Key Takeaways
- Volume-led revenue growth, margin squeeze: Revenue grew ~23% YoY to ~₹83 crores on 13% volume growth, but EBITDA margins stayed under pressure from a ~8-12% raw material cost spike that was only partially passed through.
- Utilization ramp is the operating leverage story: H1 capacity utilization jumped to ~69% from ~56% a year ago, and October hit a record month, setting up a path to margin recovery as fixed costs spread over higher throughput.
- Competitive capacity is quietly exiting: Management hears from bankers that some new industrial AAC block units have shut shop and plants are up for sale, while no major expansion came online in its operating regions during H1.
- AAC panels are a small but real growth option: Panels contributed ~5-6% of H1 volume, with an AdaniConneX data center order won, bullet train stations underway, and more large conglomerate orders near closure.
- What to watch next quarter: Whether the remaining ~5-7% of unpassed raw material cost increases actually get pushed through in H2, whether utilization reaches the targeted 75%, and whether the Madhya Pradesh expansion decision firms up in the upcoming 1 or 2 quarters.
Volume Growth & Capacity Utilization
- H1 volume engine: Sales volume grew 22% YoY to 4,46,769 cubic meters in H1, with Q2 alone up 13% YoY, driven by growing market acceptance and deepening customer relationships.
- Utilization leap: H1 utilization reached 68.74% versus ~56-57% in H1 FY26, a ~17-18% improvement that shows the expanded manufacturing base is steadily ramping.
- Record October signal: October 2026 marked the highest ever monthly turnover and sales volume, reflecting growing product acceptance and market presence expansion heading into the seasonally stronger H2.
- H2 seasonality tailwind: The second half of any financial year is traditionally a far better demand scenario than H1, and management is confident of achieving better utilization up to 75% in H2.
- Expansion trigger approaching: Management will look at further capacity expansion in the upcoming 1 to 2 quarters, mostly because it has 95%+ utilization levels.
Saboo: "So, we are at almost 68%-69% capacity utilization in H1. And we will be looking at further expansion in the upcoming 1 to 2 quarters, mostly because we have 95%+ utilization levels."
Margin Dynamics & Input Cost Pressure
- Raw material cost spike: Lime prices rose 3-4%, aluminum powder prices jumped almost 15-20% in Q2 versus Q1, and coal prices rose drastically, all linked to inflationary pressure from the ongoing West Asia war.
- Calibrated pass-through: Input costs rose ~8-10% but management passed on only ~5-7%, holding back during the monsoon period to remain competitive rather than risking volume loss.
- Monsoon double hit: Rains increase the density of AAC blocks, which raises transportation cost and adds to margin pressure, while also reducing solar generation at plants.
- H2 pass-through confidence: Management is confident of passing on the remaining unpassed raw material cost increase of about 5-7% in the running quarter, supported by peak construction activity and strong October demand.
- Aluminum powder reversal: A partial reversal in aluminum powder prices was observed in October, offering some relief on the input side.
- Operational efficiency levers: Deployment of electric forklifts across all four plants in Q3 and boiler automation across three plants by Q4 are expected to improve EBITDA margins by about 2-3%.
Saboo: "We have taken a calibrated approach to pricing rather than passing through the full increase in input costs immediately. We intend to pursue gradual price revisions across markets while remaining competitive and working to protect margins."
Competitive Landscape & Market Structure
- Capacity exiting, not entering: In H1 FY27, no major capacity expansion came up in the regions where the company operates; some new industrial AAC block units that started have reportedly shut shop, with plants up for sale.
- Red brick cost advantage widens: Red bricks are currently ~10-15% more expensive than AAC blocks, and transportation cost is a big factor since red brick density is 3x that of AAC blocks, supporting continued industry-level conversion.
- Incumbent stickiness: The company has retained reputed customers like L&T, Runwal, Sunteck, and Capacit'e Infraprojects over 10-12 years through quality, services, relationship building, and its own truck fleet enabling timely delivery to specific site requirements.
- Competition rising but manageable: Competition has been increasing over the last 12-15 months, yet the company continues acquiring newer customers on a month-on-month basis across regions.
Saboo: "So, in the last H1 of FY '27, we are not aware of any major capacity expansion which has come up in the regions where we operate currently. Rather, a few of the new industrial AAC block units which have started have maybe shut shop because that is what we have heard from a few of our bankers that they have come across few of the plants which are up for sale."
