Key Takeaways
- Overseas operations the clear drag: Standalone profitability held at ~28% despite a 7% revenue dip, but European and US subsidiaries stayed loss-making, prompting a six-month manufacturing footprint review with no near-term loss-reduction trajectory given.
- Aerospace and defense order book building: A new first-of-its-kind landing-gear facility in India, a long-term European aerospace partnership, and an expected ATAGS contract signing in 3–4 months underpin a near-40% defense growth target, though series deliveries are 15–18 months away.
- Castings and JSA scaling fast: The ferrous castings business is on a ₹1,000 crore annualized run-rate path within 6–8 quarters, with margins set to expand 250–300 bps, while JSA grew revenue 20% and targets ₹1,000 crores top-line in two years.
- Demand signals are mixed and regionalized: India PV rebounded sharply on new customer ramp-ups, North American CV is expected to grow 10% in H2 FY26, but Europe remains flat and unpredictable, and US tariff policy is an unresolved overhang.
- What to watch next quarter: Whether the ATAGS contract is signed, any concrete restructuring plan from the six-month manufacturing review, and whether US infrastructure-linked demand actually materializes once "shovel hits the dirt."
Overseas Operations: The Core Problem
- European losses persistent: Weak utilization from anemic demand across CV and PV exports, combined with the EV-to-ICE transition at OEMs, kept European PBT losses in the ~₹90 crore ballpark, with management needing two more quarters for clarity on the path forward.
- US improving but still loss-making: EBITDA losses narrowed to ~₹6 cr/quarter at 60% utilization after significant cost reduction and efficiency gains, and management expects fairly good progression in the next six months.
- Manufacturing footprint under review: A thorough review of the global manufacturing footprint is underway, driven by policy uncertainty and the question of whether the world is moving toward regional rather than global supply chains. A concrete way forward is promised within six months.
- No quick fix on losses: Management aims to reduce overseas losses but offered no quantified trajectory, only that FY26 profitability may improve because of lower subsidiary losses.
Amit Kalyani: "Quite frankly, disappointing has been the overseas operations. A combination of weak utilization because of demand reduction in Europe, and also in the US saw a demand slowdown. There is a huge transition taking place between this EV to ICE again."
Aerospace & Defense: The Growth Anchor
- New aerospace facility approved: A first-of-its-kind machining facility in India for landing gear components, plus a ring mill for high-precision jet engine forgings, backed by a long-term agreement with a European partner to supply global OEMs. The facility is expected to be operational toward the end of CY27, taking about 18 months to build.
- Revenue ambition is material: Management targets triple-digit quarterly aerospace revenue in FY26 and sees a path from crossing USD 100 million toward USD 150 million and USD 200 million. Aerospace grew ~25% in the quarter.
- Defense order book accretion imminent: Domestic ATAGS orders and other new contracts are expected to be tied up before March-end, with contract signing in the next 3–4 months. Series deliveries begin 15–18 months from now.
- Export defense converting faster: Products already in the "ready to make" category can translate export contracts into revenue in under six months, and the company has expanded the number of such products.
- New defense adjacencies: An MOU with L3Harris targets the C4I sector (defense electronics and systems for India), while participation in IDEX Abu Dhabi aims to increase visibility and market access.
- Defense growth guided at near-40% YoY: Process delays may trim this slightly, but management expects to catch up.
Amit Kalyani: "this is the first of its kind in India and will be a big boost to our overall aerospace capability and business and be unique for this part of the world."
Castings & JSA: The Margin Levers
- Ferrous castings scaling toward ₹1,000 crores: Subject to demand holding up, the annualized run rate is expected within six to eight quarters, driven by operating leverage, cost reduction, and product mix.
- Castings margin expansion committed: Margins are expected to increase by at least 250–300 bps from current levels over the next two to three years.
- JSA delivering strong growth: Revenue grew 20% with margins improving 50 bps to nearly 14%, supported by significant customer and product diversification over the last two years that has de-risked the revenue stream.
- JSA scale-up target: Expected to reach ₹1,000 crores top-line over the next two years.
Demand Environment by Market
| Market | Trend | Commentary |
|---|---|---|
| India PV | ▲ Sharp rebound | Better penetration with existing customers and new customers increasing mobilization; supplying new engine, transmission, and chassis components, especially transmission parts. EV components include rotor shafts and aluminum parts. Trend expected to continue despite broader slowdown. |
| India CV | ▬ Slightly better Q4 | Q4 expected slightly better than Q3; FY26 seen as more or less flat. |
| North America CV | ▲ Buoyant H2 FY26 | Expected ~10% growth, but weighted to the second half of the year. Tariff impact on Class-8 trucks remains unclear. |
| Europe CV | ▼ Flat, unpredictable | Too unpredictable to call; anemic demand continues. |
| Export industrials | ▲ Mixed but net positive | Oil and gas grew significantly; aerospace grew ~25%. High-horsepower engines degrew temporarily on inventory destocking; rail saw a small dip. |
| US infrastructure | ▲ Anticipated | Management expects a big infrastructure boom in the US (pipelines, construction, power gen equipment) once "shovel hits the dirt," creating a virtuous cycle across sectors. |
- Tariff overhang unresolved: Management has no clarity on US steel and aluminum tariffs, including how they will be calculated, the base, or the applicable HSM codes. EPA emission regulation timing under the current US regime is also uncertain.
