Key Takeaways
- Record margins, weather-hit volumes: EBITDA margin hit an all-time high of 28.66% on raw material tailwinds and carbon credit sales, but extended monsoons kept offtake below expectations.
- Pricing discipline is the real margin story: Even stripping out the one-off carbon credit profit, gross margins stayed substantially higher than past levels, confirming the market is absorbing better realizations.
- Wada plant is the near-term catalyst: Construction is at full swing with machines on site; commercial production is set to begin "very soon," making BIGBLOC the largest AAC manufacturer in India by 2024.
- FY24 ambition is aggressive: Management guided for ₹400-500 cr top line in FY24, roughly doubling from the FY23 guide, contingent on Wada ramp-up and JV execution.
- What to watch next quarter: The Wada plant's actual commercial start date, the pace of volume recovery in the construction-heavy H2, and closure of the Kapadvanj JV land acquisition.
Margin Performance & Raw Material Tailwinds
- Highest-ever EBITDA margin: 28.66% in Q2 FY23, lifted by a correction in most raw material prices as the global economy slowed, plus a ~₹1.4 cr contribution from carbon credit sales.
- Pricing discipline confirmed: Gross margin, even after removing the ~₹1.5 cr carbon credit profit from ~₹32 cr gross profit, remained substantially higher than historical levels, indicating the market is sustaining better realizations.
- Fly ash cost structurally protected: The company uses pond ash, not fresh ESP fly ash, and obtains it free of cost, paying only transportation. Management sees no risk of charges being levied because pond ash consumes land space at thermal power plants.
- Raw material volatility normal: Quarter-on-quarter fluctuations of 5-10% in raw material prices are expected and manageable.
- Realization uplift: Average sales price improved from ~₹3,520/cubic meter in FY22 to ~₹4,380/cubic meter in H1 FY23, driven by faster AAC block adoption and the product replacing lower-priced red bricks.
Mohit Saboo: "On a long-term basis, I think EBITDA margins of somewhere between 20-25% are easily sustainable."
Volume: The Monsoon Drag & H2 Recovery Bet
- Q2 offtake disappointed: Volumes were lower than expected because of an extended monsoon season and torrential rains; Q2 is typically a lean quarter for construction activity.
- YoY comparison distorted: Last year's Q2 volumes were unusually high because Q1 FY22 was depressed by the third COVID wave, shifting demand into Q2, and rains were less severe.
- H2 capacity utilization expected better: Construction activity in India is concentrated in October through March, while May through September is slower due to post-Holi labor shortages and the monsoon. Management expects this seasonal pattern to drive higher utilization in H2.
- Volume growth guided at 8-10%: With the Wada capacity addition, volume growth of roughly 8-10% is expected versus FY22.
Wada Plant & Capacity Expansion
- Wada plant at full swing: Construction is running at full speed; the majority of machines have been dispatched and have arrived at the plant. Commercial production is set to start "very soon."
- Largest AAC manufacturer by 2024: With the ongoing capacity enhancement, the company stated it will become the largest AAC manufacturer in India by 2024.
- JV land acquisition in final stages: Land acquisition for the Kapadvanj JV plant is in the finalization stages, with due diligence being completed. Management intends to complete it "within a very short span of time."
- JV timeline has slipped: The JV was delayed by memorandum signing and land acquisition; earlier guidance pointed to June 2023 commercialization, while the annual report mentioned H1 FY24.
- JV CAPEX funding lined up: Talks with the bank have already happened; once land acquisition is complete, funding will be in place.
Carbon Credits: A Recurring, Lumpy Contributor
- Q2 sale: Sold ~43,000 carbon credits accumulated up to July 2021 at roughly \$4.10 per unit, contributing ~₹1.4 cr to the quarter.
- Annual generation: The Umargoan unit generates 60,000-65,000 credits annually.
- Next batch in audit: The audit process is underway for credits from August 2021 through September 2022, with ~65,000-70,000 credits expected to be issued.
- Kapadvanj registration in process: The JV unit is in the process of registration; once registered, it is expected to generate 40,000-50,000 credits annually.
Balance Sheet & Governance Clean-Up
- Debt reduction: The debt-equity ratio improved from 0.91 to 0.74 as the company paid down debt.
- Credit rating withdrawal stuck: Facilities of SCC Bank were taken over by Axis Bank, and the company has been following up for two months to get the credit rating withdrawn. The rating agency is asking for NOCs from other banks, including for truck and vehicle loans, which management says is "not required at all." A call is being set up to resolve the matter.
- Auditor qualification on employee benefits: The company has not provisioned for post-retirement employee benefits under IndAS 19 for the last 5-6 years. The matter is being taken up, and provisioning is expected to start this year, with no such qualification expected in the current balance sheet.
- Product innovation underway: The company is supplying sand-based material in the Ahmedabad region in addition to fly ash, and is doing contract manufacturing for Ambuja with very high-strength material.
The Order Book Question
- No formal order book exists: The company does not carry a formal, quantified order book. Instead, it relies on unsaid commitments from the majority of builders it supplies, who treat BIGBLOC as the preferred supplier for their sites.
- Pricing outlook stable to positive: Management expects pricing to either continue at the same level or increment.
Manish Saboo: "We do have an unsaid commitment from majority of all the builders whoever we are supplying our materials to, that for these sites we are the preferred supplier. I think that's where the gap is."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Wada plant commercial production | Start of commercial production | "Very soon" |
| JV land acquisition | Complete land acquisition for Kapadvanj plant | "Within a very short span of time" |
| FY23 top line | ₹200-250 cr | FY23 |
| FY24 top line | ~₹450-500 cr | FY24 |
| Sustainable EBITDA margin | 20-25% | Long-term |
| Volume growth vs FY22 | ~8-10% (with Wada capacity addition) | FY23 |
| Employee benefits provisioning | Start provisioning under IndAS 19; no qualification expected in current balance sheet | This year |
| Credit rating withdrawal | Resolution of stuck withdrawal procedure | After call with rating agency |
| Carbon credit issuance (next batch) | ~65,000-70,000 credits from Aug 2021-Sep 2022 period | Post-audit |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue from operations | ₹49 cr, up 18% YoY |
| EBITDA | ₹14 cr, up over 130% YoY |
| EBITDA margin | 28.66%, highest ever; carbon credits aided margin |
| Net profit | ₹9 cr, up 175% YoY |
| PAT margin | 17.53% |
| H1 FY23 revenue | ₹104 cr, up 50% YoY |
| H1 FY23 EBITDA margin | 25.19% |
| H1 FY23 PAT margin | 16.25% |
| Debt-equity ratio | 0.74, improved from 0.91 at FY22 end |
| FY23 top-line guidance | ₹200-250 cr |
| FY24 top-line guidance | ₹400-500 cr |
| Carbon credits sold | 43,000 units, contributed ~₹1.4 cr to revenue |
| Carbon credit selling price | \$4.10 per unit, previous sale at \$2.50 |
| Volume growth expectation | 8-10% with Wada capacity addition |
| Order book duration | 8-10 days, up from 3-4 days earlier |