AAC Panels: The Category Creation Bet
- Early-stage contribution: AAC panels contributed ~5-6% of H1 FY27 volume, manufactured at only one of the four units, as the company builds a market for a product it describes as a category creation effort.
- Credential-building orders: Over the last 18-24 months, orders have been won from ITC, bullet train stations, Foxconn factories, and Embassy Group, with an AdaniConneX data center order in Hyderabad added this quarter.
- Large order pipeline near closure: The company is in talks with a few other large conglomerates and is almost on the verge of finalizing a few large orders for AAC panels, including from the AdaniConneX data center.
- Bullet train station momentum: A couple of bullet train stations are being executed and a couple of other stations from Mumbai to Ahmedabad are almost finalized for walling requirements.
Saboo: "It is a totally new product for which we are doing a category creation. And in this journey of about last 18 to 24 months, we have been able to click few good orders, the likes of ITC as well as upcoming bullet train stations."
New Initiatives & Balance Sheet
- Construction chemicals entry: The business started in Q1 FY27, shifting from white-labeled supply to own manufacturing; current capacity utilization is on the lower side but new products are being introduced to improve it, with the plant potentially generating revenue of about ₹20-25 crores.
- Solar capacity build-out: Rooftop solar installations across manufacturing facilities have taken aggregate installed solar capacity to approximately 3.5 MW, though Q2 generation was lower due to monsoons.
- Credit insurance safeguard: A credit insurance policy from Tata AIG has been taken to safeguard open credit receivables from builders and contractors, covering a few large corporates regularly dealt with, against a backdrop of some liquidity squeeze in the market.
- Receivables cycle: Turnover increased almost 30-32% YoY while the recovery cycle runs 70-80 days, with a little bit of a liquidity squeeze observed in the market.
- Madhya Pradesh land ready, construction on hold: All necessary formalities including government approvals and CPCB plan pass are completed, but construction activities have not begun, with a decision expected in the upcoming 1 or 2 quarters.
Saboo: "We have not begun construction activities at this facility for the time being, looking at the overall economical scenario as well as the geopolitical situations. We will decide on the expansion in the upcoming 1 or 2 quarters."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cost pass-through | Pass on remaining ~5-7% unpassed raw material cost increase | Running quarter (Q3 FY27) |
| Capacity utilization | Achieve better utilization up to 75% | H2 FY27 |
| EBITDA margin improvement | Electric forklifts and boiler automation to improve margins by ~2-3% | Q3 and Q4 FY27 (completion) |
| Capacity expansion decision | Decide on further expansion, triggered by reaching 95%+ utilization | Upcoming 1-2 quarters |
| Madhya Pradesh expansion decision | Decide whether to begin construction at the MP facility | Upcoming 1-2 quarters |
| Realizations | Continuously concentrate on improving realizations | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹83 cr, ~23% YoY |
| EBITDA | ₹3 cr, +74% YoY |
| EBITDA margin | 3.98%, expanding 116 bps YoY |
| Net loss | ₹2.75 cr |
| Sales volume | 2,25,241 cubic meters, +13% YoY |
| Capacity utilization | 69.34% |
| H1 FY27 revenue from operations | ₹162 cr, ~31% YoY |
| H1 FY27 EBITDA | ₹10 cr (vs ~₹3 cr in H1 FY26) |
| H1 FY27 EBITDA margin | 5.93%, expanding 334 bps YoY |
| H1 FY27 net loss | ₹3.5 cr |
| H1 FY27 sales volume | 4,46,769 cubic meters, +22% YoY |
| H1 FY27 capacity utilization | 68.74% |
| H2 FY27 capacity utilization target | better utilization up to 75% |
| Input cost increase | 8% to 10% (lime, coal, etc.) |
| Cost increase passed on to customers | 5% to 7% |
| Production cost increase | about 8% to 12% |
| AAC blocks volume share (H1 FY27) | 87%-88% |
| AAC panels volume share (H1 FY27) | 5%-6% |
| Construction chemicals volume share (H1 FY27) | 5%-6% |
| Industry average realization | ₹3,500-3,600 per cubic meter |
| Recovery cycle | 70 to 80 days |
| Customer retention | 60%-65% over last few years |
| Debt-to-equity | 1.4x; adjusted for promoter unsecured loans: 1.2x |
| Aggregate installed rooftop solar capacity | 3.5 MW |
| Company-owned truck fleet | 70-75 trucks |
| Construction chemicals plant potential revenue | ₹20-25 cr |
| Operational efficiency EBITDA margin improvement target | 2% to 3% over next 1-2 quarters |