Amit Kalyani: "We are in unpredictable times, we are in times where in addition to all the geopolitical issues, we also have new governments making new policies, so we have to wait and watch and see what that means."
Nuclear & Emerging Opportunities
- Nuclear positioned as a multi-decade opportunity: Two facets: conventional large nuclear power plants (700 MW to 1,400 MW per unit, multiple units per location) and small modular reactors driven by data center energy demand, EVs, and non-fossil fuel generation requirements. India's installed nuclear base of ~10,000–11,000 MW is expected to more than triple in the next 10 years.
- Policy tailwind emerging: The Indian government has talked about allowing SMRs and private sector participation, though timelines remain vague.
- Semiconductor entry too early to detail: Management acknowledged news reports of a possible semiconductor entry but declined to provide specifics, saying it is too early to discuss in detail.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| ATAGS contract signing | Domestic ATAGS and other new defense orders tied up | Next 3–4 months, possibly sooner |
| ATAGS series deliveries start | Series production deliveries begin | 15–18 months from now |
| Manufacturing footprint review | Concrete way forward on overseas manufacturing presence | Within six months |
| Ferrous castings run rate | Annualized run rate of ₹1,000 crores | Within 6–8 quarters, subject to demand |
| Ferrous castings margin expansion | Margins to increase by at least 250–300 bps from current levels | Next 2–3 years |
| JSA top-line scale-up | Scale up to ₹1,000 crores top-line | Next two years |
| Aerospace quarterly revenue | Triple-digit quarterly revenue | FY26 (not Q1 FY26) |
| Aerospace facility operational | New landing gear and engine components facility | Toward end of CY27 (~18 months) |
| Defense revenue growth | Close to 40% YoY growth, possibly a little less due to process delays | FY26 |
| Standalone CAPEX | ~₹300 crores | FY26 |
| Subsidiary CAPEX (India) | Not exceeding ₹200–₹250 crores | FY26 |
| US CAPEX | CAPEX for the US is done | No further major spend indicated |
| Overseas loss clarity | Full clarity on decision to reduce losses | Two quarters more |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Standalone revenue | ₹2,096 cr, lower by about 7% YoY |
| Standalone operating margin | 28.1%, stable despite soft demand conditions |
| Standalone ROCE (net of cash) | ~19% |
| Standalone order wins | ₹723 cr in Q3 |
| Consolidated nine-month revenue | ₹11,270 cr, 2% lower YoY |
| Consolidated nine-month EBITDA | ₹2,087 cr, grew 9.1% YoY |
| Consolidated nine-month EBITDA margin | 18.5%, up 190 bps YoY |
| Consolidated nine-month PBT | ₹1,224 cr, increased 50% YoY |
| Consolidated ROCE | 16.5% as of Dec '24 |
| Net debt to equity | 0.36x as of Dec 31, '24 |
| New business secured (Apr–Dec) | ₹2,616 cr across defense, aluminum, ferrous castings, and core forging |
| Group defense revenue | ₹337 cr in Q3; nine-month revenue ₹1,488 cr, 49% YoY growth |
| Defense executable order book | ₹5,700 cr as of Dec 31, '24 |
| JSA revenue | ₹166 cr, grew 20% YoY |
| JSA operating margin | ~14%, improved 50 bps YoY |
| European operations EBITDA | ₹10 cr in Q3 |
| US operations EBITDA loss | ₹6 cr, reduced from prior levels |
| US operations utilization | ~60% |
| Aerospace quarterly revenue | ₹50–₹60 cr, expected to reach triple-digits per quarter in FY '26 |
| Oil and gas growth | 60–70% YoY in Q3; 30% growth in nine months |
| FY '26 standalone capex guidance | ~₹300 cr |
| FY '26 subsidiary capex guidance | ₹200–₹250 cr, only in India |
| FY '26 overall outlook | Flat revenue, with profitability improvement expected from reduced overseas losses |
| North American CV market outlook | 10% growth expected, in second half of the year |
| Ferrous castings annualized run rate target | ₹1,000 cr within six to eight quarters |
| Ferrous castings margin expansion target | 250–300 bps increase in next two years |
| European business PBT loss | ~₹90 cr (per an analyst's math) |