeline
- Steel Cord: Received the first trial order from one of India's leading tire manufacturers during the quarter. The customer skipped the field trial stage and moved directly to bulk trial orders, an encouraging signal. Each trial stage takes two to three months, and with three to four trials the process could take six to eight months before a confirmed order book materializes. More trial orders from other customers are expected within this quarter.
- IHT wire: Progress is ahead of initial expectations. Customer approvals are progressing well, with 80% of customers already approved and the remaining 20% in very advanced stages. Management targets 50% capacity utilization next month and expects to reach optimum utilization (60–80%) within this year.
- OHT wire: Commissioning expected shortly, with meaningful revenue contribution only from next year.
- Long-term vision: The ambition is to reach 2 lakh tonnes of Speciality Wire production over the next four to five years, once approvals and quantity levels are achieved. Even at that scale, the company targets no more than 45–50% market share, noting that 60–65% of the current market is served through imports.
- Competitive position vs China: Management asserts it can compete with Chinese manufacturers on any day if raw material prices were equal. The current disadvantage is an INR 10–15 per kg higher raw material cost in India, which represents roughly 50% of the margin on this product.
Pranav Bansal: "If I was to get the same raw material price, I can compete with them any day. Today, our raw material price in India for especially this kind of business, we get an INR 10 to INR 15 kg higher price. That is not a call that we will be able to take in this product. That is 50% of our margin."
B2C: A Structural Channel Shift
- New product launch: Introduced a range of steel wire products for Farming, Fencing, and Poultry during the quarter. Customer response has been encouraging, and the range already contributes approximately 10% of Q1 FY27 sales.
- The ambition: Management wants 50% or more of the low-carbon business to flow through the B2C channel. Since low-carbon wire represents 50–55% of total volume, this translates to roughly 25% of total sales from B2C over time.
- Seasonality note: Q2 and Q3 are seasonally soft for B2C, while Q1 and Q4 are stronger. This matters for near-term margin and volume cadence.
Volume Growth Engine and Market Share
- The 20% formula: Management's conviction in 20% annual volume growth rests on a three-part engine, each contributing roughly one-third: growth from regular customers, growth from existing customers expanding their share of wallet, and growth from new products, with a target of 250 new SKUs introduced each year.
- Market share dynamics: The company is gaining share while the industry grows at 7–8%. Being the largest wire rod purchaser and paying suppliers in advance provides pricing leverage that smaller competitors cannot match.
- Capacity strategy: The company starts each year with roughly 25% excess capacity to enable 20–25% growth. 85–90% utilization is considered the sweet spot for capital efficiency. The Dadri greenfield facility had initial hiccups that are now cleared, and ramp-up is underway.
- CAPEX cadence: INR 200–250 crore of annual CAPEX is planned to sustain 20–25% volume growth. No more very high CAPEX years are expected outside the Speciality segment.
Working Capital and Cash Flow Reset
- Inventory and receivables: Inventory days have come down, and overdue receivables have been reduced. The company is renegotiating with customers to bring down receivable days and has started channel financing. A big structural change in the receivable pattern is expected over the next one to two years.
- Payables trade-off: Management chooses to pay suppliers in advance to maintain purchasing leverage as the industry's largest buyer. When asked why payable days cannot be extended given the company's size, management did not quantify the cost advantage from this practice but stood by the strategic logic.
- Cash flow target: The CFO is targeting almost INR 800 crore of combined cash flow for FY27 and FY28.
Pranav Bansal: "And honestly, if you don't target, you will not be able to achieve. So, it's important for us to target this kind of a number to achieve it."
Sanand Facility: Clarification on Disposal
- What was asked: An analyst noted the Sanand facility was not classified as an asset held for sale and questioned the disposal plan.
- What was clarified: The company is not selling the entire Sanand facility. It is expanding there with 90,000 tonnes of wire CAPEX. Some excess land may be sold, but the facility itself will not be disposed of. Initial management comments appeared to contradict this before Pranav Bansal corrected the record.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | 20% volume growth for FY27 | Full year FY27 |
| EBITDA growth | At least 20% EBITDA growth, contingent on volume growth | Full year FY27 |
| IHT capacity utilization | Reach 50% utilization | Next month |
| IHT capacity utilization | Reach optimum utilization (60–80%) | Within this year (FY27) |
| OHT commissioning | Commission OHT wire product | By end of FY27 |
| OHT revenue | Meaningful revenue contribution | Next year (FY28) |
| Steel Cord trial progression | More trial orders from other customers | Within this quarter |
| Steel Cord final order book | Confirmed order book post-trials | Six to eight months (per general timeline) |
| B2C revenue share | 25% of total sales from B2C | Ambition, no date |
| Speciality Wire production | 2 lakh tonnes | Four to five years |
| ROCE | 25% in current business | "In a very short while" |
| Annual CAPEX | INR 200–250 crore to sustain growth | Ongoing, annually |
| Combined cash flow | INR 800 crore | FY27 and FY28 combined |
| Receivable days | Sharp reduction | This year and next year |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Sales volume | 112,000 tonnes |
| Operating capacity | 680,000 tonnes |
| Blended EBITDA per kg | INR 4–4.5, down from INR 7 per kg; first 45 days at INR 2 per kg, recovered to INR 7–8 per kg from mid-May |
| Free cash flow from operations | ~INR 120 crore |
| Volume growth guidance (remaining 3 quarters) | ~20% |
| EBITDA growth guidance (FY27) | At least 20% |
| Annual capex target | INR 200–250 crore |
| B2C revenue contribution | ~10% of Q1 sales |
| B2C margin premium vs B2B low carbon | 20–30% extra EBITDA per tonne |
| IHT capacity utilization (current) | 35–40%, targeting 50% next month |
| IHT and OHT combined capacity | 9,000 tonnes currently, expanding to 15,000 tonnes by year-end |
| Steel Cord pilot capacity | 20,000 tonnes per year |
| Total Speciality Wire capacity | ~35,000 tonnes |
| Gas cost increase (blended average) | ~1.5x |
| Consumable cost increase (blended) | ~INR 5,000 per tonne |